wer backup for the Niirala international border crossing point (Power backup for the Niirala international border crossing point)
Start date: Mar 31, 2006, End date: Dec 30, 2006 PROJECT  FINISHED 

The Niirala border station did not have backup power. The backup power system was to ensure the availability of electricity at the international border crossing point in exceptional conditions, thus ensuring that the data communication connections and most important terminals would function and border traffic would flow as usual in all conditions. Otherwise, manual inspection methods would have to be used during power outages, which would slow border inspections significantly. 50 percent of the project funding was received from the European Regional Development fund and 50 percent from the Finnish Border Guard. Achievements: Backup power at the Niirala international border crossing point was implemented in the project: • by purchasing a backup power source and power storage container with sufficient capacity • by purchasing UPS equipment with sufficient capacity for the purpose • by undertaking the necessary electrical work and structures for the backup power source and in order to implement and utilise the documenting system. As a result of the completed investments, the international border crossing point can now function during power outages under normal readiness conditions and power supply is now secured under exceptional conditions.
Up2Europe Ads

Coordinator

Details

  • 100%   158 600,00
  • 2000 - 2006 Euregio - Karelia  (FI-RU)
  • Project on KEEP Platform