Search for European Projects

Over 40 European Projects Found

Searched on 125080 European Projects

 FINISHED 
The physical laws of diffraction generally limit the spatial resolution of optical systems, being about 200 nm for light in the visible range. Within ChipScope we want to overcome this limit by developing the scientific and technological basis for a completely new approach to optical superresolution, based on semiconductor nano Light Emitting Diode (nanoLED) arrays with individual pixel operation. ...
Read Project

 7

 FINISHED 
SARAH is concerned with establishing novel holistic, simulation-based approaches to the analysis of aircraft ditching. It is build up from a consortium of experts from OEM industries, experienced suppliers of simulation technologies, established research institutions and representatives of the certification authorities. Results of SARAH are expected to support a performance-based regulation and ce ...
Read Project

 12

 FINISHED 

Cognitive Interaction in Motion (CogIMon)

Start date: Feb 1, 2015, End date: Jan 31, 2019,

Compliant control in humans is exploited in a variety of sophisticated skills. These include solitary actions such as soft catching, sliding, pushing large objects as well as joint actions performed in teams such as mainpulation of large scale objects or mutual adaptation through phyiscal coupling for learning, in walking or in execution of joint tasks. We refer to this advanced ability of organiz ...
Read Project

 10

 FINISHED 
ReDSHIFT will address barriers to compliance for spacecraft manufacturers and operators presented now and in the future by requirements and technologies for de-orbiting and disposal of space objects. This will be achieved through a holistic approach that considers from the outset opposing and challenging constraints for the safety of the human population when these objects re-enter the atmosphere, ...
Read Project

 13

 FINISHED 
In BIOCASCADES, nine early-stage researchers (ESRs) will investigate the development of sustainable (chemo)enzymatic cascade reactions under the ‘green chemistry’ philosophy. The proposed BIOCASCADES project combines different techniques such as compartmentalization, protein engineering and reaction engineering in order to develop commercially viable and environmentally benign one pot reactions. B ...
Read Project

 12

 FINISHED 

Secure Enclaves for REactive Cloud Applications (SERECA)

Start date: Mar 1, 2015, End date: Feb 28, 2018,

Cloud security is of immediate concern to organisations that must comply with strict confidentiality and integrity policies. More broadly, security has emerged as a commercial imperative for cloud computing across a wide range of markets. The lack of adequate security guarantees is becoming the primary barrier to the broad adoption of cloud computing.The Secure Enclaves for REactive Cloud Applicat ...
Read Project

 9

 FINISHED 
"The objective is to deliver a trans-European network of industrially oriented specialists fully trained in the development and application of microbioreactor (MBR) technology to support development of innovative bio-based manufacturing processes. The specialistis will be trained by leaders in the field and with state of the art equipment and methodologies. MBRs are a promising tool for screening ...
Read Project

 13

 FINISHED 
In search for a more competitive, multiple types of aircrafts, IMA based, avionics platform solution, the European aerospace industry has recently initiated the IMA2G paradigm thanks to the EC funded SCARLETT project.This latter successfully validated a first underlying set of IMA2G concepts (Separate Core Processing resources from I/O resources, introduce resource segments typology of electronics ...
Read Project

 39

 FINISHED 
"Cell polarity and directed growth (tropism) are fundamental biological processes. Most fungi are dependent on these processes because they grow as polarised filaments called hyphae, whose growth and developmentare governed by physical and chemical cues from the environment. Such cues include surface-contact, light, nutrients, mating partners, host organisms, or ‘self’ hyphae from within the fung ...
Read Project

 13

 FINISHED 
Embedded systems are the key innovation driver to improve almost all mechatronic products with cheaper and even new functionalities. Furthermore, they strongly support today's information society as inter-system communication enabler.Consequently boundaries of application domains are alleviated and ad-hoc connections and interoperability play an increasing role. At the same time, multi-core and ma ...
Read Project

 101

 FINISHED 

Low Emissions Core-Engine Technologies (LEMCOTEC)

Start date: Oct 1, 2011, End date: Jun 30, 2017,

The main objective of the LEMCOTEC project will be the improvement of core-engine thermal efficiency by increasing the overall pressure ratio (OPR) to up to 70 leading to a further reduction of CO2. Since NOx increases with OPR, combustion technologies have to be further developed, at the same time, to at least compensate for this effect. The project will attain and exceed the ACARE targets for 20 ...
Read Project

 39

 FINISHED 
European manufacturing industry faces increasing product variances resulting as a consequence of frequent innovation, short product lifecycles, small series production, and shrinking production cycles. At the same time, production cost must be continuously reduced.Agile, transformable and re-usable automation and robotics is be a key enabler to manage those trends. However, few robotic components ...
Read Project

 34

 FINISHED 

MOBILISING THE POTENTIAL OF ACTIVE AGEING IN EUROPE (MOPACT)

Start date: Mar 1, 2013, End date: Feb 28, 2017,

The starting point for MOPACT is the ambitious goals set by Horizon 2020 and the European Innovation Partnership Pilot Project on Active and Healthy Ageing (EIPAHA). Our response is ambitious too: we aim to provide the research and practical evidence upon which Europe can make longevity an asset for social and economic development. MOPACT will create a high quality, multi-disciplinary critical mas ...
Read Project

 32

 FINISHED 

High Altitude Ice Crystals (HAIC)

Start date: Aug 1, 2012, End date: Jan 31, 2017,

Commercial aircraft have been experiencing in-service events while flying in the vicinity of deep convective clouds since at least the early 1990s. Heated probes and engines are the areas of air-craft most prone to mixed phase and glaciated icing threat. In anticipation of regulation changes regarding mixed phase and glaciated icing conditions, the HAIC project will provide the necessary Acceptabl ...
Read Project

 40

 FINISHED 
Even though composite materials are more and more used in modern airframes, many significant improvements are still achievable. Firstly, the substitution of the assembly of many small composite parts by a single one-shot large part provides additional weight reduction. Secondly, the final assembly line process must be adapted to composite properties (lack of ductility, stiffness). Thirdly, if the ...
Read Project

 60

 FINISHED 
The Affinomics programme aims to leverage existing efforts in Europe to generate large-scale resources of validated protein-binding molecules (‘binders’) as affinity reagents for characterisation of the human proteome and to apply them in comprehensive structural and functional analyses of protein expression, interactions and complexes. Proteome targets will be focused on five categories of inter- ...
Read Project

 20

 FINISHED 

Source of Electron Entanglement in Nano Devices (SE2ND)

Start date: Aug 1, 2011, End date: Jan 31, 2015,

SE2ND is a joint experimental and theoretical effort. SE2ND strives to develop a highly efficient and continuous solid-state source of spatially separated spin-entangled electrons. A source of this kind, integrated with other electronic elements, will be of great importance in future quantum processors, where they provide, for example, entanglement distribution required to synchronize quantum circ ...
Read Project

 10

 FINISHED 

Numerical simulation in technical sciences (NUMSIM)

Start date: Nov 1, 2010, End date: Oct 31, 2014,

"Computer simulation plays an increasing role in technical sciences and allows the detailed investigation of physical phenomena way beyond what can be achieved in the laboratory. It is used extensively in the industry for example for rapid prototyping or for reducing the risk in underground construction. The aim of the project is to bring together groups of scientists in Latin America and Europe t ...
Read Project

 5

 FINISHED 
According to the International Energy Agency, the Manufacturing sector is at worldwide level responsible for approximately 37% of primary energy consumption being, in most of the developed countries, it is the largest energy consumer and CO2 producer. In this new competitive scenario, European manufacturers have to rethink the current ideas of manufacturing and factories, to be prepared for the n ...
Read Project

 19

 FINISHED 
NAMDIATREAM will develop a cutting edge nanotechnology-based toolkit for multi-modal detection of biomarkers of most common cancer types and cancer metastases, permitting identification of cells indicative of early disease onset in a high-specificity and throughput format in clinical, laboratory and point-of-care devices. The project is built on the innovative concepts of super-sensitive and highl ...
Read Project

 24

 FINISHED 
"This proposal covers all actions from the university side required in the call JTI-CS-2010-1-SFWA-01-020 for the development and testing of two designs of an integration of active flow control concepts on a trailing edge of high lift devices, namely:• the design, including an optimization of the structure• the manufacturing of coupon specimens and a mock-up• the structural testing of the specimen ...
Read Project

 2

 FINISHED 

EM safety and Hazards Mitigation by proper EV design (EM-Safety)

Start date: May 1, 2011, End date: Apr 30, 2014,

The project aims at increasing the public confidence in the safety regarding electromagneticfields (EMF) in the fully electric vehicles (FEV).Public expectations to move towards the electrification of road transport are driven by a multitudeof factors and concerns including: climate change, primary energy dependence and public healthas well as cost and scarcity of raw materials. Road transport rem ...
Read Project

 11

 FINISHED 
"The overarching aim of the PARDEM project is to provide high quality training to a group of young researchers to work within and to further develop the multidisciplinary field of DEM computational simulation of granular processes. Granular materials are estimated to constitute over 75% of all raw material feedstock to industry. They also present many challenges for innovation and fundamental scie ...
Read Project

 12

 FINISHED 
Protecting critical infrastructures providing communications, energy, or healthcare presents increasing ICT challenges as ICT itself has become vital to them. Internet-scale ICT infrastructures ("infrastructure clouds") promise scalable virtualised computing, network, and storage resources over the Internet. They provide scalability and cost-efficiency but pose significant new privacy and resilien ...
Read Project

 16

 FINISHED 
There is a wide consensus among telecom vendors and operators that the next decade will see a mélange of evolving Internet architectures embedded into high-bandwidth technologies and carrier-grade systems for control and management. The combined Internet Protocol (IP) and Ethernet-based optical transport solutions are expected to drastically lower capital and operational expenses and improve overa ...
Read Project

 6

 FINISHED 
iNTeg-Risk is a large-scale integrating project aimed at improving the management of emerging risks in the innovative industry. This will be achieved by building a new risk management paradigm for emerging risks, which is a set of principles supported by a common language, commonly agreed tools & methods and Key Performance Indicators integrated into a single framework. As main impact, it will red ...
Read Project

 67

 FINISHED 

TEstbed for Future Internet Services (TEFIS)

Start date: Jun 1, 2010, End date: Feb 28, 2013,

The flourishing of user driven demand, the heterogeneity of networks, the multiplicity of new devices, all mean that the Internet as we know it is reaching a saturation point. One of the main challenges of Future Internet research is to address the surge in complexity that service and network developers are facing.Building on top of the on-going actions to support large-scale experimentation for F ...
Read Project

 19

 FINISHED 

Re-road – End of life strategies of asphalt pavements (Re-road)

Start date: Jan 1, 2009, End date: Dec 31, 2012,

The majority of the European roads are paved with asphalt material. The dismantling and end of life strategies for these pavements are very divergent among the EU member states and the associated countries. In general the share of recycling the reclaimed asphalt in new asphalt courses is rather lower than it could be technically. The Re-road project aims to address these problems with a holistic ...
Read Project

 14

 FINISHED 
Solid state light sources based on compound semiconductors are opening a new era in general lighting and will contribute significantly to a sustainable energy saving. For a successful and broad penetration of LEDs into the general lighting market two key factors are required: high efficiency and low cost. Two new disruptive technologies based on nanostructured semiconductors are proposed to addres ...
Read Project

 14

 FINISHED 
The Coordination Action WakeNet3-Europe will promote multidisciplinary exchange between research and operational specialists in the field of wake vortex turbulence. It will enable to develop a shared view on how to address capacity-related issues caused by wake turbulence. It continues the Thematic Networks WakeNet and WakeNet2-Europe. Safe separations prescribed to avoid potential hazards by enco ...
Read Project

 13

 FINISHED 

Built Environment Sustainability and Technology in Energy (BEST Energy)

Start date: Feb 1, 2009, End date: Apr 30, 2012,

The main objective of this project is to improve the energy efficiency in public buildings and street public lighting, by the ICT-based centralized monitoring and management of the energy consumption and production, and to provide decision makers with the necessary tools to be able to plan energy saving measures.To achieve this objective BEST Energy project will implement and validate four pilots, ...
Read Project

 13

 FINISHED 

Integrated European Industrial Risk Reduction System (IRIS)

Start date: Oct 1, 2008, End date: Mar 31, 2012,

Current practices in risk assessment and management for industrial systems are characterized by its methodical diversity and fragmented approaches. In retrospect these risk and safety paradigms resulted from diverse industries driven and limited by available knowledge and technologies. A change based on industry driven R&D work is needed. At present the European Industry recognised their obligatio ...
Read Project

 37

 FINISHED 

ArtistDesign – Design for Embedded Systems (ArtistDesign)

Start date: Jan 1, 2008, End date: Mar 31, 2012,

The ArtistDesign NoE is the visible result of the ongoing integration of a community, that emerged through the Artist FP5 Accompanying Measure and that was organised through the Artist2 FP6 NoE.The central objective for ArtistDesign is to build on existing structures and links forged in Artist2, to become a virtual Center of Excellence in Embedded Systems Design. This will be mainly achieved throu ...
Read Project

 38

 FINISHED 
High specificity affinity reagents (‘binders’) are essential probes for proteome research, enabling the detection and localisation of multiple proteins in tissues and fluids in health and disease, through the application of binder-based technologies (affinity proteomics). This proposal links the high throughput production of quality-controlled, recombinant binding molecules of different types (ant ...
Read Project

 10

 FINISHED 

Hydropower converters with very low head differences (HYLOW)

Start date: Mar 1, 2008, End date: Feb 29, 2012,

"Small hydropower with very low head or pressure differences below 2.5 m and hydraulic power ratings of 50 to 1000 kW is a significant renewable resource, with an estimated unused potential in rivers alone of e.g. 600 to 1000 MW in the UK and more than 500 MW in Germany. The economically and ecologically efficient utilisation of this hydropower bracket still constitutes an unsolved problem since c ...
Read Project

 11

 FINISHED 

Performance Control in Wireless Sensor Networks (GINSENG)

Start date: Sep 1, 2008, End date: Feb 29, 2012,

Research on wireless sensor networks (WSNs) is at an early stage and, to date, practical experience with deployment has been very limited. The focus of past research has been on fundamental design issues, especially on optimizing the use of scarce energy resources in battery-powered devices. Published studies show relative comparisons between alternative approaches, but there has been a dearth of ...
Read Project

 10

 FINISHED 

Correlated Noise Errors in Quantum Information Processing (CORNER)

Start date: Jul 1, 2008, End date: Jan 31, 2012,

Any form of manipulation of quantum information (QI), be it storage or transfer, may be represented as a quantum channel, i.e. a map transforming the input state of the sender into the receiver's output state. Given the extreme sensitivity of QI to noise, it is crucial to study the impact of incoherent effects on QI processing and communication if technological applications are to become a reality ...
Read Project

 13

 FINISHED 
"The DIREC_MAT project objective is to share, at a European scale, knowledge and practices on recycling road and road-related waste in the aim of ensuring an environmentally-friendly and sustainable end-of-life for road infrastructure. Road material recycling processes have previously been studied in national and European research projects and have led to various levels of practical implementation ...
Read Project

 20

 FINISHED 

Cooperative Hybrid Objects in SEnsor Networks (CHOSEN)

Start date: Jun 1, 2008, End date: Nov 30, 2011,

CHOSeN will develop appropriate technology, including advanced configurable RF and digital baseband transceiver hardware, networking protocols with scalable Quality of Service in respect of transmission speed, robustness, security, and low-power support, and a generic collaboration middleware that abstracts from the diversity and heterogeneity provided by the layers below, and it will thereby impr ...
Read Project

 11

 FINISHED 

Gigascale Oriented Solid State flAsh Memory for EuRope (GOSSAMER)

Start date: Jan 1, 2008, End date: Jun 30, 2011,

Description GOSSAMER successfully developed a fully integrated Flash NAND technology based on the TANOS concept, investigating a large number of architecture and material options. The project aimed at the development of the technology for very high density Non Volatile Memories for mass storage ap ...
Read Project

 21