Search for European Projects

26 European Projects Found

Searched on 125080 European Projects

 FINISHED 
Batteries are not yet the ideal energy container they were promised to be. They are expensive, fragile and potentially dangerous. Moreover the current EV cannot compete yet with traditional vehicles when it comes to driving range and flexibility. EVERLASTING intends to bring Li-ion batteries closer to this ideal by focusing on the following technology areas.• Predicting the behavior of battery ...
Read Project

 11

 FINISHED 

Particle Reduced, Efficient Gasoline Engines (PaREGEn)

Start date: Oct 1, 2016, End date: Sep 30, 2019,

PaREGEn addresses the short term scope of the GV-02 call via research into and the innovation of gasoline engines for light duty vehicles. Specifically, engines used in mid to premium passenger cars will be addressed. With the electrification smaller vehicles, focusing on larger cars is especially important: the need for clean, efficient & economic engines for inter-urban transport is more urgent ...
Read Project

 16

 FINISHED 
ENABLE-S3 will pave the way for accelerated application of highly automated and autonomous systems in the mobility domains automotive, aerospace, rail and maritime as well as in the health care domain. Virtual testing, verification and coverage-oriented test selection methods will enable validation with reasonable efforts. The resulting validation framework will ensure Europeans Industry competiti ...
Read Project

 76

 FINISHED 
The 3Ccar project will provide highly integrated ECS Components for Complexity Control in thereby affordable electrified cars. The new semiconductors for Complexity management (Control, reduction) will offer the next level of energy efficiency in transportation systems.3Ccar’s impact is maximizing pragmatic strategy: Use semiconductor technology innovations to manage functionality & complexity inc ...
Read Project

 47

 FINISHED 

Factory-in-a-day (FACTORY-IN-A-DAY)

Start date: Oct 1, 2013, End date: Sep 30, 2017,

...ates the organizational aspects of robot installation. The project is driven by Europe’s top robotics researchers (e.g. TUD, KUL, TUM, Fraunhofer) and industry players (Philips, Universal Robotics, Siemens, Materialise). The second-largest temp agency Randstad and its participating client SMEs will test hybrid human-robot teams performing short-batch production work. Together with novel certificat ...
Read Project

 18

 FINISHED 
Embedded systems are the key innovation driver to improve almost all mechatronic products with cheaper and even new functionalities. Furthermore, they strongly support today's information society as inter-system communication enabler.Consequently boundaries of application domains are alleviated and ad-hoc connections and interoperability play an increasing role. At the same time, multi-core and ma ...
Read Project

 101

 FINISHED 

Dependable Embedded Wireless Infrastructure (DEWI)

Start date: Mar 1, 2014, End date: Feb 28, 2017,

DEWI (dependable embedded wireless infrastructure) envisions to significantly foster Europe’s leading position in embedded wireless systems and smart (mobile) environments such as vehicles, railway cars, airplanes and buildings. These environments comprise wireless sensor networks and wireless applications for citizens and professional users. Therefore the consortium introduces the concept of a “s ...
Read Project

 61

 FINISHED 

Advanced Reluctance Motors for Electric Vehicle Applications (ARMEVA)

Start date: Nov 1, 2013, End date: Oct 31, 2016,

To enable a large scale adoption of EVs, a new generation of electric drive systems is needed to reduce dependency on rare earth materials, while improving energy efficiency, power density, safe operation and reducing manufacturing/recycling costs. ARMEVA will develop a new rare-earth-material free generation of advanced reluctance motors.The goal of ARMEVA is to achieve similar power density and ...
Read Project

 8

 FINISHED 

Thermal Overall Integrated Conception of Aircraft (TOICA)

Start date: Sep 1, 2013, End date: Sep 30, 2016,

Thermal behaviour of aircraft has recently become a crucial subject due to many factors: increasing number of complex systems required by modern, more electric, commercial aircraft, the introduction of hotter engines with higher by-pass ratios, the increased use of composite material in aircraft structures, or the confinement of highly dissipative equipment and systems in smaller areas to earn spa ...
Read Project

 34

 FINISHED 
By bringing together 21 partners including 7 major carmakers, 7 major suppliers, 2 SME's and 5 academia / research centres, ALIVE will develop directly exploitable knowledge on materials and design concepts which offer a high potential for significantly reducing the weight of vehicles for affordable application to high productions volumes, focusing on next generation Electric Vehicles (EVs).Specif ...
Read Project

 26

 FINISHED 
Even though composite materials are more and more used in modern airframes, many significant improvements are still achievable. Firstly, the substitution of the assembly of many small composite parts by a single one-shot large part provides additional weight reduction. Secondly, the final assembly line process must be adapted to composite properties (lack of ductility, stiffness). Thirdly, if the ...
Read Project

 60

 FINISHED 
"Reaching low levels of cabin and ramp noise is crucial to ensure the satisfaction of aircraft passengers and a safe working environment for the crew and personnel servicing the grounded aircraft. From the passenger and personnel standpoint, good thermal and acoustic comfort is important to minimize both stress symptoms and tiredness. Required to provide satisfactory air quality and temperature, t ...
Read Project

 10

 FINISHED 

Critical System Engineering Acceleration (CRYSTAL)

Start date: May 1, 2013, End date: Jul 31, 2016,

CRYSTAL aims at fostering Europe’s leading edge position in embedded systems engineering in particular regarding quality and cost effectiveness of safety-critical embedded systems and architecture platforms.Its overall goal is to enable sustainable paths to speed up the maturation, integration, and cross-sectoral reusability of technological and methodological bricks of the factories for safety-cr ...
Read Project

 70

 FINISHED 
Electric Vehicles (EV) are subject of many R&D projects aimed at improving their components and overall physical (structural) architecture. In addition, several research projects exist that seek to innovate the overall control system that 'orchestrates' the way all these components perform together in passenger EV.IMPROVE focuses on in-vehicle ICT innovations for commercial (fleet operated) vehicl ...
Read Project

 11

 FINISHED 
"Ultra Light Vehicles (ULV) intrinsically have a better efficiency due to their improved transport capability per vehicle mass. Additionally improved driving dynamics performance can more easily be achieved because of the reduced mass.However, the design of ULV sharing the same road with heavier cars represents a complex technical challenge for achieving acceptable safety levels. Furthermore, at p ...
Read Project

 11

 FINISHED 
Description Infiltration of intelligent and cooperative robotic systems in European production facilities X-act aims to increase the infiltration of intelligent and cooperative robotic systems in European, “robot resistant” production facilities. The project proposes the enhancement of dual arm ro ...
Read Project

 9

 FINISHED 
Following the Green Car Initiative (GCI) included in the European Economic Recovery Plan there is a high demand for electrification of transport in Europe.There are currently several concepts for FEV (fully electric vehicle) and HEV (hybrid electric vehicle) that support this “electro mobility” demand. The development and improvement of the different concepts require a huge effort in analysis, des ...
Read Project

 11

 FINISHED 
Green eMotion aims at enabling mass deployment of electromobility in Europe. To achieve this, major players from industry, the energy sector, municipalities as well as universities and research institutions have joined forces to develop and demonstrate a commonly accepted and user-friendly framework consisting of interoperable and scalable technical solutions in connection with a sustainable busin ...
Read Project

 44

 FINISHED 
"Recent studies suggest that vehicles, driven in electric mode, either hybrid or pure electric vehicles, are considerably quiet and, thus, that they constitute a safety hazard for pedestrians and bicyclists in traffic. It is claimed that such vehicles are not acoustically perceived due to the power unit being exchanged from a combustion engine to electric motors; something that essentially cuts aw ...
Read Project

 13

 FINISHED 

The Foundation for the Smart Factory of the Future (FoFdation)

Start date: Jun 1, 2010, End date: Oct 31, 2014,

Today's major challenges for manufacturing companies, operating under productivity pressures, greater product variability and environmental constraints, are clearly identified as global cooperation with multiple supply chain partners, production optimization, and tracking and management of information to meet new requirements like traceability, security, sustainability. These requirements lead to ...
Read Project

 19

 FINISHED 
VERITAS aims to develop, validate and assess an open framework for built-in accessibility support at all stages of ICT and non-ICT product development, including specification, design, development and testing. The goal is to introduce simulation-based and VR testing at all stages of product design and development into the automotive, smart living spaces, workplace, infotainment and personal health ...
Read Project

 33

 FINISHED 

Efficient Cooling Systems for QUieter Surface Transport (ECOQUEST)

Start date: Dec 1, 2009, End date: May 31, 2013,

"An important subsystem in surface transportation vehicles (rail bound, automotive and heavy duty) is the cooling unit. Present European standards for interoperability of rail bound traffic require low noise levels while manufactures need to meet the vehicle performance and energy efficiency requested by the operators. The stringent EU6 emission limits expected to come into effect will increase dr ...
Read Project

 10

 FINISHED 
"COSMA aims to develop engineering criteria for aircraft design and operations in order to reduce the annoyance within airport communities due to aircraft exterior noise. By today, such criteria do not exist since aircraft noise engineering has historically focused on achieving ever lower noise levels for individual events and at close distance from the runway. Within the frame of a unique approac ...
Read Project

 21

 FINISHED 
"The IMG4 project CRESCENDO addresses the Vision 2020 objectives for the aeronautical industry by contributing significantly to the fulfilment of three specific targets of the aeronautical industry’s Strategic Research Agenda. CRESCENDO will develop the foundations for the Behavioural Digital Aircraft (BDA), taking experience and results from VIVACE, and integrating these into a federative system ...
Read Project

 59

 FINISHED 
"Effective and efficient vibration and acoustic analysis, modelling and design methods are required to produce world-leading products with good noise and vibration performance. Noise and vibration levels must remain within safe limits, there are issues regarding human comfort and a need for robust, optimal, efficient designs. There is also an increasing trend towards virtual design and prototyping ...
Read Project

 13

 FINISHED 
"The embedded safety-critical systems design and development industry is facing increasing complexity and variety of systems and devices, coupled with increasing regulatory constraints while costs, performances and time to market are constantly challenged.This has led to a profusion of enablers (new processes, methods and tools), which are neither integrated nor interoperable because they have bee ...
Read Project

 54