Search for European Projects

11 European Projects Found

Searched on 125080 European Projects

 FINISHED 
...tion, 3. Unique large range of thrust offer enormous flexibility, 4. Minimal complexity of concept providing an excellent basis for economic competitiveness.The HEMPT-NG consortium is led by TES (Thales Electronic System GmbH), subsidiary of the Thales Group, worldwide leader in the development and production of space products, responsible for thruster equipment and integrated EPS. European indust ...
Read Project

 10

 FINISHED 

Integrated 3D Sensors suite (I3DS)

Start date: Nov 1, 2016, End date: Jan 31, 2019,

The I3DS platform (Integrated 3D sensors) is a generic and modular system answering the needs of near-future space exploration missions in terms of exteroceptive and proprioceptive sensors with integrated pre-processing and data concentration functions. It consists in state-of-the art sensors and illumination devices integrated in a coherent architecture as inter-changeable building blocks and tar ...
Read Project

 10

 FINISHED 
Sample return missions (SRMs) are a critical next step in our exploration of the Solar System and are identified as strategic missions by international space agencies. Europe has a very strong legacy in the curation and research of precious extraterrestrial materials. To maintain European leadership and ensure high-level involvement in future SRMs, a dedicated European Sample Curation Facility (ES ...
Read Project

 14

 FINISHED 
Embedded systems are the key innovation driver to improve almost all mechatronic products with cheaper and even new functionalities. Furthermore, they strongly support today's information society as inter-system communication enabler.Consequently boundaries of application domains are alleviated and ad-hoc connections and interoperability play an increasing role. At the same time, multi-core and ma ...
Read Project

 101

 FINISHED 

Critical System Engineering Acceleration (CRYSTAL)

Start date: May 1, 2013, End date: Jul 31, 2016,

CRYSTAL aims at fostering Europe’s leading edge position in embedded systems engineering in particular regarding quality and cost effectiveness of safety-critical embedded systems and architecture platforms.Its overall goal is to enable sustainable paths to speed up the maturation, integration, and cross-sectoral reusability of technological and methodological bricks of the factories for safety-cr ...
Read Project

 70

 FINISHED 
This Project aims to support Rolls Royce in the design of a of high temperature flexible PCB and through trials of flexible laminates manufactured from existing and brand new advanced polymers progress the temperature at which a flexible printed circuit can operate from the current state of the art maximum of 200°C into the desired range of 260°C (minimum) up to 400°C (target).The Project also aim ...
Read Project

 5

 FINISHED 

FI-WARE: Future Internet Core Platform (FI-WARE)

Start date: May 1, 2011, End date: Dec 31, 2014,

The goal of the FI-WARE project is to advance the global competitiveness of the EU economy by introducing an innovative infrastructure for cost-effective creation and delivery of services, providing high QoS and security guarantees. FI-WARE is designed to meet the demands of key market stakeholders across many different sectors, e.g., healthcare, telecommunications, and environmental services. FI- ...
Read Project

 92

 FINISHED 

All Condition Operations and Innovative Cockpit Infrastructure (ALICIA)

Start date: Sep 1, 2009, End date: Aug 31, 2014,

"ALICIA addresses the ACARE objective of increasing time efficiency within the future air transport system. The aim will be to develop a new and scalable cockpit application which can extend operations of aircraft in degraded conditions – “All Conditions Operations”. A key objective will be to deliver an extensible application that can be applied to many aircraft types. This will necessarily enta ...
Read Project

 42

 FINISHED 
"The activity is focused on the design and development of a ""ready-to-market"" single chip GNSS mass marketreceiver for GPS, EGNOS and GALILEO signals.Based on the wide expertise of STM in building high performance, ultra low power consumption receivers for the mass market and on the large experience and involvement of the consortium partners in the different domains (mass market AGNSS leading ro ...
Read Project

 11

 FINISHED 

HIRF Synthetic Environment (HIRF SE)

Start date: Dec 1, 2008, End date: May 31, 2013,

"The HIRF SE research project has the goal of providing the aeronautics industry with a framework which can be used during the development phase to mitigate the EM aspects. In addition it will provide a considerable reduction in the certification/qualification tests required on air vehicle. The HIRF SE main objectives can be summarized by the two followings items: • Full validated and integrated s ...
Read Project

 45

 FINISHED 

New European WAtcher (NEWA)

Start date: Aug 1, 2010, End date: Mar 31, 2012,

"The NEWA project aims at addressing and fully characterizing limiting factors in EU which limit the access to required technology and capabilities, creating large dependence on critical technologies from outside Europe specifically in space techniques applications.This mainly originates from the large number of past and on-going efforts conducted in space-based and air-based surveillance systems ...
Read Project

 9