Search for European Projects

Over 40 European Projects Found

Searched on 125080 European Projects

 FINISHED 

Virus free Fruit Nurseries (VirFree)

Start date: Jan 1, 2017, End date: Dec 31, 2020,

Fruit trees and grapevine are propagated vegetatively and are often grafted. As a result they suffer from a high number of pathogens such as viruses and viroids, a number of which are causing severe yield losses and reduce the productive life of the affected plants. As these pathogens cannot be controlled by the application of chemicals, the most efficient way to combat them is the production and ...
Read Project

 15

 FINISHED 
...hird, by uniting aquatic mesocosm science in an open network beyond the core consortium, with industry involved in an ambitious innovation process, to promote ground-breaking developments in mesocosm technology, instrumentation and data processing. A new dimension of experimental ecosystem science will be reached by coordinated mesocosm experiments along transects from the Mediterranean to the Arc ...
Read Project

 23

 FINISHED 

Hybrid Optomechanical Technologies (HOT)

Start date: Jan 1, 2017, End date: Dec 31, 2020,

... applications in the existing application domains of medical (e.g. MRI imaging), security (e.g. Radar and THz monitoring), positioning, timing and navigations (Oscillators) and for future quantum technology. The research aims at specific technological application, with realistic operating conditions and seeks to develop actual system demonstrators. In addition, it will explore how these hybrid tra ...
Read Project

 17

 FINISHED 
An increasing number of nanomaterials (NMs) are entering the market in every day products spanning from health care and leisure to electronics, cosmetics and foodstuff. Nanotechnology is a truly enabling technology, with unlimited potential for innovation. However, the novelty in properties and forms of NMs makes the development of a well-founded and robust legislative framework to ensure safe dev ...
Read Project

 27

 FINISHED 
...ailable, from European and international research projects and observing programmes. SeaDataCloud aims at considerably advancing SeaDataNet services and increasing their usage, adopting cloud and HPC technology for better performance. More users will be engaged and for longer sessions by including advanced services in a Virtual Research Environment. Researchers will be empowered with a collection ...
Read Project

 57

 FINISHED 
Based on a detailed mapping of urban challenges and relevant nature-based solutions (NBS), Nature4Cities aims at developing complementary and interactive modules to engage urban stakeholders in a collective-learning process about re-naturing cities, develop and circulate new business, financial and governance models for NBS projects, as well as provide tools for the impacts assessment, valorisatio ...
Read Project

 26

 FINISHED 
ACTIVAGE is a European Multi Centric Large Scale Pilot on Smart Living Environments. The main objective is to build the first European IoT ecosystem across 9 Deployment Sites (DS) in seven European countries, reusing and scaling up underlying open and proprietary IoT platforms, technologies and standards, and integrating new interfaces needed to provide interoperability across these heterogeneous ...
Read Project

 50

 FINISHED 
... and very recently the International Climate Change hold 2015 in Paris. Key European Commission roadmaps towards 2030 and 2050 have identified Carbon Capture and Storage (CCS) as a central low-carbon technology to achieve the EU’s 2050 Greenhouse Gas (GHG) emission reduction objectives, although there still remains a great deal to be done in terms of embedding CCS in future policy frameworks. The ...
Read Project

 10

 FINISHED 

Sustainable CellulAr networks harVEstiNG ambient Energy (SCAVENGE)

Start date: Feb 1, 2016, End date: Jan 31, 2020,

...ntegration with the smart electrical grid. The consortium is composed of world-class research centres and companies that are in the forefront of mobile communication and renewable energy research and technology development. The attitude of the industrial partners towards the strong investment in R&D and their strategic vision are fully aligned with the mission of this project, making them perfectl ...
Read Project

 9

 FINISHED 

European Gram Negative Antibacterial Engine (ENABLE)

Start date: Feb 1, 2014, End date: Jan 31, 2020,

The intensive use and misuse of antibiotics has resulted in some level of antibiotic resistance in essentially all human bacterial pathogens. There is a growing concern that the loss of therapeutic options will present us with a post-antibiotic era where present and future medical advances are negated. Resistant bacteria dramatically reduce the possibilities of treating infections effectively, a ...
Read Project

 42

 FINISHED 
The objective of the AENEAS project is to develop a concept and design for a distributed, federated European Science Data Centre (ESDC) to support the astronomical community in achieving the scientific goals of the Square Kilometre Array (SKA). The scientific potential of the SKA radio telescope is unprecedented and represents one of the highest priorities for the international scientific communit ...
Read Project

 31

 FINISHED 
...ures, and a unique multidisciplinary approach that enhances cross-fertilisation of ideas between academia and industry. We transform successful national structures and mechanisms used by Research and Technology Organisations (RTOs) in Denmark, Germany, Spain and the UK; merging them into a Europe-wide, composite, technology transfer system. Together we will test and improve a four-stage process to ...
Read Project

 4

 FINISHED 

Particle Reduced, Efficient Gasoline Engines (PaREGEn)

Start date: Oct 1, 2016, End date: Sep 30, 2019,

PaREGEn addresses the short term scope of the GV-02 call via research into and the innovation of gasoline engines for light duty vehicles. Specifically, engines used in mid to premium passenger cars will be addressed. With the electrification smaller vehicles, focusing on larger cars is especially important: the need for clean, efficient & economic engines for inter-urban transport is more urgent ...
Read Project

 16

 FINISHED 
The social and economic challenges of ageing populations and chronic disease can only be met by translation of biomedical discoveries to new, innovative and cost effective treatments. The ESFRI Biological and Medical Research Infrastructures (BMS RI) underpin every step in this process; effectively joining scientific capabilities and shared services will transform the understanding of biological m ...
Read Project

 39

 FINISHED 

Industrial scenarios for connected factories (ConnectedFactories)

Start date: Sep 1, 2016, End date: Aug 31, 2019,

...ire detailed work with companies and other stakeholders through a series of workshops at national and regional level, in order to reach a necessary industrial consensus on aspects such as: innovative technology proposals, business models, aspects, standardization etc… while considering the establishment of industrial eco-systems where multi-sided IT platforms create value.This work will enhance t ...
Read Project

 16

 FINISHED 
Terrestrial and marine ecosystems provide essential services to human societies. Anthropogenic pressures, however, cause serious threat to ecosystems, leading to habitat degradation, increased risk of collapse and loss of ecosystem services. Knowledge-based conservation, management and restoration policies are needed to improve ecosystem benefits in face of increasing pressures. ECOPOTENTIAL makes ...
Read Project

 47

 FINISHED 
Money underpins all terrorist activities (without money propaganda, training, recruitment, and support are less effective or null). The disruption of terrorist financing activity is a key element in any fight against terrorism.DANTE will deliver effective, efficient and automated data mining, analytics solutions and an integrated system to detect, retrieve, and analyse huge amounts of heterogeneou ...
Read Project

 18

 FINISHED 

Energy Efficient Optimised District Heating and Cooling (E2District)

Start date: Feb 1, 2016, End date: Jan 31, 2019,

Intelligent Energy Europe expects district heating to double its share of the European heat market by 2020 while district cooling will grow to 25%. While this expansion will translate into 2.6% reduction in the European primary energy need and 9.3% of all carbon emissions, it will not be achieved through modernization and expansion alone but requires fundamental technological innovation to make th ...
Read Project

 5

 FINISHED 

The European Open Science Cloud for Research Pilot Project. (EOSCpilot)

Start date: Jan 1, 2017, End date: Dec 31, 2018,

The EOSCpilot project will support the first phase in the development of the European Open Science Cloud (EOSC) as described in the EC Communication on European Cloud Initiatives [2016]. • It will establish the governance framework for the EOSC and contribute to the development of European open science policy and best practice; • It will develop a number of pilots that integrate service ...
Read Project

 39

 FINISHED 

Transnational Cooperation among ICT NCPs (Idealist2018)

Start date: Jan 1, 2015, End date: Dec 31, 2018,

The main objective of Idealist2018 is reinforcing the network of National Contact Points (NCP) for LEIT ICT under Horizon2020, by promoting further trans-national cooperation within this network. This cooperation will also include collaboration and networking with similar networks in parallel themes (Security, ENV, Transport, Energy, Health,…etc) especially in the context of joint/coordinated or P ...
Read Project

 33

 FINISHED 

Ensuring the Integrity of the European food chain (FOODINTEGRITY)

Start date: Jan 1, 2014, End date: Dec 31, 2018,

...ations that try to exploit that added value. The FOODINTEGRITY project will directly address this issue and will be an international focal point for harmonisation and exploitation of research and technology for insuring the integrity of European food. Comprising an inner core of project participants from industry, academia, research institutes, technology providers and a global network of stakehol ...
Read Project

 64

 FINISHED 

Synchro-modal Supply Chain Eco-Net (SYNCHRO-NET)

Start date: May 1, 2015, End date: Oct 31, 2018,

SYNCHRO-NET will demonstrate how a powerful and innovative SYNCHRO-modal supply chain eco-NET can catalyse the uptake of the slow steaming concept and synchro-modality, guaranteeing cost-effective robust solutions that de-stress the supply chain to reduce emissions and costs for logistics operations while simultaneously increasing reliability and service levels for logistics users.The core of the ...
Read Project

 19

 FINISHED 
DRIVER starts from the experience that neither successful R&D nor strong end-user demand always lead to innovation in the Crisis Management (CM) domain. This is a problem since as societies become more complex, increasing scope and unpredictability of potential crises and faster dynamics of major incidents put increasingly stringent demands on CM. European CM capabilities already constitute a matu ...
Read Project

 38

 FINISHED 
...tive teaching methods and in particular through projects that foster interdisciplinary approaches and the integration of teaching basic skills such as math, science and literacies by using innovative technology enhanced environments. The COMMIX project brings together 8 partners from 7 EU countries, who believe that collaboration on using interactive comics in education can have a positive impact, ...
Read Project

 8

 FINISHED 

European Exascale Processor Memory Node Design (ExaNoDe)

Start date: Oct 1, 2015, End date: Sep 30, 2018,

ExaNoDe will investigate, develop and pilot (technology readiness level 7) a highly efficient, highly integrated, multi-way, high-performance, heterogeneous compute element aimed towards exascale computing and demonstrated using hardware-emulated interconnect. It will build on multiple European initiatives for scalable computing, utilizing low-power processors and advanced nanotechnologies. ExaNoD ...
Read Project

 13

 FINISHED 

Jobs for Work 4.0 – The Future of Employment

Start date: Sep 1, 2016, End date: Aug 31, 2018,

Digitization is increasingly shaping the world of work. Algorithms for big data are now rapidly entering domains reliant upon pattern recognition and can readily substitute for labour in a wide range of non-routine cognitive tasks. Advanced robots are gaining enhanced senses and dexterity, allowing them to perform a broader scope of manual tasks. This is likely to change the nature of work across ...
Read Project

 7

 FINISHED 

Digital Tools for Inclusion of Refugees, Asylum Seekers and Migrants

Start date: Sep 1, 2016, End date: Aug 31, 2018,

More than a million migrants and refugees crossed into Europe in 2015, compared with just 280,000 the year before. The scale of the crisis continues, with more than 135,000 people arriving in the first two months of 2016.In order to respond effectively to the current refugee crisis, EU policies are constantly changing. Newly arrived migrants along with their families demonstrate a series of compli ...
Read Project

 8

 FINISHED 

Generativity: manage it

Start date: Sep 1, 2016, End date: Aug 31, 2018,

The title "Generativity: manage it!" focus on a specific methodological reference: generativity describes a self-contained system from which its user draws an independent ability to create, generate, implement or produce new content unique to that system without additional help or input from the system's original creators. The term was coined in 1950 by Erik Erikson to denote a concern for establi ...
Read Project

 9

 FINISHED 

Beyond Retirement - A Migrant Integration Resource

Start date: Sep 1, 2016, End date: Aug 31, 2018,

The BRAMIR Project proposes the development and implementation of a multi-layered andragogic framework designed for a seniors target group comprising older workers approaching retirement and recent retirees. This framework will incorporate a bespoke train-the-trainer curriculum, a suite of psychographic profiling tools and a digital toolbox of appropriate teaching resources to enable the redeploym ...
Read Project

 9

 FINISHED 
One of the greatest challenges facing regulators in the ever changing landscape of novel nano-materials is how to design and implement a regulatory process which is robust enough to deal with a rapidly diversifying system of manufactured nanomaterials (MNM) over time. Not only does the complexity of the MNM present a problem for regulators, the validity of data decreases with time, so that the wel ...
Read Project

 46

 FINISHED 

Helix Nebula – The Science Cloud (HNSciCloud)

Start date: Jan 1, 2016, End date: Jun 30, 2018,

Over the coming 10-15 years the generation of vast amounts of data created by scientific research domains will create enormous challenges for capturing, managing and processing of this data. Tests have been made but today commercial cloud services do not play a significant role in the production computing environments for the publicly funded research sector in Europe. Stimulated by the Pre-Commer ...
Read Project

 11

 FINISHED 
NOBEL GRID will develop, deploy and evaluate advanced tools and ICT services for energy DSOs cooperatives and medium-size retailers, enabling active consumers involvement –i.e. new demand response schemas – and flexibility of the market – i.e. new business models for aggregators and ESCOs.Through the dual-use of telecommunication networks, and validating the integration of renewable generation pre ...
Read Project

 24

 FINISHED 

ONLINE Platform for Smart Specialisation Policy Advice (ONLINE-S3)

Start date: May 1, 2016, End date: Apr 30, 2018,

This project aims to develop an e-policy platform augmented with a toolbox of applications and online services, which will assist national and regional authorities in the EU in elaborating or revising their smart specialisation agenda, in terms of policies and strategy. The platform will leverage existing methodologies, initiatives and tools developed by the EC for the RIS3 strategy, but it will a ...
Read Project

 12

 FINISHED 

Graphene-based disruptive technologies (GrapheneCore1)

Start date: Apr 1, 2016, End date: Mar 31, 2018,

...raphene Flagship is to take graphene and related layered materials from a state of raw potential to a point where they can revolutionise multiple industries. This will bring a new dimension to future technology – a faster, thinner, stronger, flexible, and broadband revolution. Our program will put Europe firmly at the heart of the process, with a manifold return on the EU investment, both in terms ...
Read Project

 158

 FINISHED 

EUDAT2020

Start date: Mar 1, 2015, End date: Feb 28, 2018,

EUDAT2020 brings together a unique consortium of e-infrastructure providers, research infrastructure operators, and researchers from a wide range of scientific disciplines under several of the ESFRI themes, working together to address the new data challenge. In most research communities, there is a growing awareness that the “rising tide of data” will require new approaches to data management and ...
Read Project

 36

 FINISHED 

Research Data Alliance - Europe 3 (RDA Europe)

Start date: Sep 1, 2015, End date: Feb 28, 2018,

The Research Data Alliance (RDA) is rapidly building the social and technical bridges that enable open sharing and re-use of data on a global level. RDA/Europe - the European plug-in to the global Research Data Alliance activities – will ensure that European research, industrial, e-infrastructure and policy stakeholders are all aware of its achievements, engaged with and actively involved in the g ...
Read Project

 12

 FINISHED 

Transfer-print operations for heterogeneous integration (TOP HIT)

Start date: Feb 2, 2015, End date: Feb 1, 2018,

...t components of different functionality to be manipulated in a highly flexible and programmable way making best use of the materials. The TOP HIT project will aggressively develop and validate the TP technology by integrating electronics and photonics components for the magnetic and communication industries. These serve as examples for the broad capability of the technology which is compatible wit ...
Read Project

 8

 FINISHED 
EU CISE 2020 is an important step towards the accomplishment of the European roadmap for CISE; the project attains the widest possible experimental environment of innovative and collaborative processes between European maritime institutions.EU CISE 2020 takes as reference a broad spectrum of factors in the field of European Integrated Maritime Surveillance, arising from the European legal framewor ...
Read Project

 38

 FINISHED 

Quality Assurance for Essential Climate Variables (QA4ECV)

Start date: Sep 27, 2013, End date: Jan 1, 2018,

Policy makers are increasingly relying on Earth Observation (EO) data to make decisions on mitigating and adapting to climate change. These decisions need to be 'evidence-based' and this requires complete confidence in EO-derived products. Although EO data is plentiful, it is rare to have reliable, traceable and understandable quality information. The situation is often further confused because va ...
Read Project

 19

 FINISHED 
Europe has invoked the SET-Plan to design and implement an energy technology policy for Europe to accelerate the development and deployment of cost-effective renewable energy systems, including photovoltaics. With lower cost of solar electricity, PV could significantly contribute to the achievements of the 20-20-20 objectives.The Joint Program on PV of the European Energy Research Alliance (EERA-P ...
Read Project

 37