Construction of Panemune and Sovetsk by-pass with .. (ILPR.01.02.01-72-007..)
Construction of Panemune and Sovetsk by-pass with a bridge over Neman River
(ILPR.01.02.01-72-007/10-00)
Start date: Jan 1, 2013,
End date: Dec 31, 2014
PROJECT
FINISHED
The overall objective of the project is to contribute to improvement of traffic conditions of the IA Pan-European Transport Corridor by improving the conditions for transit and long distance traffic and reducing the problems caused by the traffic with which inhabitants of Panemune settlement (Lithuania) and Sovetsk town (Russia) are encountering. Achievements: 1. Road section 4 kilometres long is constructed.2. The fly-over (crossover) the old water course of the river Neman 0.463 km in length on the road leading towards the bridge is constructed.3. The bridgehead (length – 0.085 km) providing connection with the new bridge which should be built over Neman river by the Russian Federation is constructed.