Search for European Projects

Over 40 European Projects Found

Searched on 125080 European Projects

 FINISHED 
For decades, most of the aviation research activities have been focused on the reduction of noise and NOx and CO2 emissions. However, emissions from aircraft gas turbine engines of non-volatile PM, consisting primarily of soot particles, are of international concern today. Despite the lack of knowledge toward soot formation processes and characterization in terms of mass and size, engine manufactu ...
Read Project

 18

 FINISHED 
InteGrid’s vision is to bridge the gap between citizens, technology and the other players of the energy system. The project will demonstrate how DSOs may enable all stakeholders to actively participate in the energy market and distribution grid management and develop and implement new business models, making use of new data management and consumer involvement approaches. Moreover, the consortium w ...
Read Project

 15

 FINISHED 
From aeronautics to oil&gas, complex metal parts embrace major challenges across their lifecycles from the green field intensive manufacturing to the numerous maintenance and repairing operations worldwide distributed. The synergic combination of additive and subtractive processes could overcome individual shortcomings, going beyond the simple succession of steps. 'Plug and produce' modular approa ...
Read Project

 20

 FINISHED 
Heating consumption in the residential sector in Europe is around 2300 TWh/y, DHW consumptions reaches 500 TWh/y, while cooling consumption is less than 100 TWh/y. The construction sector offers unique opportunities to decarbonise the European economy. However, as the replacement rate of the existing stock is very small (1-1.5 % per year), acceleration is needed.On top of this, the reorganisation ...
Read Project

 18

 FINISHED 
AEROARMS proposes the development of the first aerial robotic system with multiple arms and advanced manipulation capabilities to be applied in industrial inspection and maintenance (I&M). The objectives are:1. R&D on aerial manipulation to perform I&M. This includes: 1.1 Based on previous partner results, developing systems which are able to grab and dock with one or more arms and perform dext ...
Read Project

 10

 FINISHED 
MR-guided Focused Ultrasound Surgery (MRgFUS) combines high intensity focused ultrasound for thermal ablation of diseased tissue with MR imaging to visualise the tumour and surrounding anatomy and to provide MR thermal feedback.However, MRgFUS treatment of the liver and other abdominal organs present tremendous technological challenges, including motion due to breathing and shielding of the target ...
Read Project

 11

 FINISHED 

CO2 capture from cement production (CEMCAP)

Start date: May 1, 2015, End date: Oct 31, 2018,

The European cement industry has committed itself to contributing to climate protection measures and therefore to curbing its CO2 emissions. CO2 capture technologies, although an essential part of all CO2 reduction scenarios, are not yet ready for large-scale deployment in the cement industry. Hence, the primary objective of CEMCAP isTo prepare the ground for large-scale implementation of CO2 capt ...
Read Project

 15

 FINISHED 

Personalised Prognostic Tools for Early Psychosis Management (PRONIA)

Start date: Oct 1, 2013, End date: Sep 30, 2018,

Affective and non-affective psychoses have a major negative impact on human society. They account for 6.3% of the global burden of disease and cost €207 billion per year in Europe alone, making them the most expensive brain-related disorders and even more expensive than cardiovascular diseases. This socioeconomic burden is largely caused by two core disease features: onset in adolescence and early ...
Read Project

 13

 FINISHED 
ambliFibre will develop and validate the first intelligent model-based controlled laser-assisted tape winding system for fibre-reinforced thermoplastic (FRP) components. This system will include optical non-contact monitoring and innovative Human-Machine-Interfaces, which are easily manageable for the worker. Based on thermal and optical models embedded into integral process simulation tools combi ...
Read Project

 12

 FINISHED 

Smart and Networking UnderWAter Robots in Cooperation Meshes (SWARMs)

Start date: Jul 1, 2015, End date: Jun 30, 2018,

Nowadays, the major part of offshore operations is done by divers in dangerous missions. Since their number is limited, the dependency on their work represents a real threat to the offshore industry. The extended use of unmanned underwater vehicles (AUVs/ROVs) could solve this problem but since they are usually tailor-made for a specific task and difficult to operate their deployment is very expen ...
Read Project

 31

 FINISHED 

Consistently Optimised Resilient Secure Global Supply-Chains (CORE)

Start date: May 1, 2014, End date: Apr 30, 2018,

CORE will consolidate, amplify, extend and demonstrate EU knowledge and capabilities and international co-operation for securing supply chains whilst maintaining or improving business performance, with specific reference to key Supply Chain Corridors.CORE will be driven by the requirements of:• the Customs, law enforcement authorities, and other agencies nationally and internationally to increase ...
Read Project

 72

 FINISHED 
Dementia is a growing health problem with enormous costs to society: the costs currently equal 1% of the global gross-domestic product and a three-fold increase to 115 million dementia cases is expected by 2050. Addressing this grave human and economic challenge requires efficient solutions that do not exist yet: tools to detect and diagnose persons at an early phase, and interventions for delayin ...
Read Project

 10

 FINISHED 
Information and Communication technologies (ICT) and robotics for sustainable agriculture
Read Project

 24

 FINISHED 

Collaborative Aerial Robotic Workers (AEROWORKS)

Start date: Jan 1, 2015, End date: Dec 31, 2017,

With aging infrastructure in developing-and-developed countries, and with the gradual expansion of distributed installations, the costs of inspection and repair tasks have been growing vastly and incessantly. To address this reality, a major paradigm shift is required, in order to procure the highly automated, efficient, and reliable solutions that will not only reduce costs, but will also minimiz ...
Read Project

 11

 FINISHED 
Borealis project presents an advanced concept of machine for powder deposition additive manufacturing and ablation processes that integrates 5 AM technologies in a unique solution. The machine is characterized by a redundant structures constituted by a large portal and a small PKM enabling the covering of a large range of working cube and a pattern of ejective nozzles and hybrid laser source targe ...
Read Project

 16

 FINISHED 

Engine Module Validators (ENOVAL)

Start date: Oct 1, 2013, End date: Sep 30, 2017,

The ENOVAL project will provide the next step of engine technologies to achieve and surpass the ACARE 2020 goals on the way towards Flightpath 2050. ENOVAL completes the European 7th Framework Programme (FP7) roadmap of Level 2 aero engine projects. ENOVAL will focus on the low pressure system of ultra-high by-pass ratio propulsion systems (12 < BPR < 20) in conjunction with ultra high overall pre ...
Read Project

 37

 FINISHED 
In search for a more competitive, multiple types of aircrafts, IMA based, avionics platform solution, the European aerospace industry has recently initiated the IMA2G paradigm thanks to the EC funded SCARLETT project.This latter successfully validated a first underlying set of IMA2G concepts (Separate Core Processing resources from I/O resources, introduce resource segments typology of electronics ...
Read Project

 39

 FINISHED 
The objective of the MenTalk project is to develop and offer a language learning curriculum, training material, didactic guidelines and platform directed to men in rural areas who are active in - or want to offer - alternative tourism services. The rationale behind the project is on one hand the need for promoting language learning within the EU, as a means for professional development and enhance ...
Read Project

 6

 FINISHED 

Generic Integrated Forensic Toolbox for CBRN incidents (GIFT CBRN)

Start date: Sep 1, 2014, End date: Aug 31, 2017,

"Forensic investigation is a key component in the fight against crime and the protection of EU societies. At present it is hampered by a lack of protocols and training in carrying out forensic analysis on CBRN-contaminated materials. The aim of GIFT-CBRN is to develop a forensic toolbox for investigating CBRN incidents. This toolbox would provide (1) procedures, sampling methods and detection of C ...
Read Project

 20

 FINISHED 
The overarching goal of AMAZE is to rapidly produce large defect-free additively-manufactured (AM) metallic components up to 2 metres in size, ideally with close to zero waste, for use in the following high-tech sectors namely: aeronautics, space, automotive, nuclear fusion and tooling.Four pilot-scale industrial AM factories will be established and enhanced, thereby giving EU manufacturers and en ...
Read Project

 29

 FINISHED 

Low Emissions Core-Engine Technologies (LEMCOTEC)

Start date: Oct 1, 2011, End date: Jun 30, 2017,

The main objective of the LEMCOTEC project will be the improvement of core-engine thermal efficiency by increasing the overall pressure ratio (OPR) to up to 70 leading to a further reduction of CO2. Since NOx increases with OPR, combustion technologies have to be further developed, at the same time, to at least compensate for this effect. The project will attain and exceed the ACARE targets for 20 ...
Read Project

 39

 FINISHED 
CONTEXT Southampton FC is a professional football club based in Southampton, Hampshire. The main aim of the club's Academy is to scout and develop players who will potentially reach professional status. However, regardless of the level of success achieved in football, Apprentices receive advice and education that provide a solid platform from which they can move forward and make sound decisions in ...
Read Project

 2

 FINISHED 

Engine Breakthrough Components and Subsystems (E-BREAK)

Start date: Oct 1, 2012, End date: Mar 31, 2017,

Future aero engines will need to be more efficient and contribute to the reduction on environmental impact of air transportation. They must reach some standards of performance by reducing emissions and creating some savings on operation costs.EIMG consortium has launched since several years some initiatives to develop future engines in the frame of the European Committee research programmes.Within ...
Read Project

 48

 FINISHED 
Calcium Carbonate Looping (CCL) is a promising long-term technology for low-cost post combustion CO2 capture for fossil fuels using limestone based solid sorbents. It combines the advantages of a small efficiency penalty of 5 to 7 % points and a low CO2 capture cost compared to competing technologies currently under development. First tests performed on the 1 MWth scale have confirmed the feasibil ...
Read Project

 11

 FINISHED 
SnowBall is a €5M STREP R&D proposal of 36 months. Its overall objective is to increase preparedness and response capacities of decision-makers, emergency planners and first responders in respect to amplifying hazards in large disasters.SnowBall consists in a deep analysis of cascading effects and development of methods to anticipate them; and in a Decision Support System able to display current c ...
Read Project

 14

 FINISHED 

Full Aero-thermal Combustor-Turbine interactiOn Research (FACTOR)

Start date: Dec 1, 2010, End date: Nov 30, 2016,

To achieve lower Specific Fuel Consumption (SFC) and CO2/NOx emissions, modern turbomachineries operate at high velocities and high temperature conditions. The lack of confidence in the prediction of combustor-turbine interactions leads to apply extra safety margins on components design. Therefore, the understanding of combustor-turbine flow field interactions is mandatory to preserve High Pressur ...
Read Project

 24

 FINISHED 
CORSAIR project is a wide investigation concerning the capabilities of Cold Spray Technology for maintenance and repair of aeronautic frames and components. Today, deep and systematic investigation in Cold Spray is required to better understand the capabilities and fully validate the technology in aeronautics. In this scenario, the activities planned in CORSAIR project are (1) Explore the real cap ...
Read Project

 13

 FINISHED 

Ultrasound guided cardiac arrythmia treatment (USART)

Start date: Nov 1, 2012, End date: Oct 31, 2016,

"Every 30 second, a person in the Western world suffers sudden cardiac death and/or death from heart failure. These two conditions remain the major challenges in modern cardiology. However, new treatments now emerging offer hope in combating these events.Despite significant advances in new therapeutic approaches, current tools for risk stratification are insufficient, and treatment using ablation ...
Read Project

 2

 FINISHED 
The ExoMet proposal revolves around innovative liquid metal engineering and the application of external physical fields, in order to significantly influence the microstructures and properties of light alloys, such as aluminium and magnesium. Three types of external fields will be explored, namely: electromagnetic, ultrasonic and intensive mechanical shearing.To meet the future EU challenges of lig ...
Read Project

 30

 FINISHED 

Efficient Systems and Propulsion for Small Aircraft (ESPOSA)

Start date: Oct 1, 2011, End date: Jun 30, 2016,

The ESPOSA project will develop and integrate novel design and manufacture technologies for a range of small gas turbine engines up to approx. 1000 kW to provide aircraft manufacturers with better choice of modern propulsion units. It will also deal with engine related systems which contribute to the overall propulsion unit efficiency, safety and pilot workload reduction. Through the newly develop ...
Read Project

 45

 FINISHED 
ManSYS aims to develop and demonstrate a set of e-supply chain tools; to enable the mass adoption of Additive Manufacturing (AM). This will allow businesses to identify and determine the suitability of AM for metal products, and subsequently manage the associated supply-chain issues and ‘facilitating’ open product evolution.The proposed e-supply chain solution will combine all aspects of AM includ ...
Read Project

 13

 FINISHED 
"The core concept of Accelerated Metallurgy is to deliver an integrated pilot-scale facility for the combinatorial synthesis and testing of many thousands of unexplored alloy formulations. This facility would be the first of its kind in the world and would represent a significant advance for metallurgy. The novel technology that enables this HTT facility is based on automated, direct laser deposit ...
Read Project

 34

 FINISHED 

FBS - SchülerInnen auf Auslandspraktikum in Milano und Budapest

Start date: Jun 1, 2014, End date: May 31, 2016,

Our school, Fachberufsschule 2 - Klagenfurt is located in Klagenfurt, Austria´s Kärnten region. Our school provides education in 3 professional fields: office work/administration, cosmetology, trade. This would be the first time for our students to take part in a professional practice abroad and get the chance to lift their knowledge to international level. From more than 1400 students who visit ...
Read Project

 5

 FINISHED 
The environmental benefits of low emissions lean burn technology in reducing NOx emissions up to 80% will only be effective when these are deployed to a large range of new aero-engine applications. While integrating and developing low emission combustion design rules, IMPACT-AE will deliver novel combustor design methodologies for advanced engine architectures and thermodynamic cycles. It will sup ...
Read Project

 21

 FINISHED 
This proposal addresses the collective challenge faced by the SMEs in the construction sector of collecting and using information on products and equipment – designated articles – to comply with regulatory requirements and expectations from their customers.The new regulation on construction products lays down a number of provisions on products to be used in the sector to improve the free flow of p ...
Read Project

 12

 FINISHED 
Sepsis is a life-threatening illness caused by the body’s overreaction to an infection and can be triggered either directly by infection or may occur after medical treatment or surgery.The mortality rate in patients admitted to hospital with severe sepsis is 28-50% and it remains the most prevalent cause of death in non-coronary Intensive Care Units (ICUs ). It is estimated that in the US ~$17 bil ...
Read Project

 9

 FINISHED 

Research on Core Noise Reduction (RECORD)

Start date: Jan 1, 2013, End date: Dec 31, 2015,

In order to achieve the greening of the European air transport with the deployment of low emission and low noise propulsion systems the reduction of core noise plays an important role. The ability to design low core noise aero-engines requires the development of reliable prediction tools. This development demands extensive research with dedicated experimental test cases and sophisticated numerical ...
Read Project

 21

 FINISHED 
"IMPACTS - The impact of the quality of CO2 on transport and storage behaviour will underpin the realisation of the EU CCS European Industrial Initiative implementation plan by developing knowledge and technology needed for Carbon Dioxide Capture, Transport and Storage (CCS) pilots and large-scale demonstrations. IMPACTS is linked to demonstration projects, and will therefore benefit from realisti ...
Read Project

 12

 FINISHED 
Background Europe produces an estimated 250 million used rubber tyres annually. Moreover, this number is expected to increase with an increase in vehicle fleet numbers and reduced numbers of reconditioned tyres. Historically the majority of end-of-use tyres were sent to landfill sites. However, the landfilling of whole tyres – which creates significant ...
Read Project

 7

 FINISHED 

Saliency-aware High-resolution Video Processing (SHIVPRO)

Start date: Sep 13, 2014, End date: Sep 12, 2015,

The ever-increasing spatial/temporal resolution of video such as ultra high definition has raised new challenges on storage, transmission and display for business, home, and mobile video applications, and thus efficient representation, compression, and retargeting of high-resolution (HR) videos become the key issues for effective deployment of these applications. Saliency models can facilitate to ...
Read Project

 1