Search for European Projects

Over 40 European Projects Found

Searched on 125080 European Projects

 FINISHED 
The GeoERA proposal is put forward by the national and regional Geological Survey Organisations (GSO) of Europe. Its overall goal is to integrate the GSO’s information and knowledge on subsurface energy, water and raw material resources, to support sustainable use of the subsurface in addressing Europe’s grand challenges. The GeoERA consortium will organise and co-fund together with the EC a joint ...
Read Project

 45

 FINISHED 
The vision of EU-ToxRisk is to drive a paradigm shift in toxicology towards an animal-free, mechanism-based integrated approach to chemical safety assessment. The project will unite all relevant disciplines and stakeholders to establish: i) pragmatic, solid read-across procedures incorporating mechanistic and toxicokinetic knowledge; and ii) ab initio hazard and risk assessment strategies of chemi ...
Read Project

 43

 FINISHED 
The RUGGEDISED project will create urban spaces powered by secure, affordable and clean energy, smart electro-mobility, smart tools and services. The overall aims are:1. Improving the quality of life of the citizens, by offering the citizens a clean, safe, attractive, inclusive and affordable living environment.2. Reducing the environmental impacts of activities, by achieving a significant reducti ...
Read Project

 34

 FINISHED 

Optomechanics for Virology (VIRUSCAN)

Start date: Nov 1, 2016, End date: Oct 31, 2021,

Viral infections diagnosis demands novel, cheaper and rapid technologies to overcome present constraints. Current gold standard for diagnosis of viral infections is based on pathogen-targeted nucleic acid identification; thus, it cannot discern infectious stages from latent ones and it demands time consuming adjustments when mutations occur or new emerging viruses are to be included in the diagnos ...
Read Project

 10

 FINISHED 

RECAP: Research on European Children and Adults born Preterm (RECAP)

Start date: Jan 1, 2017, End date: Mar 31, 2021,

The project’s overall aim is to improve the health, development and quality of life of children and adults born very preterm (VPT, < 32 weeks of gestation) or very low birth weight (VLBW, < 1500g) – approximately 50 000 births each year in Europe – by establishing an ICT platform to integrate, harmonise and exploit the wealth of data from 20 European cohorts of VPT/VLBW children and adults and the ...
Read Project

 21

 FINISHED 

PRevention Of Malnutrition In Senior Subjects in the EU (PROMISS)

Start date: Apr 1, 2016, End date: Mar 31, 2021,

PROMISS (PRevention Of Malnutrition In Senior Subjects in the EU) is a multi-country project aiming to turn the challenge of tackling malnutrition in community-dwelling older persons into an opportunity for healthy ageing for the future. The PROMISS consortium contains worldwide expertise in epidemiology, clinical trials, geriatrics, nutrition, physical activity, microbiomics, as well as in behavi ...
Read Project

 24

 FINISHED 
The EU28 imports 77% of the protein it requires, for food or feed, representing an important vulnerability for our economy, risking our self-sufficiency and food security. Food waste is a top issue, representing losses costing €442/ton of produced food material, plus environmental and ethical problems in EU.GreenProtein aims at a major innovation for these two needs by producing high-added value, ...
Read Project

 9

 FINISHED 

Optical Infrared Coordination Network for Astronomy (OPTICON)

Start date: Jan 1, 2017, End date: Dec 31, 2020,

Europe has become a global leader in optical-near infrared astronomy through excellence in space and ground-based experimental and theoretical research. While the major infrastructures are delivered through major national and multi-national agencies (ESO, ESA) their continuing scientific competitiveness requires a strong community of scientists and technologists distributed across Europe’s nations ...
Read Project

 34

 FINISHED 
Environmental heating is a growing challenge for our community and problems are already experienced by millions of Europeans during the summertime and aggravated during heat waves or occupational settings. In addition to the well-known health risks related to severe heat stress, a number of studies have confirmed significant loss of productivity due to hyperthermia. Even if countries adopt the EU ...
Read Project

 21

 FINISHED 

Big Data Value ecosystem (BDVe)

Start date: Jan 1, 2017, End date: Dec 31, 2020,

The mission of BDVe is to support the Big Data Value PPP in realizing a vibrant data-driven EU economy or said in other words, BDVe will support the implementation of the PPP to be a SUCCESS.Behind that mission, there are multiple goals to achieve, which should be taken into full consideration when defining the directions of the PPP. Some of the most challenging ones are: (1) achieving a more comp ...
Read Project

 11

 FINISHED 
The rising life expectancy of EU citizens is creating a dramatic increase in age-related degenerative diseases and associated healthcare costs. The MOON Project (Multi-modal Optical Diagnostics for Ocular and Neurodegenerative Disease) meets this societal challenge by applying photonics to diagnose age-related diseases of the eye and central nervous system. Consistent with the ICT-29-2016: Photoni ...
Read Project

 6

 FINISHED 
... IVECO-ALTRA, CRF and VOLVO (also members of EUCAR, suppliers VALEO, BOSCH, JOHNSON MATTHEY and JSR MICRO (CLEPA), leading Engineering and Technology Companies/organizations and Universities with TNO, FRAUNHOFER, and VUB (EARPA). The majority are also active members of ERTRAC and EGVIA.The overall objectives of the ORCA project are: Reduce the TCO to the same diesel vehicle TCO level, targeting o ...
Read Project

 11

 FINISHED 

ENabling Onshore CO2 Storage in Europe (ENOS)

Start date: Sep 1, 2016, End date: Aug 31, 2020,

To meet the ambitious EC target of an 80% reduction in greenhouse gas emissions by 2050, CO2 Capture and Storage (CCS) needs to move rapidly towards full scale implementation with geological storage solutions both on and offshore. Onshore storage offers increased flexibility and reduced infrastructure and monitoring costs. Enabling onshore storage will support management of decarbonisation strateg ...
Read Project

 20

 FINISHED 
Most maritime products are typically associated with large investments and are seldom built in large series. Where other modes of transport benefit from the economy of series production, this is not the case for maritime products which are typically designed to refined customer requirements increasingly determined by the need for high efficiency, flexibility and low environmental impact at a compe ...
Read Project

 39

 FINISHED 
HORSE aims to bring a leap forward in the manufacturing industry proposing a new flexible model of smart factory involving collaboration of humans, robots, AGV’s (Autonomous Guided Vehicles) and machinery to realize industrial tasks in an efficient manner. HORSE proposes to foster technology deployment towards SMEs by developing a methodological and technical framework for easy adaptation of robot ...
Read Project

 15

 FINISHED 
The target of this project is to prepare and train future engineers for the design challenges and opportunities provided by modern optics technology. Such challenges include lossless photon management, modelling at the system, components and feature level, and the link between design and technology. Today all optical designs are often perceived following different approaches, namely geometrical op ...
Read Project

 13

 FINISHED 
DESTRESS is aimed at creating EGS (Enhanced geothermal systems) reservoirs with sufficient permeability, fracture orientation and spacing for economic use of underground heat. The concepts are based on experience in previous projects, on scientific progress and developments in other fields, mainly the oil & gas sector. Recently developed stimulation methods will be adapted to geothermal needs, app ...
Read Project

 16

 FINISHED 

Analysis System for Gathered Raw Data (ASGARD)

Start date: Sep 1, 2016, End date: Feb 29, 2020,

ASGARD has a singular goal, contribute to Law Enforcement Agencies Technological Autonomy and effective use of technology. Technologies will be transferred to end users under an open source scheme focusing on Forensics, Intelligence and Foresight (Intelligence led prevention and anticipation). ASGARD will drive progress in the processing of seized data, availability of massive amounts of data and ...
Read Project

 34

 FINISHED 
Five DSOs (CEZ distribuce, ERDF, EON, Enexis, Avacon) associated with power system manufacturers, electricity retailers and power system experts, propose a set of six demonstrations for 12 to 24 months. Within three years, they aim at validating the enabling role of DSOs in calling for flexibility sources according to local, time-varying merit orders. Demonstrations are designed to run 18 separat ...
Read Project

 20

 FINISHED 

Advanced Low Flying Aircrafts Detection and Tracking (ALFA)

Start date: Jan 1, 2017, End date: Dec 31, 2019,

The last decades witnessed the ever growing effectiveness of Europe-subsidized border protection projects like SIVE and SIVICC. As maritime smuggling from Morocco towards the European borders of Portugal and Spain was combatted more effectively, the criminal modus operandi changed drastically, approaching air routes with cheap and small planes. New drone technology opens opportunity to both manned ...
Read Project

 9

 FINISHED 
The InSCOPE project will set-up an open access pilot line service for Hybrid TOLAE (H-TOLAE) technologies capable of sampling products at TRL6-7. It positions itself in between R&D and industry and deploys a service for validating potential H-TOLAE products. Manufacturing progresses beyond R&D level (TRL5 towards 6) by improving processes, functionality and reliability allowing sampling at high qu ...
Read Project

 14

 FINISHED 

Capacitive Identification Tokens (CAPID)

Start date: Jan 1, 2017, End date: Dec 31, 2019,

Almost every person in Europe now has access to a connected touch device and the creation of new capacitive sensing devices has become easy and cost effective. Building on this, the CAPID project wants to develop ‘c-tokens’, that interact with these touchscreen and capacitive readers. C-tokens are thin and flexible, metal-oxide tags, integrated in paper and plastic products. The tags will send a d ...
Read Project

 7

 FINISHED 

Energy for Smart Objects (EnSO)

Start date: Jan 1, 2016, End date: Dec 31, 2019,

The goal of EnSO is to develop and consolidate a unique European ecosystem in the field of autonomous micro energy sources (AMES) supporting Electronic European industry to develop innovative products, in particular in IoT markets. In summary, EnSO multi-KET objectives are:• Objective 1: demonstrate the competitiveness of EnSO energy solutions of the targeted Smart Society, Smart Health, and Smart ...
Read Project

 36

 FINISHED 

Physical Activity and Nutrition INfluences In ageing (PANINI)

Start date: Jan 1, 2016, End date: Dec 31, 2019,

Life expectancy is increasing dramatically, but the period of good health (healthspan) enjoyed by most is not keeping pace, with implications for health, social care, and pensions resulting in estimated costs more than doubling by 2050. Thus, understanding the many factors that contribute to healthy ageing versus frailty, and validating interventions and influencing policy to promote healthy agein ...
Read Project

 8

 FINISHED 
...brought by industrial leaders: an embedded CPS with self-healing capabilities for planetary explorations (TASE-S&T), an ocean monitoring CPSoS (AS), and a Smart Travelling CPSoS for Electric Vehicle (TNO-CRF-S&T). CERBERO will automate multi-objective decisions to meet requirements and correct/optimized–by–construction designs. Interoperable components (i.e. DynAA by TNO, AOW by IBM, PREESM by INS ...
Read Project

 12

 FINISHED 

AUTOmated driving Progressed by Internet Of Things (AUTOPILOT)

Start date: Jan 1, 2017, End date: Dec 31, 2019,

"Automated driving is expected to increase safety, provide more comfort and create many new business opportunities for mobility services. The market size is expected to grow gradually reaching 50% of the market in 2035. The IoT is about enabling connections between objects or "things"; it’s about connecting anything, anytime, anyplace, using any service over any network. There is little doubt that ...
Read Project

 43

 FINISHED 
From government to consumer applications, personal identification is an ever increasing concern and demand. Fingerprints are the oldest and the most reliable features to be used because of their singularity and inalterability. The main goal of the PYCSEL project is to develop a low cost thin and large area fingerprint sensing surface enabling the personal identification via the development of a TO ...
Read Project

 9

 FINISHED 
Advanced aRchitectures for ultra-thin high-efficiency CIGS solar cells with high Manufacturability (ARCIGS-M)This project´s goal is advanced materials and nanotechnologies for novel CIGS PV device architectures with efficiencies ≥ 23.0 %, thus beyond that of the current state-of-the-art technologies. The technology targets the BIPV sector and enables several innovative solutions for BIPV.The novel ...
Read Project

 15

 FINISHED 

High Performance Laser-based Additive Manufacturing (HIPERLAM)

Start date: Nov 1, 2016, End date: Oct 31, 2019,

HIPERLAM is an SME driven Research and Innovation Action (RIA) well-aligned to the Factories of the Future (FoF) Initiative with a strong emphasis upon demonstrating superior cost and speed performance in end-to-end processes featuring laser-based additive manufacturing in two key applications requiring high resolution printed conductive metallic lines, namely laser printed RFID antenna and laser ...
Read Project

 8

 FINISHED 
The objective of the caLIBRAte project is to establish a state-of-the-art versatile Risk Governance framework for assessment and management of human and environmental risks of MN and MN-enabled products. The framework will be a web-based “system-of-systems” linking different models and methods for: 1) screening of apparent and perceived risks and trends in nanotechnology, 2) control banding, quali ...
Read Project

 26

 FINISHED 
A significant challenge to ensuring sustainable production and use of nanotechnologies is to understand safety and health risks of the technology and its end-products, and to implement practical strategies to manage these risks. Knowledge is growing rapidly, but effective use of this knowledge for risk management is lagging behind. We therefore need to bridge the gap between knowledge on hazard an ...
Read Project

 17

 FINISHED 
The GEMex project is a complementary effort of a European consortium with a corresponding consortium from Mexico, who submitted an equivalent proposal for cooperation. The joint effort is based on three pillars: 1 – Resource assessment at two unconventional geothermal sites, for EGS development at Acoculco and for a super-hot resource near Los Humeros. This part will focus on understanding the tec ...
Read Project

 26

 FINISHED 

Interfaces in opto-electronic thin film multilayer devices (INFORM)

Start date: Sep 1, 2015, End date: Aug 31, 2019,

Development of new materials over the past decade paved the way for organic/hybrid electronics into commercial applications. Now, perfection of material interfaces in organic/hybrid thin-film devices is key to drive the technology further and enable new, more advanced applications. INFORM offers a paradigm shift from focusing on materials to focusing on devices by probing, modelling and controllin ...
Read Project

 11

 FINISHED 

Nanomaterial FAte and Speciation in the Environment (NanoFASE)

Start date: Sep 1, 2015, End date: Aug 31, 2019,

Concept: NanoFASE will deliver an integrated Exposure Assessment Framework, including methods, parameter values, model and guidance that will allow Industry to assess the full diversity of industrial nano-enabled products to a standard acceptable in regulatory registrations. Methods to assess how use phases, waste streams and environmental compartments (air, soil, water biota) act as “reactors” in ...
Read Project

 39

 FINISHED 
Within the project SURE (Novel Productivity Enhancement Concept for a Sustainable Utilization of a Geothermal Resource) the radial water jet drilling (RJD) technology will be investigated and tested as a method to increase inflow into insufficiently producing geothermal wells. Radial water jet drilling uses the power of a focused jet of fluids, applied to a rock through a coil inserted in an exist ...
Read Project

 11

 FINISHED 

Industrial scenarios for connected factories (ConnectedFactories)

Start date: Sep 1, 2016, End date: Aug 31, 2019,

There is a consensus among industry and policymakers that Europe is currently in the middle of an industrial revolution initiated by the digitisation of industrial processes. Cyber Physical Systems (CPS), the Industrial Internet and the Internet of Things (IoT) connect people, devices, machines and enterprises like never before. For many years companies and research organisations have been address ...
Read Project

 16

 FINISHED 
The main objective of POWER2DM is to develop and validate a personalized self-management support system (SMSS) for T1 and T2 diabetes patients that combines and integrates (1) a decision support system (DSS) based on leading European predictive personalized models for diabetes interlinked with predictive computer models, (2) automated e-coaching functionalities based on Behavioural Change Theories ...
Read Project

 8

 FINISHED 
The overall objective of BRESAER project is to design, develop and demonstrate an innovative, cost-effective, adaptable and industrialized envelope system for buildings refurbishment including combined active and passive pre-fabricated solutions integrated in a versatile lightweight structural mesh:‒ Dynamic window with automatic and controlled air-tightness and insulated solar blinds complementin ...
Read Project

 17

 FINISHED 

Joining Efforts for Responsible Research and Innovation (JERRI)

Start date: Jun 1, 2016, End date: May 31, 2019,

...s, for a further upscaling among the RTOs in the EU28. A Responsible Research and Innovation (RRI) Plan will be developed and implemented at the biggest European RTOs, the Fraunhofer-Gesellschaft and TNO, covering the five RRI key dimensions (societal engagement, gender equality and gender in research and innovation con-tent, open access, science education and ethics). After identifying the state- ...
Read Project

 5

 FINISHED 
ENABLE-S3 will pave the way for accelerated application of highly automated and autonomous systems in the mobility domains automotive, aerospace, rail and maritime as well as in the health care domain. Virtual testing, verification and coverage-oriented test selection methods will enable validation with reasonable efforts. The resulting validation framework will ensure Europeans Industry competiti ...
Read Project

 76