Search for European Projects

14 European Projects Found

Searched on 125080 European Projects

 FINISHED 

Zero Emission bUs Systems (ZEEUS)

Start date: Nov 1, 2013, End date: Apr 30, 2017,

Electrification of the public transport is a raising trend in Europe, and electric buses are soon expected to enter markets as one of the most interesting options for matching urban environmental targets. Electrification is driven by both economics and politics. However, although technology is not yet fully matured and ready for wide commercialisation, a large demonstration project will facilitat ...
Read Project

 41

 FINISHED 
As the patterns of power generation and distribution are rapidly changing in Europe towards a highly dispersed and volatile system, Distribution System Operators need to completely change traditional ways of grid operations. Currently developed solutions to increase the intelligence of medium and low voltage grids to cope with this task are often highly specialized, non-replicable and therefore no ...
Read Project

 13

 FINISHED 
Torrefaction is considered worldwide as a promising key technology for boosting large-scale implementation of bioenergy. It involves heating biomass in the absence of oxygen to a temperature of 200 to 320 °C. As a result, the biomass looses all its moisture and becomes easy to grind and water resistant, which reduces the risk of spontaneous ignition and biological degradation and permits outdoor s ...
Read Project

 23

 FINISHED 

Innovative CO2 capture (iCap)

Start date: Jan 1, 2010, End date: Dec 31, 2013,

In post-combustion CO2 capture, a main bottleneck causing significant reduction in power plant efficiency and preventing cost effectiveness is the low flue gas CO2 partial pressure, limiting membrane flux, solvent selection and capacity. In pre-combustion CO2 capture, key bottlenecks are number of processing steps, possible low hydrogen pressure, and high hydrogen fraction in the fuel Global deplo ...
Read Project

 14

 FINISHED 
"The project aims at developing a unique device for electricity networks: A superconducting fault current limiter (SFCL) based on coated conductor YBCO tape (cc-tape) or 2nd Generation HTS tape. The general trend in Europe to a higher meshing of distribution networks and the rapid growing integration of renewable energy sources leads to an increase of the fault current level by every new installat ...
Read Project

 16

 FINISHED 

Research into Impacts and Safety in CO2 Storage (RISCS) (RISCS)

Start date: Jan 1, 2010, End date: Dec 31, 2013,

"Although significant leakage from CO2 storage sites is not expected, if it did occur there could be adverse environmental consequences, which are not well constrained. The objective of RISCS is to provide fundamental research on environmental impacts, necessary to underpin frameworks for the safe management of CO2 storage sites. To achieve this, RISCS will quantitatively assess environmental impa ...
Read Project

 23

 FINISHED 

Characterisation of European CO2 storage (SiteChar)

Start date: Jan 1, 2011, End date: Dec 31, 2013,

SiteChar will facilitate the implementation of CO2 storage in Europe by improving and extending standard site characterisation workflows, and by establishing the feasibility of CO2 storage on representative potential CO2 complexes suitable for development in the near term.Reasonable estimates of the theoretical capacities of storage sites have been undertaken in previous studies. We will develop a ...
Read Project

 17

 FINISHED 

CO2 Site Closure Assessment Research (CO2CARE)

Start date: Jan 1, 2011, End date: Dec 31, 2013,

CO2CARE aims to support the large scale demonstration of CCS technology by addressing the research requirements of CO2 storage site abandonment. It will deliver technologies and procedures for abandonment and post-closure safety, satisfying the regulatory requirements for transfer of responsibility. The project will focus on three key areas: well abandonment and long-term integrity; reservoir mana ...
Read Project

 23

 FINISHED 
"ADDRESS will research, develop and deploy technologies and processes to increase usage of Distributed Generation and Renewable Energy Resources thereby engaging in a new relationship between customers, generators and network operators. ADDRESS aims to develop new innovative architectures for Active Distribution Networks (ADN) able to balance in real time power generation and demand allowing netwo ...
Read Project

 27

 FINISHED 

European Value Chains for CO2 (ECCO)

Start date: Sep 1, 2008, End date: Nov 30, 2011,

The main objective of ECCO is to facilitate robust strategic decision making regarding early and future implementation of CO2 value chains for Europe in the face of uncertainty. The project will provide recommendations enabling cost-effective use of the CO2 being produced from zero-emission power plants and other industries in Europe by exploring the assets and challenges of CO2 for enhanced hydr ...
Read Project

 20

 FINISHED 
This project aims at paving the road towards large-scale, Europe-wide infrastructure for the transport and injection of CO2 from zero-emission plants. The project will prepare for the optimum transition from initial small-scale, local initiatives towards large-scale CO2 transport and storage that is to start around 2020, with key stakeholders in the field of carbon capture, transport and storage. ...
Read Project

 19

 FINISHED 
"Electric and plug-in hybrid vehicles (EV, PHEV) have the potential to contribute significantly to solving contemporary and future environmental and economic challenges of mobility. Various projects in different EU member states are currently addressing the subject in an isolated manner. The G4V consortium consisting of major European electric utilities and distinguished academic institutions are ...
Read Project

 14

 FINISHED 

CO2 Enhanced Separation and Recovery (CESAR)

Start date: Feb 1, 2008, End date: May 31, 2011,

"CESAR aims for a breakthrough in the development of low-cost post-combustion CO2 capture technology to provide economically feasible solutions for both new power plants and retrofit of existing power plants which are responsible for the majority of all anthropogenic CO2 emissions (worldwide, approx. 5,000 power plants emit around 11 GtCO2/year). CESAR focuses on post-combustion as it is the only ...
Read Project

 22

 FINISHED 
Reduction of energy consumption is a societal challenge that requires combination of technical, economical, and social means. So far, energy conservation has focused on new technologies and automation, treating users as passive consumers. However, strong evidence suggests that users can adapt actively their behaviour to energy saving with suitable feedback, support, and incentives, reducing signif ...
Read Project

 10