Search for European Projects

8 European Projects Found

Searched on 125080 European Projects

 FINISHED 

Large Additive Subtractive Integrated Modular Machine (LASIMM)

Start date: Oct 1, 2016, End date: Sep 30, 2019,

The LASIMM project aim is to develop a large scale flexible hybrid additive/subtractive machine based on a modular architecture which is easily scalable. The machine will feature capabilities for additive manufacture, machining, cold-work, metrology and inspection that will provide the optimum solution for the hybrid manufacturing of large engineering parts of high integrity, with cost benefits of ...
Read Project

 10

 FINISHED 
The overall concept of MANTIS is to provide a proactive maintenance service platform architecture based on Cyber Physical Systems that allows to estimate future performance, to predict and prevent imminent failures and to schedule proactive maintenance. Maintenance is no longer a necessary evil that costs what it costs, but an important function that creates additional value in the business proces ...
Read Project

 47

 FINISHED 

Future Deep Sea Wind Turbine Technologies (DeepWind)

Start date: Oct 1, 2010, End date: Sep 30, 2014,

The hypothesis of this project is that a new wind turbine concept developed specifically for offshore application has potentials for better cost efficiency than existing offshore technology. Based on this hypothesis the objectives are: i)to explore the technologies needed for development of a new and simple floating offshore concept with a vertical axis rotor and a floating and rotating foundation ...
Read Project

 12

 FINISHED 

Demonstration of the WindFloat Technology (DEMOWFLOAT)

Start date: Jul 15, 2011, End date: Jul 14, 2014,

...s in the unique position to leverage significant pre-existing financial and intellectual capital invested by the project coordinator, WindPlus in a PILOT unit installation of the WindFloat with a 2MW Vestasturbine. WindPlus joint vesnture partners and Consortium members of the Project, realize that the design, fabrication and installation of a WindFloat unit is only the first step towards a full ...
Read Project

 12

 FINISHED 
There is a tendency to higher power offshore wind turbines, leading to larger turbine towers (5m diameter and greater) and a requirement for large diameter connection flanges between the tower sections and between the tower and foundation transition pieces. Currently, forged rings are specified, with inherently high cost and few suppliers worldwide. This leads to long lead times and higher costs f ...
Read Project

 7

 FINISHED 
Piezoelectric multilayer actuators performance and reliability needs to be improved to meet the growing demand from end-users with many different types of applications. The high production costs and problems related to obtaining reliable components explain that the utilization of piezo actuators up to now is far from having reached its full potential. Noliac and its partners for the IP are proposi ...
Read Project

 15

 FINISHED 
A key socio-economic challenge for Europe is: how to deal with a climate change, while meeting rapidly increasing demand for energy and ensuring security of supply? Wind energy can be a significant part of the answer. The new frontier of the wind industry is large-scale offshore wind farms. While promising, considerable research and development tasks remain to be carried out before it reaches its ...
Read Project

 6

 FINISHED 
During recent years, wind energy has moved from an emerging technology to become a nearly competitive technology. This fact, coupled with an increasing global focus on environmental concern, as e.g. expressed in the Kyoto protocol, and a political desire on a certain level of diversification in the energy supply, ensures wind energy an important role in the future electric energy supply market. An ...
Read Project

 8