ESPON Database 2013 - Phase II (ESPON Database 2013 ..)
ESPON Database 2013 - Phase II
(ESPON Database 2013 - Phase II (M4D))
Start date: Jan 31, 2011,
End date: Nov 30, 2014
PROJECT
FINISHED
Taking as starting point the achievements of the Project “ESPON Database 2013” (Phase I) and the results and discussions from the ongoing ESPON Project on “Territorial Indicators and Indices” (INTERCO), this project shall maintain, update, develop and further expand the ESPON 2013 Database. In this framework, the main European activities carried out to promote data comparability and data quality, in particular the INSPIRE Directive and the GMES (Global Monitoring for Environment and Security) initiative will be taken into consideration. In general, the ESPON 2013 Database shall supply different users (ESPON community and general public), including researchers, policy makers and stakeholders at regional and local level, with data, indicators and (visualisation) tools in the field of European territorial development and cohesion needed for policy formulation, application and monitoring at different geographical levels. The data managed by the project originates from European institutions such as EUROSTAT and EEA, and from all ESPON projects. By doing this, the ESPON 2013 Database shall contribute to better understanding of territorial structures, the current situation and past and future trends of different types of European territories in relation to the various geographical contexts (from local to global) and within a large variety of themes Achievements: Reports:Draft Final Report - Main Report PDF Draft Final Report - Functional Urban Areas (FUA) and European harmonization PDF Draft Final Report - Local data in M4D PDF Draft Final Report - OLAP PDF Draft Final Report - Data Quality Check: Methods & Procedures PDF Second Interim Report - List of Deliveries PDF Second Interim Report - Main Report PDF Second Interim Report - Swot analysis PDF Second Interim Report - Functional Indicators Computations PDF Second Interim Report - Populating Urban DB Method PDF Second Interim Report - Construction FUA PDF Second Interim Report - Urban Time Series PDF Second Interim Report - Strategical Framework PDF Second Interim Report - European Neighboring cities PDF First Interim Report PDF First Interim Report - Annex Technical Report "Local and regional data" PDF First Interim Report - Annex Technical Report "Detecting and Handling Anomalous Data in M4D" PDF First Interim Report - Annex Technical Report "Time Series Analysis" PDF Inception Report PDF Project Specification PDF http://www.espon.eu/main/Menu_Projects/Menu_ScientificPlatform/espondatabase2013phaseII.html
Get Access to the 1st Network for European Cooperation
Log In