Search for European Projects

Over 40 European Projects Found

Searched on 125080 European Projects

 FINISHED 
Embedded systems are the key innovation driver to improve almost all mechatronic products with cheaper and even new functionalities. Furthermore, they strongly support today's information society as inter-system communication enabler.Consequently boundaries of application domains are alleviated and ad-hoc connections and interoperability play an increasing role. At the same time, multi-core and ma ...
Read Project

 101

 FINISHED 

Dependable Embedded Wireless Infrastructure (DEWI)

Start date: Mar 1, 2014, End date: Feb 28, 2017,

DEWI (dependable embedded wireless infrastructure) envisions to significantly foster Europe’s leading position in embedded wireless systems and smart (mobile) environments such as vehicles, railway cars, airplanes and buildings. These environments comprise wireless sensor networks and wireless applications for citizens and professional users. Therefore the consortium introduces the concept of a “s ...
Read Project

 61

 FINISHED 

Arrowhead (ARROWHEAD)

Start date: Mar 1, 2013, End date: Feb 28, 2017,

"Our society is facing both energy and competitiveness challenges. These challenges are tightly linked and require new dynamic interactions between energy producers and energy consumers, between machines, between systems, between people and systems, etc. Cooperative automation is the key for these dynamic interactions and is enabled by the technology developed around the Internet of Things and Ser ...
Read Project

 87

 FINISHED 
While most of programmable network gear vendors support OpenFlow nowadays, a number of fragmented control plane solutions exist for proprietary software-defined networks. Thus, network applications developers need to re-code their solutions every time they target a network infrastructure based on a different controller. Moreover, different network developers adopt different solutions as abstract c ...
Read Project

 10

 FINISHED 

Harnessing Performance Variability (HARPA)

Start date: Sep 1, 2013, End date: Nov 30, 2016,

Application requirements, power, and technological constraints are driving the architectural convergence of future processors towards heterogeneous many-cores. This development is confronted with variability challenges, mainly the susceptibility to time-dependent variations in silicon devices. Increasing guard-bands to battle variations is not scalable, due to the too large worst-case cost impact ...
Read Project

 8

 FINISHED 
Current communication standards and systems are not optimally prepared for their application in unpredictable environments which occur for example in serious disaster scenarios such as earthquakes or tsunamis. Cellular communications systems are planned using accurate/strict link budget allocation mechanisms, in order to keep the probability of outage in an acceptable range. The whole communicatio ...
Read Project

 10

 FINISHED 

Future Internet - Core (FI-Core)

Start date: Sep 1, 2014, End date: Sep 30, 2016,

FI-WARE has started to materialize as a powerful foundation for the Future Internet. FI-WARE is an innovative, open cloud-based infrastructure for cost-effective creation and delivery of services, at a scale not seen before. FI-WARE is now well under way to successfully achieve its goals of boosting the effectiveness of creating new services of high economic and societal value, reinforcing EU comp ...
Read Project

 33

 FINISHED 

COgnitive & Perceptive CAMeraS (COPCAMS)

Start date: Apr 1, 2013, End date: Sep 30, 2016,

Vision systems are becoming ubiquitous in our daily lives. Complex analysis of images from multiple cameras will become the norm in the future, from cars to industrial systems, from smart cities to facility monitoring, aimed at extracting meaningful, context-dependent information.Today’s market is dominated by a combination of relatively simple, fixed function, configurable cameras that stream vid ...
Read Project

 25

 FINISHED 
Emerging embedded systems platforms harnessing new heterogeneous, multicore architectures to enable the next generation of powerful mission-critical applications are demanding across-the-board advances in all areas of design and development to fulfil their promise. The integration of component-based design with model-driven development creates a potent combination especially capable of mastering t ...
Read Project

 16

 FINISHED 
Cyber-physical networks based on embedded systems are part of our society and gain spread and importance. Next generations of aircrafts and cars will be tightly interconnected with each other, with the Internet and other infrastructures. The same holds for many industries and areas of our life. Ubiquitous, highly critical systems go online and create a domain of mixed criticalities, where security ...
Read Project

 15

 FINISHED 
Organized crime is becoming more diverse in its activities and methods including “greater levels of collaboration between criminal groups, greater mobility in and around the EU, a diversification of illicit activity, and a growing dependence on a dynamic infrastructure, anchored in key locations and facilitated by widespread use of the Internet” (the Director of Europol, in his foreword to the OCT ...
Read Project

 19

 FINISHED 

Authentication and Authorisation for Entrusted Unions (AU2EU)

Start date: Dec 1, 2013, End date: Nov 30, 2015,

The aim of the AU2EU project is to implement and demonstrate in a real-life environment an integrated eAuthentication and eAuthorization framework to enable trusted collaborations and delivery of services across different organizational/governmental jurisdictions. Consequently, the project aims at fostering the adoption of security and privacy-by-design technologies in European and global markets. ...
Read Project

 13

 FINISHED 

Achieving The Trust Paradigm Shift (ATTPS)

Start date: Jul 1, 2012, End date: Oct 31, 2015,

Trust is an essential prerequisite for connecting people in effective transactions. It builds into the society on elements like security, privacy, transparency, accountability and reputation. European strategy must aim at a strong competitive position in producing trustworthy ICT that bring new attractive ways of living and working that are perceived as trustworthy.The Trust in Digital Life (TDL) ...
Read Project

 12

 FINISHED 

OPerational Trustworthiness Enabling Technologies (OPTET)

Start date: Nov 1, 2012, End date: Oct 31, 2015,

The OPTET project plans through a multi-disciplinary and integrated approach to identify and address the drivers of trust and confidence also fight against its erosion (especially true on the Internet or Cloud). Focus of this project is on socio-technical systems connected to the Internet. The resulting technologies enabling trustworthiness would be verified on two distinct existing execution plat ...
Read Project

 10

 FINISHED 
The FI-CONTENT 2 project aims at establishing the foundation of a European infrastructure for promoting and testing novel uses of audio-visual content on connected devices. The partners will develop and deploy advanced platforms for Social Connected TV, Mobile Smart City services, and Gaming/ Virtual worlds. To assess the approach and improve these platforms, user communities in 6 European locatio ...
Read Project

 31

 FINISHED 

Mobile OpportunisTic Traffic Offloading (MOTO)

Start date: Nov 1, 2012, End date: Oct 31, 2015,

To support the booming demand in mobile 4G data services, the MOTO project proposes to design, dimension, implement, and evaluate a new network architecture in support of dynamic traffic offloading strategies to relieve a congested 4G/LTE network. Going far beyond present infrastructure based offloading approaches, MOTO explores an additional layer of disruptive offloading protocols that make use ...
Read Project

 12

 FINISHED 

eXperimental Infrastructures for the Future Internet (XIFI)

Start date: Apr 1, 2013, End date: Sep 30, 2015,

XIFI will establish a sustainable marketplace for trial infrastructures and Future Internet services.XIFI will achieve this vision by integrating and federating a multiplicity of heterogeneous environments – starting from the generic and specific enablers provided by the FI-WARE core platform and the FI-PPP use cases and early trials.Through this approach XIFI will demonstrate and validate the pot ...
Read Project

 38

 FINISHED 

A Source code analysis Toolbox for software security AssuraNCE (STANCE)

Start date: Oct 1, 2012, End date: Sep 30, 2015,

The immunity of a system to malicious third parties trying to modify its behaviour (e.g. to perform unauthorized actions) is called security. Ensuring this feature in information and communication technologies is a requirement for establishing a trustworthy Information Society. Several strategies can be explored to deal with this problem. One of them, called program analysis, relies on formal tech ...
Read Project

 10

 FINISHED 
The iSAR+ Project aims to research and develop guidelines and an associated platform that, in emergencies or crises, enables citizens using new mobile and online technologies to actively participate in the response effort, through the bi-directional provision, dissemination, sharing and retrieval of information essential for critical PPDR intervention, in search and rescue, law enforcement and med ...
Read Project

 20

 FINISHED 

Full-Duplex Radios for Local Access (DUPLO)

Start date: Nov 1, 2012, End date: May 31, 2015,

Future development of wireless communications networks will require radical improvements over the existing radio transmission and network solutions to support tremendous growth of data traffic in future networks in an energy-efficient manner.The project Full-Duplex Radios for Local Access (DUPLO) aims at developing new technology and system solutions for future generations of mobile data networks ...
Read Project

 7

 FINISHED 
VideoSense will integrate leading European research groups to create a long term open integration of critical mass in the twin areas of Ethically-Guided and Privacy Preserving Video Analytics where the advent of new data intelligence technologies against the background of dynamic societal and citizen’s goals, norms, expectations, safety and security needs and thus surveillance requirements have al ...
Read Project

 9

 FINISHED 
European industry has a great potential to achieve a leading position in the growing global market of safety-relevant embedded systems, provided it is able to devise efficient and industrial-strength methods and processes for their development and certification.nSafeCer targets increased efficiency and reduced time-to-market by composable safety certification of safety-relevant embedded systems. A ...
Read Project

 31

 FINISHED 
"To meet both the worldwide demand for food security and new environmental needs, agriculture must increase food production and quality while decreasing its ecological footprint. Ensuring sustainability and competitiveness with reduced pesticide inputs is a major challenge.PURE will provide integrated pest management (IPM) solutions and a practical toolbox for their implementation in key European ...
Read Project

 26

 FINISHED 

FI-WARE: Future Internet Core Platform (FI-WARE)

Start date: May 1, 2011, End date: Dec 31, 2014,

The goal of the FI-WARE project is to advance the global competitiveness of the EU economy by introducing an innovative infrastructure for cost-effective creation and delivery of services, providing high QoS and security guarantees. FI-WARE is designed to meet the demands of key market stakeholders across many different sectors, e.g., healthcare, telecommunications, and environmental services. FI- ...
Read Project

 92

 FINISHED 

Internet Connected Objects for Reconfigurable Ecosystems (iCore)

Start date: Oct 1, 2011, End date: Oct 31, 2014,

The iCore initiative addresses two key issues in the context of the Internet of Things (IoT), namely: (a) how to abstract the technological heterogeneity that derives from the vast amounts of heterogeneous objects, while enhancing context-awareness, reliability and energy-efficiency. (b) to consider the views of different users/stakeholders (owners of objects & communication means) for ensuring pr ...
Read Project

 28

 FINISHED 

CALIPSO: Connect All IP-based Smart Objects! (CALIPSO)

Start date: Sep 1, 2011, End date: Aug 31, 2014,

Smart Objects and the Internet of Things provide unparalleled means toconnect the physical world with the digital world, enabling importantapplications such as Smart Infrastructures, Smart Cities, and SmartToys. But existing systems are typically proprietary and tailored toone specific application and sacrifice interoperability for low powerconsumption. This hinders widespread adoption.CALIPSO bu ...
Read Project

 9

 FINISHED 
Description New tools to reduce design cost of embedded systemsThe latest and greatest embedded systems integrate a wide range of very complex functionalities. A smart phone, for example, is capable to communicate through 3G and WIFI connections. It integrates phone services with high performance graphics and sophisticated software applic ...
Read Project

 10

 FINISHED 
"The PRESTO project aims at improving test-based embedded systems development and validation, while considering the constraints of industrial development processes. This project is based on the integration of (a) test traces exploitation (generated by test execution in the software integration phase induced by the industrial development process, to validate the requirements of the system) along wi ...
Read Project

 15

 FINISHED 

Sea Border Surveillance (SeaBILLA)

Start date: Jun 1, 2010, End date: Feb 28, 2014,

The SeaBILLA proposal aims to 1) define the architecture for cost-effective European Sea Border Surveillance systems, integrating space, land, sea and air assets, including legacy systems; 2) apply advanced technological solutions to increase performances of surveillance functions; 3) develop and demonstrate significant improvements in detection, tracking, identification and automated behaviour an ...
Read Project

 29

 FINISHED 
The detection of IED manufacturing facilities is crucial for the security of citizens, as well as infrastructures and utilities. Current sensing methods suffer from susceptibility to false positive results due to environmental contaminants, or false negative results to interfering compounds. The need exists for a single distributed network, with a common interface and communications protocol, to m ...
Read Project

 8

 FINISHED 
"The aim of this project is to develop a demonstrable, modular and “close-to-market” demonstrator of a stationary rapid reliable vehicle-portable Two Stage Rapid Biological Surveillance and Alarm System for Airborne Threats (TWOBIAS) with extremely low false alarm rates. TWOBIAS will provide reliable information to command control systems (CCS) and first responders within seconds, enhancing securi ...
Read Project

 11

 FINISHED 

UniverSelf

Start date: Sep 1, 2010, End date: Nov 30, 2013,

The internet of today is fragmented into loosely interacting domains. Future Networks will be pervasive: people, machines and the surrounding spaces will form decentralized and dynamic networks of networks of as-yet unseen scales. Future Networks will challenge Service and Network Operators to find the right ways to embed intelligence into networks in order to ensure their autonomic management an ...
Read Project

 22

 FINISHED 
Description Developing innovative surveillance system able to autonomously identify relevant events, and to continuously analyse information The aim of VANAHEIM is to study innovative surveillance components for autonomous monitoring of complex audio/video surveillance infrastructure, such as the ...
Read Project

 8

 FINISHED 

Large Scale Choreographies for the Future Internet (CHOReOS)

Start date: Oct 1, 2010, End date: Sep 30, 2013,

The CHOReOS project positions itself in the context of the Ultra-Large-Scale (ULS) Future Internet of software services. To address the challenges inherent of ULS as well as other key requirements of the Future Internet, such as fusion of the user/developer/system roles, adaptability and QoS-awareness, to name a few, CHOReOS revisits the concept of choreography-based service composition in service ...
Read Project

 17

 FINISHED 
The competitive edge of the European industry in the embedded systems domain is an enabler to achieve a leading position in the growing global market of safety-relevant embedded systems. The main success factors in this context will be the ability to understand the key reasons for the huge increase in cost and development time, and to adopt efficient methods and processes for development of these ...
Read Project

 24

 FINISHED 
CONECT proposes a holistic network design approach that drastically enhances performance in wireless networks by unlocking the hidden potential of the broadcast wireless medium. Information and communication theory, and protocol design engineering are used as the foundations for developing provably optimal cooperative information forwarding strategies, from multi-signal fusion to packet relay and ...
Read Project

 6

 FINISHED 
"VIRTUOSO projects aims at providing European Security stakeholders with a toolkit based on an open-source-software framework and a set of advanced information processing tools. This toolkit will allow building end-user oriented applications: - Ranging from open source collection to decision support - Providing at each step actionable, rated, validated information - Integrated in an open framework ...
Read Project

 19

 FINISHED 

Future INternet for Smart ENergY (FINSENY)

Start date: Apr 1, 2011, End date: Apr 30, 2013,

The energy sector has entered a period of major change which will continue for many years to come. The increasing proportion of electricity from renewable sources means that the architecture of the energy grid will have to support the distributed, in addition to the centralised, generation of energy and to adapt to a highly volatile supply e.g. from wind and solar generators. From the consumption ...
Read Project

 41

 FINISHED 
FIEMSER (Friendly Intelligent Energy Management System for Residential Building) addresses the need of achieving energy positive buildings through solutions based on a rational consumption of energy, local generation and an increase in the consciousness of the building owners towards their energy consumption habits.The main goal of FIEMSER matches with the challenges of the Call by aiming to build ...
Read Project

 8

 FINISHED 
This project will transform the perception of, and possibilities for, the next generation Internet. It addresses the FI Content Usage Call in a number of innovative, practical and useful ways. With inputs from 5 important content areas, spanning future uses of AV, games, Web, metadata and user created content, demonstrating usage beyond current state of the art, we have assembled a consortium incl ...
Read Project

 17