Creating ecological sites in the cross -border IJzer river catc hment area (CRESETY)
Start date: Oct 31, 2010, End date: Oct 30, 2014 PROJECT  FINISHED 

In the IJzer water catchment area, one of the main problems is the flood risk. As the water does not stop at the border, and therefore the entire cross-border area is involved, many residents, businesses and farmerswere affected by the floods.To limit the flood risks in the cross-border IJzer water catchment area, water is retained at the furthest possible point upstream to improve the protection of urban areas downstream.