Search for European Projects

24 European Projects Found

Searched on 125080 European Projects

 FINISHED 
PERSEUS contributes to Europe’s efforts to monitor illegal migration and combat related crime and goods smuggling by proposing a large scale demonstration of a EU Maritime surveillance System of Systems, on the basis of existing national systems and platforms, enhancing them with innovative capabilities and moving beyond EUROSUR’s 2013 expectations, addressing key challenges: supporting the netwo ...
Read Project

 35

 FINISHED 
Current 4G vision envisages higher data rates and multi standard radio interfaces to provide all users with a continuous seamless connection. The large number of foreseen devices coupled with the surge in power requirements for future emerging handsets raises significant challenges in terms of: i) reducing the energy consumption; and ii) reducing the amount of electromagnetic radiations.GREENET ta ...
Read Project

 10

 FINISHED 
This project encourages the collaboration between the private and academic sectors for the training of young researchers in the integration of traditional archaeological approaches and newly developed scientific techniques to the study of ancient materials. This well- structured research network aims to improve the career prospects of employment for young researchers, developing their lab-based sk ...
Read Project

 9

 FINISHED 
The objective of PRACTICE project is to improve the preparedness and resilience of the EU member states and associated countries to an attack from a terrorist group using non conventional weapons such as CBRN (Chemical, Biological, Radiological and/or Nuclear agents) materials. The existing situation is characterized by a fragmented structure as regards technology, procedures, methods and organiza ...
Read Project

 28

 FINISHED 
Staphylococcus aureus is a widely disseminated human pathogen whose virulence is associated with a broad range of severe and potentially fatal health complications. It has been shown to produce a series of immunomodulators that promote virulence by affecting both arms of the host immune response. Complement (C’) represents a key innate immune effector that protects against infection, and S. aureus ...
Read Project

 1

 FINISHED 
Supercapacitors are essential in electric vehicles for supplying power during acceleration and recovering braking energy. High power and sufficient energy density (per kilo) are required for both an effective power system but also to reduce weight. There are several issues to achieve a high performance/low weight power system that need to be addressed by various groups of scientists and engineer ...
Read Project

 9

 FINISHED 
Global energy uncertainty and the limited recourses coupled with increased energy needs fuels the search for improving the efficiency of energy conversion technologies. Although the EU policies target increased use of renewable energy to 12% of gross energy production by 2010, this commitment has also highlighted the urgent need for improving the energy utilization of fossil-fuel based power-plant ...
Read Project

 13

 FINISHED 

Total Airport Security System (TASS)

Start date: Apr 1, 2010, End date: Mar 31, 2014,

"TASS is a multi-segment, multi-level intelligence and surveillance system, aimed at creating an entire airport security monitoring solution providing real-time accurate situational awareness to airport authorities.The TASS concept is based on integrating different types of selected real time sensors & sub-systems for data collection in a variety of modes, including fixed and mobile, all suitable ...
Read Project

 22

 FINISHED 
This project aims on the one hand to keep the momentum gained through the European Project EURANOS in establishing a platform where the operational and research community can meet and discuss with all the relevant stakeholders the topics related to emergency response and recovery preparedness and on the other hand to tackle urgent research topics in the area of nuclear emergency response and recov ...
Read Project

 22

 FINISHED 
"There is a high demand for the development of new drug delivery strategies to combat major diseases in our society, particularly cancer. Current treatments are based on high efficacy drugs, however their non-selective uptake by both normal and tumor cells as well as the development of multidrug resistance (MDR), constitute major hurdles. Resistance is also associated with the use of nucleoside an ...
Read Project

 9

 FINISHED 
"The training activities will cover the area of advanced CMOS with special attention on suitable gate dielectrics for high carrier mobility germanium substrates. Since strained Si, especially for nMOS, is running out of steam, high mobility channels could be an alternative option for future 11 nm node and beyond. A Ge CMOS is preferable due to processing simplicity in a Si-compatible flow, however ...
Read Project

 1

 FINISHED 
"In the frame of Activity 9.2.1 – Strengthening of Space foundations / Research to support space science and exploration - SPA.2009.2.1.01 Space Exploration, the actions proposed on RASTAS SPEAR project try to enlarge the basic capabilities on few known topics with low Technology Readiness Level and to strengthen European Industry and Research for coming or future Space Exploration missions with f ...
Read Project

 11

 FINISHED 
"The main problem of First Responders (FR) (fire fighters, police, etc...) in case of crisis at critical infrastructures are the loss of communication and location and the lack of information about the environment (temperature, hazardous gases,etc.). Therefore, during the intervention, there is a gap between the First responders' situation (positioning, health,etc) and the overall view of at their ...
Read Project

 11

 FINISHED 
"Railways are one of the prime modes of transportation in European Union and as they are closely associated with intensive passenger and cargo transportation, they own high risk in terms of potential loss of human life and damage/destruction of assets. New technologies and stringent safety standards are constantly being introduced, to reduce risks associated with derailments and collisions. A deta ...
Read Project

 7

 FINISHED 
TAILPHOX project addresses the design and implementation of Silicon phoXonic crystal structures that allow a simultaneous control of both photonic and phononic waves. The final goal is to push the performance of optical devices well beyond the state of the art by this radically new approach. By merging both fields (nanophotonics and nanophononics) within a same platform, novel unprecedented contro ...
Read Project

 9

 FINISHED 
"Biomineralization is the formation of minerals by living cells and organisms. To understand the processes involved in biomineralization, at the cutting edge between inorganic and organic world, the cooperation between molecular and cell biologists, inorganic chemists, and physical chemists, but also computational scientists is required. The products formed by biomineralization are often composite ...
Read Project

 10

 FINISHED 

Critical Response in Security and Safety Emergencies (CRISYS)

Start date: Feb 1, 2011, End date: May 31, 2012,

"The EU regularly suffers from natural and man-made disaster, the social and economical consequences of which may adversely affect its growth and competitiveness. There is a growing vulnerability to disasters and subsequently an urgent need to improve operational capacities and capabilities of Member States. Furthermore, the Lisbon Treaty will enlarge the role of the EU and allow for stronger coor ...
Read Project

 16

 FINISHED 

Aftermath Crisis Management System-of-systems Demonstration (ACRIMAS)

Start date: Feb 1, 2011, End date: May 31, 2012,

"Crisis management (CM) is a core capability of modern societies, but a highly diversified and heterogeneous area. Current CM in the EU can be regarded as a “system-of-systems” integrating diverse organisations and components with different cultures, policies and assets, and various stakeholders and procurement schemes. ACRIMAS understands the term “system-of-systems” that it incorporates technolo ...
Read Project

 15

 FINISHED 

Event Recognition for Intelligent Resource Management (PRONTO)

Start date: Mar 1, 2009, End date: Feb 29, 2012,

Description Event Recognition and Resource ManagementEvent Recognition and Resource ManagementPRONTO emphasizes the role of event recognition in intelligent resource management. The project proposes a methodology for fusing data from various sources, analysing it to extract useful information in the form of events. The resulting knowledge ...
Read Project

 6

 FINISHED 

Novel tools for crystallisation of macromolecules (TOPCRYST)

Start date: Mar 1, 2008, End date: Feb 29, 2012,

"The elucidation of 3-dimensional structures of proteins and other biological macromolecules and complexes is essential for rational drug design, targeting and delivery, biocatalysis, the design of environmentally friendly agrochemicals, the development of biosensors and other nanobiotechnological applications. The most powerful tool for structural analysis is X-ray crystallography, which cruciall ...
Read Project

 5

 FINISHED 
The proposed project aims at the development of a novel biochip based on monolithic, fully integrated biosensor array fabricated by standard Si-technology and its application to the early diagnosis of human diseases through label-free and multi-analyte detection.The basic sensor scheme consists of a VIS-NIR light source and a waveguide monolithically fabricated on a silicon wafer, while its princi ...
Read Project

 8

 FINISHED 
SERVIVE net proposes the enlargement of the assortment of customizable clothing items currently on offer, the enhancement of all co-design aspects (functionality and fun) and the development and testing of a new production model based on decentralized networked SME cells.The Servive net will not only seamlessly link critical Mass-Customisation (MC) enabling services, but more important it will ada ...
Read Project

 17

 FINISHED 

Supersymmetric Dark Matter and Collider Phenomenology (SUSYDM-PHEN)

Start date: Sep 1, 2007, End date: Aug 31, 2011,

"The compilation of the recent cosmological data from experiments in cosmology and astrophysics, and in particular of those of the WMAP satellite, confirm with greater accuracy the standard cosmological model. According to them the current energy density of the Universe is comprised by about 70% of dark energy and 30% of matter, most of which is in the form of non-baryonic dark matter (DM). It ...
Read Project

 2

 FINISHED 

Dual-channel CMOS for (sub)-22 nm high performance logic (DUALLOGIC)

Start date: Dec 1, 2007, End date: May 31, 2011,

We propose to develop for the first time a dual-channel CMOS technology comprising high channel mobility (high-µ) Ge pMOS and III-V compound semiconductor nMOS transistors co-integrated on the same complex engineered substrate on Si. This offers a high performance booster as an option for the 22 nm technology creating competitive advantage for the European nanoelectronics industry. In addition, hi ...
Read Project

 9