Search for European Projects

Over 40 European Projects Found

Searched on 125080 European Projects

 FINISHED 
Silicon carbide presents a high breakdown field (2-4 MV/cm) and a high energy band gap (2.3–3.2 eV), largely higher than for silicon. Within this frame, the cubic polytype of SiC (3C-SiC) is the only one that can be grown on a host substrate with the huge opportunity to grow only the silicon carbide thickness required for the targeted application. The possible growth on silicon substrate has remai ...
Read Project

 14

 FINISHED 

AUTOmated driving Progressed by Internet Of Things (AUTOPILOT)

Start date: Jan 1, 2017, End date: Dec 31, 2019,

"Automated driving is expected to increase safety, provide more comfort and create many new business opportunities for mobility services. The market size is expected to grow gradually reaching 50% of the market in 2035. The IoT is about enabling connections between objects or "things"; it’s about connecting anything, anytime, anyplace, using any service over any network. There is little doubt that ...
Read Project

 43

 FINISHED 

Ultra-Low PoweR technologIes and MEmory architectures for IoT (PRIME)

Start date: Dec 1, 2015, End date: Mar 31, 2019,

The goal of the PRIME project is to establish an open Ultra Low Power (ULP) Technology Platform containing all necessary design and architecture blocks and components which could enable the European industry to increase and strengthen their competitive and leading eco-system and benefit from market opportunities created by the Internet of Things (IoT) revolution. Over 3 years the project will deve ...
Read Project

 19

 FINISHED 

3D Advanced Metrology and materials for advanced devices (3DAM)

Start date: Apr 1, 2016, End date: Mar 31, 2019,

The objective of the 3DAM project is to develop a new generation of metrology and characterization tools and methodologies enabling the development of the next semiconductor technology nodes. As nano-electronics technology is moving beyond the boundaries of (strained) silicon in planar or finFETs, new 3D device architectures and new materials bring major metrology and characterization challenges w ...
Read Project

 18

 FINISHED 
REMINDER aims to develop an embedded DRAM solution optimized for ultra-low-power consumption and variability immunity, specifically focused on Internet of Things cut-edge devices. The objectives of REMINDER are :i) Investigation (concept, design, characterization, simulation, modelling), selection and optimization of a Floating-Body memory bit cell in terms of low power and low voltage, high relia ...
Read Project

 9

 FINISHED 
OPERA project aims at supporting these ambitious challenges with technological innovation on three main aspects: • Design next generation Low Power (LP) and Ultra-Low Power (ULP) systems, • improve energy efficiency in computing by means of heterogeneous architectures, • and provide smart and energy efficient solution for the interaction between embedded smart systems and remote small form-factor ...
Read Project

 11

 FINISHED 

EXMO 2016: Let’s Experience Mobility

Start date: Oct 1, 2016, End date: Sep 30, 2018,

The project “EXMO 2016 – Let’s experience mobility” is submitted by the Secondary Education Institute “Garfagnana” (http://www.isigarfagnana.gov.it/),. The Institute was created on September 1st, 2013 and brought together four existing secondary schools located in Castelnuovo: the VET institute (IPSIA) “Simoni”, the Institute for commerce, accountancy and surveying (ITCG) “Campedelli”, the Technic ...
Read Project

 23

 FINISHED 

Iniciativas Transnacionais para AcTivar o meio rural

Start date: Oct 1, 2016, End date: Sep 30, 2018,

The requirement to which it is addressed the mobility concern the acquisition by students of specialist knowledge and skills related to the following areas: - Restoration technician, variant Kitchen / Confectionery- Technical Management and Programming Information Systems- Technical Agricultural Production, variant of Plant Production- Industrial Maintenance Technician - Electromechanical- Techni ...
Read Project

 24

 FINISHED 

Bridging the Gap: world of school-world of work

Start date: Sep 19, 2016, End date: Sep 18, 2018,

The project plays an important role in the acquisition of technical and professional skills. It allows the participants to acquire hard and soft skills as well as personal and linguistic skills that provide the young trainees with a professional and initiative knowledge that they can practise on both a local and international level. Within the mobility activities, the project plans to involve 25 ...
Read Project

 26

 FINISHED 

FOREnsic evidence gathering autonomous seNSOR (FORENSOR)

Start date: Sep 1, 2015, End date: Aug 31, 2018,

Covert evidence gathering has not seen major changes in decades. Law enforcement Agencies (LEAs) are still using conventional, manpower based techniques to gather forensic evidence. Concealed surveillance devices can provide irrefutable evidences, but current video surveillance systems are usually bulky and complicated, are often used as simple video recorders, and require complex, expensive infra ...
Read Project

 11

 FINISHED 

Next Station: Improving Professional Skills in Galicia

Start date: Jul 4, 2016, End date: Jul 3, 2018,

General Management of Education, Vocational Training and Educational Innovation in Council of Culture and Education in Galicia is in Santiago de Compostela and manages 205 schools with Vocational Training and 1204 schools in Galicia.Educational adviser and international program coordinator promotes and coordinates european projects with 19 Vocational Training schools with their international coor ...
Read Project

 38

 FINISHED 
Heat management is a paramount challenge in many cutting edge technologies, including new GaN electronic technology, turbine thermal coatings, resistive memories, or thermoelectrics. Further progress requires the help of accurate modeling tools that can predict the performance of new complex materials integrated in these increasingly demanding novel devices. However, there is currently no general ...
Read Project

 7

 FINISHED 

Graphene-based disruptive technologies (GrapheneCore1)

Start date: Apr 1, 2016, End date: Mar 31, 2018,

This project is the second in the series of EC-financed parts of the Graphene Flagship. The Graphene Flagship is a 10 year research and innovation endeavour with a total project cost of 1,000,000,000 euros, funded jointly by the European Commission and member states and associated countries. The first part of the Flagship was a 30-month Collaborative Project, Coordination and Support Action (CP-CS ...
Read Project

 158

 FINISHED 

Pilot Optical Line for Imaging and Sensing (POLIS)

Start date: Jan 6, 2014, End date: Jan 6, 2018,

The KET pilot line project POLIS is aimed at maintaining and furthering the innovation capability of CMOS image and optical sensors in Europe. An existing ST CMOS high volume production line, unique in Europe, will serve as the basis of the proposed project. The strategy behind POLIS lies in the development of specific technological modules and to implement them at pilot line level on the existing ...
Read Project

 20

 FINISHED 

PANACHE

Start date: Jan 2, 2014, End date: Jan 2, 2018,

Pilot line for Advanced Nonvolatile memory technologies for Automotive microControllers, High security applications and general Electronics :The PANACHE project objective is to set-up a pilot line for embedded Flash technology design and manufacturing platform for the prototyping of innovative µcontrollers in Europe.The current 40nm technology platform as well as the already defined 55nm technolog ...
Read Project

 21

 FINISHED 
Micro-Optical MEMS, micro-mirrors and pico-projectors.Lab4MEMS II will feature the Pilot Line for innovative technologies on advanced Micro-Opto-Electro-Mechanical Systems (MOEMS). This is not just a special class of MEMS systems in fact, but it deals with MEMS merged with Micro-optics, which involves sensing or manipulating optical signals on a very small size scale, using integrated mechanical, ...
Read Project

 21

 FINISHED 
The alternation between school and work based learning paths are still quite often separated within the young people education and training paths, but are increasingly central issues to the debate and the political agenda of our country. In particular, in the continuation of the economic crisis, the problem of integrating young people into the labor market has taken on a character of real emergenc ...
Read Project

 25

 FINISHED 
...istributed pilot line between 2 companies: - Soitec for the fabrication of advanced engineered substrates (UTBB: Ultra Thin Body and BOx (buried oxide)) without and with strained silicon top film. - STMicroelectronics for the development and industrialization of state of the art FDSOI technology platform at 14nm and beyond with an industry competitive Power-Performance-Area-Cost (PPAC) trade-off. ...
Read Project

 32

 FINISHED 
Vertical Cavity Surface Emitting Lasers (“VCSEL”) drive and enable a number of fast growing markets, such as data transmission, camera surveillance, optical sensors and industrial processes. They are III-V semiconductor components made from GaAs, that can be processed in a way that resembles LED or CMOS processing. Yet, the status of VCSEL manufacturing is still embryonic when compared to LED manu ...
Read Project

 9

 FINISHED 

Arrowhead (ARROWHEAD)

Start date: Mar 1, 2013, End date: Feb 28, 2017,

"Our society is facing both energy and competitiveness challenges. These challenges are tightly linked and require new dynamic interactions between energy producers and energy consumers, between machines, between systems, between people and systems, etc. Cooperative automation is the key for these dynamic interactions and is enabled by the technology developed around the Internet of Things and Ser ...
Read Project

 87

 FINISHED 

Pilot Line For Self Assembly Copolymer Delivery (PLACYD)

Start date: Jan 1, 2014, End date: Jan 1, 2017,

The PLACYD project aims at strengthening the European leadership in the field of advanced lithography. The consortiums gathers the main European Rnull actors along the whole value chain (Material suppliers, equipment suppliers, semiconductor companies, CAD companies, research laboratories) in order to bring the key materials, processes and design tools for Directed Self Assembly (DSA) Lithography ...
Read Project

 11

 FINISHED 
SEA4KET (Semiconductor Equipment Assessment for Key Enabling Technologies) is an IP proposal taking the consequent step from equipment R&D to equipment assessment experiments. The strategic objective is to effectively combine resources and expertise in a joint assessment of novel equipment for key enabling technologies to foster and accelerate the successful transfer of novel European equipment in ...
Read Project

 26

 FINISHED 

COgnitive & Perceptive CAMeraS (COPCAMS)

Start date: Apr 1, 2013, End date: Sep 30, 2016,

Vision systems are becoming ubiquitous in our daily lives. Complex analysis of images from multiple cameras will become the norm in the future, from cars to industrial systems, from smart cities to facility monitoring, aimed at extracting meaningful, context-dependent information.Today’s market is dominated by a combination of relatively simple, fixed function, configurable cameras that stream vid ...
Read Project

 25

 FINISHED 

Graphene-Based Revolutions in ICT And Beyond (GRAPHENE)

Start date: Oct 1, 2013, End date: Mar 31, 2016,

This Flagship aims to take graphene and related layered materials from a state of raw potential to a point where they can revolutionize multiple industries – from flexible, wearable and transparent electronics, to new energy applications and novel functional composites.Our main scientific and technological objectives in the different tiers of the value chain are to develop material technologies fo ...
Read Project

 154

 FINISHED 

Devices for Neurocontrol and Neurorehabilitation (DENECOR)

Start date: Jun 1, 2013, End date: Mar 31, 2016,

The primary aim of DeNeCor is to resolve this top issue such that electronic neuromodulation therapy becomes mainstream and full market potential can be obtained. We will increase acceptance by neurologists by demonstrating designed co-existency between therapy devices and diagnostic systems. The second aim of DeNeCor is to extrapolate the ‘bilateral’ agreements between AIMD and MRI manufactures i ...
Read Project

 22

 FINISHED 

High Performance and Embedded Architecture and Compilation (HiPEAC)

Start date: Jan 1, 2012, End date: Feb 29, 2016,

The proposed HiPEAC network of excellence is a follow-up of an existing network and wants (i) to steer and to increase the European research in computing systems; (ii) to improve the quality of the European computing systems research, and (iii) to create a visible and integrated pan-European community in computing systems. The network is structured along four programs. The membership program aims ...
Read Project

 14

 FINISHED 

LAB FAB for smart sensors and actuators MEMS (LAB4MEMS)

Start date: Jan 1, 2013, End date: Jun 1, 2015,

General GoalsLab4MEMS will feature the Pilot Line for innovative technologies on advanced piezoelectric and magnetic materials, expected to fuel the next generation’s smart sensors and actuators based on MEMS:1. Micro-actuators, micro-pumps, sensors and electrical power generators, integrated on silicon-based piezoelectric materials (PZT) • for use in Data Storage, Ink Jet, Health Care, Automot ...
Read Project

 21

 FINISHED 
Description REVERIE is a revolution in online social networking. It is safe, collaborative, online environment which brings together realistic inter-personal communication and interaction.REVERIE will bring online social networking into the real-world with interaction and communication based on what people do and say and how they act. In ...
Read Project

 17

 FINISHED 

ENERGY TO SMART GRID (E2SG)

Start date: Apr 1, 2012, End date: Mar 1, 2015,

The target of the overall E2SG project is to devise and design mechanisms and policies to assemble, monitor and control smart grids, i.e. a set of interconnected nodes whose primary goal is to generate, exchange and consume electrical energy in the most efficient and reliable way by exploiting distributed information that is sensed, transmitted and processed over the same set of nodes and links. F ...
Read Project

 32

 FINISHED 
Description SPADnet aims to develop a new generation of smart, CMOS-based large area networked image sensors for photon-starved biomedical applications, build ring-assembly modules for Positron Emission Tomography (PET) imaging, and carry out performance tests in a PET system evaluation testbed.While suited to applications offering repetitiv ...
Read Project

 9

 FINISHED 

Internet of Energy for Electric Mobility (IoE)

Start date: May 1, 2011, End date: Oct 31, 2014,

The objective of Internet of Energy (IoE) is to develop hardware, software and middleware for seamless, secure connectivity and interoperability achieved by connecting the Internet with the energy grids. The application of the IoE will be the infrastructure for the electric mobility. The underlying architecture is of distributed Embedded Systems (ESs), combining power electronics, integrated circu ...
Read Project

 43

 FINISHED 

Bringing the artificial pancreas home (AP@home)

Start date: Feb 1, 2010, End date: Oct 31, 2014,

Description In order to improve treatment of diabetes patients at home, the main goal of AP@Home is to build and evaluate an artificial pancreas (AP). The AP will allow automated glucose control: It monitors your blood glucose (sugar) levels and a software algorithm calculates how much insulin to deliver at any time via a built-in insulin in ...
Read Project

 15

 FINISHED 
"The activity is focused on the design and development of a ""ready-to-market"" single chip GNSS mass marketreceiver for GPS, EGNOS and GALILEO signals.Based on the wide expertise of STM in building high performance, ultra low power consumption receivers for the mass market and on the large experience and involvement of the consortium partners in the different domains (mass market AGNSS leading ro ...
Read Project

 11

 FINISHED 

Semiconductor Equipment Assessment Leveraging Innovation (SEAL)

Start date: Jun 1, 2010, End date: Sep 30, 2013,

Description Seal is an EC-funded project covering semiconductor equipment assessment to strengthen the European semiconductor equipment industry. SEAL is an integrated project consisting of 17 equipment assessment sub-projects in the area of semiconductor manufacturing equipment. The assessment th ...
Read Project

 39

 FINISHED 
"The objective of POLLUX is to develop a distributed real time embedded systems platform for next generation electric vehicles, by using a component and programming-based design methodology. Reference designs and embedded systems architectures for high efficiency innovative mechatronics systems will be addressed with regard to requirements on composability, networking, security, robustness, diagno ...
Read Project

 37

 FINISHED 
The ENIAC JU project MIRANDELA is building a complete digital, mixed-signal, analogue, radio frequency (RF) and millimetre-wave (MMW) platform for the design and production of chips for future wireless communications to address the challenge of transferring anything, from/to anybody, anywhere, at any time and through any path. Components in core CMOS technology and other processes will be characte ...
Read Project

 24

 FINISHED 
The main objective of the COMPLEX project is to increase the competitiveness of the European semiconductor, system integrator and EDA industry by addressing the problem of platform-based design space exploration under consideration of power and performance constraints early in the design process. High performance usually causes high power consumption. A main challenge in today's embedded system de ...
Read Project

 15

 FINISHED 

Embedded Reconfigurable Architectures (ERA)

Start date: Jan 1, 2010, End date: Mar 31, 2013,

Description To develop an embedded system platform that dynamically adapt itself to the applications. The platform will be open-source: both the industry and academia can use it for fast design-space prototypingThe design of embedded systems such as mobile smartphones becomes increasingly more complex as multi-core processors are needed t ...
Read Project

 11

 FINISHED 

COntent Aware Searching, retrieval and sTreaming (COAST)

Start date: Feb 1, 2010, End date: Jul 31, 2012,

Towards the Future Internet age, COAST aims to build a Future Content-Centric Network (FCN) architecture, able to offer network-wide Service Level Agreements (SLAs) in service discovery and content consumption. In COAST FCN, the users will specify solely which content or web service they need and the COAST framework will find and deliver the desired or the most relevant data in an efficient, timel ...
Read Project

 11

 FINISHED 

Next Generation Peer-to-Peer Content Delivery Platform (P2P-Next)

Start date: Jan 1, 2008, End date: Apr 30, 2012,

P2P-Next develops an open source, efficient, trusted, personalized, user-centric, and participatory television and media delivery system with social and collaborative connotation using the emerging Peer-to-Peer (P2P) paradigm, which takes into account the existing EU legal framework.The P2P-Next integrated project will build a next generation Peer-to-Peer (P2P) content delivery platform, to be des ...
Read Project

 22