Search for European Projects

10 European Projects Found

Searched on 125080 European Projects

 FINISHED 

ENERGY EFFICIENT DEMO MULTIRESIDENTIAL HIGH RISE BUILDING (EE-HIGHRISE)

Start date: Jan 1, 2013, End date: Dec 31, 2015,

The overall objective of the project is to demonstrate and validate new technologies, concepts, and systems used in EE-HIGHRISE project, in order to test and assess the technological and economical feasibility of innovative energy solutions in high rise demo building Eco Silver House. Demo high rise building Eco Silver House is located in the city centre of Ljubljana. The net total area covers the ...
Read Project

 10

 FINISHED 
Current methods to provide fire protection of light steel structures lack performance and has resulted in a decrease in structural steel market share. State-of-the-art intumescent coatings (ICs) is not a robust technology due to extensive coating and drying times, and low fire resistance (FR) values. There have not been any innovative solutions to overcome such problems in the last few years, resu ...
Read Project

 7

 FINISHED 
The increasing cost of traditional energy sources and the availability of new emerging building technologies in lighting, heating, ventilation, air conditioning, isolation, energy monitoring and management of the buildings, are expected to increase the global market for low carbon solutions. However, some financial, organizational and social innovation enablers are required to leverage the transfo ...
Read Project

 19

 FINISHED 
40% of energy consumption and 36% CO2 emissions in Europe are directly related to the buildings due mainly to inefficient insulation materials and systems. Currently required insulation performance may only be achieved either by installing extremely thick ordinary insulation materials and sacrificing living spaces or by using unaffordable the state-of-the-art insulation materials (e.g. silica aero ...
Read Project

 8

 FINISHED 
New building strategies addressing climate change effects and reduction of heating/cooling energy are two fundamental issues at EU level. Figures as the 35,000 excess deaths attributed to the last heat wave in the continent in 2003, or 10% of the world’s energy being used just for heating of buildings support European citizen’s concerns and new EU legislation. New national and communitarian string ...
Read Project

 11

 FINISHED 
The overall objective of OPEN HOUSE is to develop and to implement a common European transparent building assessment methodology, complementing the existing ones, for planning and constructing sustainable buildings by means of an open approach and technical platform. OPEN HOUSE will develop a transparent approach able to emerge collectively in an open way across the EU. This approach will be commu ...
Read Project

 20

 FINISHED 

Multi-source Energy Storage System Integrated in Buildings (MESSIB)

Start date: Mar 1, 2009, End date: Feb 28, 2013,

The overall objective of MESSIB is the development, evaluation and demonstration of an affordable multi-source energy storage system (MESS) integrated in building, based on new materials, technologies and control systems, for significant reduction of its energy consumption and active management of the building energy demand. This new concept will reduce and manage smartly the electrical energy req ...
Read Project

 24

 FINISHED 

INNOVATIVE FIRE PROTECTIVE COATINGS FOR STEEL STRUCTURES (STEELPROST)

Start date: May 1, 2010, End date: Oct 31, 2012,

Current methods to provide fire protection of light steel structures include the nowadays most efficient approach of intumescent paints, which are typically applied on-site on a mounted structure using brushes or spray guns. Such treatments are generally achieved through the preparation of the surface by grit/shot blasting, followed by the application of a primer, and followed by the application o ...
Read Project

 11

 FINISHED 
The overall technological aim is to develop a mould-brick acoustic solution based on noise absorption and insulation due material density and porosity that will at least increase levels in 6 dB in performance but at a 20% lower weight and will avoid or minimize noise flanking. The acoustic insulation and absorption of the brick will be achieved by developing the concept of layers oand forms in the ...
Read Project

 9

 FINISHED 
The driving idea of REG CON is the advancement of the concept of “R&D based clustering” across regions of Europe with a thematic focus on construction. This sector is both dynamic in creation of growth and employment [~7% of national employment/GDP, ~14% when add design and materials], but relatively backward in absorbing innovation. The Strategic Research Agenda prepared by European Construction ...
Read Project

 15