Search for European Projects

10 European Projects Found

Searched on 125080 European Projects

 FINISHED 
Over recent years, Industrial and Automation Control Systems (IACS) adopted in Critical Infrastructures (CIs) have become more complex due to the increasing number of interconnected devices, and to the large amount of information exchanged among system components. With the emergence of such an “Internet of Things” generation of IACS, the boundaries to be protected have grown well beyond that of th ...
Read Project

 13

 FINISHED 

Secure Big Data Processing in Untrusted Clouds (SecureCloud)

Start date: Jan 1, 2016, End date: Dec 31, 2018,

SecureCloud addresses the confidentiality, integrity and availability of applications executed in the cloud. Data at rest or in transit on the network is already nowadays protected by encryption. The main problem that we face is how to ensure the confidentiality of data while being processed. Our approach is based on upcoming hardware extensions of commodity CPUs like Intel's Secure Guard Extensio ...
Read Project

 8

 FINISHED 
...UST aims at conducting CO2 injection experiments at scales large enough so that the output can be extrapolated at industrial scales. It relies on four sites: the heavily instrumented sites of Heletz (Israel, main site) and Hontomin (Spain), access Miranga (Brazil) and the emerging site in the Baltic Sea region. The objectives are to: carry out CO2 injection with different strategies, displaying ch ...
Read Project

 18

 FINISHED 

PREVENTIVE METHODOLOGY AND TOOLS TO PROTECT UTILITIES (PREEMPTIVE)

Start date: Mar 1, 2014, End date: Feb 28, 2017,

In recent years, we have witnessed an increase in the number and impact of cyber attacks. A successful attack might affect, or even endanger, daily human activities. Multiple countermeasures have been put in place to prevent Advanced Persistent Threat (APT) attacks, but they failed, allowing the latest generation of APT. The goal of PREEMPTIVE is to provide an innovative solution for enhancing exi ...
Read Project

 12

 FINISHED 

Situation AWare Security Operations Center (SAWSOC)

Start date: Nov 1, 2013, End date: Apr 30, 2016,

SAWSOC aims at bringing a significant advancement in the convergence of physical and logical security, meaning effective cooperation (i.e. a coordinated and results-oriented effort to work together) among previously disjointed functions. Recently some achievements have been made (e.g. SEM and SIM have merged into SIEM, and LACS and PACS have merged into IM), Security Operations Center (SOC) techno ...
Read Project

 13

 FINISHED 
...el, the system is complemented with a smart software layer for field equipment and a detection system for the TLC network. The system will be validated on real equipment and scenarios provided by Israel Electric Corp.
Read Project

 14

 FINISHED 

Capture of evaporated water with novel membranes (CapWa)

Start date: Sep 1, 2010, End date: Aug 31, 2013,

One of the major challenges of this century is the provision of safe drinking water for a growing population. The shortage in water resources in arid areas requires the availability of more efficient and cheaper drinking water production processes. For groundwater, it is often sufficient to aerate and disinfect to produce drinking water. However, in large parts of the world the use of groundwater ...
Read Project

 15

 FINISHED 
Today, there are largely no communications infrastructure deployments in European medium and low voltage power distribution networks. Powerline communications has a large potential to enable new and intelligent applications to and from the last branch of the distribution grid. However, current powerline communication technologies cannot offer the reliability, quality of service and interoperabilit ...
Read Project

 14

 FINISHED 
The main goal of the ENERsip project is to create an adaptive, customizable, and service-oriented ENERgy monitoring and control system for energy grids and decision makers. ENERsip is conceived on the idea that mixing energy, communications, control, computing and construction for the consumption and generation elements, must be active and proactively coordinated. To bring the idea into reality, E ...
Read Project

 11

 FINISHED 
...mutation network able to assure availability, authenticity, integrity, of metadata exchanged5.\tValidation of the interdependency alarm -predictor system on the infrastructure of an Electric Company, Israel Electric Corp, partner.
Read Project

 12