Search for European Projects

Over 40 European Projects Found

Searched on 125080 European Projects

 FINISHED 

Internet of Food and Farm 2020 (IoF2020)

Start date: Jan 1, 2017, End date: Dec 31, 2020,

The IoF2020 project is dedicated to accelerate adoption of IoT for securing sufficient, safe and healthy food and to strengthen competitiveness of farming and food chains in Europe.It will consolidate Europe’s leading position in the global IoT industry by fostering a symbiotic ecosystem of farmers, food industry, technology providers and research institutes.The IoF2020 consortium of 73 partners, ...
Read Project

 72

 FINISHED 
We hypothesize that inappropriate thyroid hormone action in target cells is a common mechanism underlying susceptibility to age-related degenerative diseases and co-morbidities. Although regulation of systemic thyroid status is well understood and underpins treatment of common thyroid disease, it is only in the last decade that the importance of local regulation of thyroid hormone action in tissue ...
Read Project

 7

 FINISHED 
The npSCOPE project aims at developing a new integrated instrument (the nanoparticle-scope) optimised for providing a complete physico-chemical characterisation of nanoparticles both in their pristine form or embedded in complex matrices such as biological tissues. Using sophisticated correlative data processing methodologies and algorithms based on statistical methods in conjunction with appropri ...
Read Project

 9

 FINISHED 
The SeaDataNet pan-European infrastructure has been developed by NODCs and major research institutes from 34 countries. Over 100 marine data centres are connected and provide discovery and access to data resources for all European researchers. Moreover, SeaDataNet is a key infrastructure driving several portals of the European Marine Observation and Data network (EMODnet), initiated by EU DG-MARE ...
Read Project

 57

 FINISHED 
Based on a detailed mapping of urban challenges and relevant nature-based solutions (NBS), Nature4Cities aims at developing complementary and interactive modules to engage urban stakeholders in a collective-learning process about re-naturing cities, develop and circulate new business, financial and governance models for NBS projects, as well as provide tools for the impacts assessment, valorisatio ...
Read Project

 26

 FINISHED 

Reliable Bio-based Refinery Intermediates (BioMates)

Start date: Oct 1, 2016, End date: Sep 30, 2020,

The EU targets at replacing 10% of all transport fossil fuels with biofuels by 2020 to reduce the dependence on petroleum through the use of nationally, regionally or locally produced biofuels, while simultaneously reducing greenhouse gas emissions. However, the EU is concerned with the questionable sustainability of the conventional biofuels and the unattractive production costs of second and thi ...
Read Project

 9

 FINISHED 
The objective of the SPOTVIEW project is to develop and demonstrate innovative, sustainable and efficient processes and technology components, in order to optimize the use of natural resources, especially water, in three industrial sectors (Dairy, Pulp and Paper and Steel) contributing to 44% of industrial water usage in EU. This resource optimization (including water, energy, raw materials and ad ...
Read Project

 15

 FINISHED 
A recent evaluation of FP7 projects executed by the EC, showed that an estimated 80% of funded Health projects lacks valorisation. The “UTILE” proposal presents the EU-Health Innovation Marketplace, an online tool to better valorise the FP7 Health and Horizon2020 SC1 project results. This marketplace will actively bring together Innovation Providers (i.e. technology push) and the Innovation Develo ...
Read Project

 11

 FINISHED 

MEMbrane based Purification of HYdrogen System (MEMPHYS)

Start date: Jan 1, 2017, End date: Dec 31, 2019,

Project MEMPHYS, MEMbrane based Purification of HYdrogen System, targets the development of a stand-alone hydrogen purification system based on a scalable membrane hydrogen purification module. Applications are for instance hydrogen recovery from biomass fermentation, industrial pipelines, storage in underground caverns, and industrial waste gas streams.The consortium consists of six partners incl ...
Read Project

 6

 FINISHED 

Data-Driven Bioeconomy (DataBio)

Start date: Jan 1, 2017, End date: Dec 31, 2019,

The data intensive target sector selected for the DataBio project is the Data-Driven Bioeconomy, focusing in production of best possible raw materials from agriculture, forestry and fishery/aquaculture for the bioeconomy industry to produce food, energy and biomaterials taking into account also various responsibility and sustainability issues. DataBio proposes to deploy a state of the art, big dat ...
Read Project

 49

 FINISHED 
ICT is embedded and pervasive into our daily lives. The notion of Cyber Physical Systems (CPS) has emerged: embedded computational collaborating devices, capable of controlling physical elements and responding to humans.The Cross-layer modEl-based fRamework for multi-oBjective dEsign of Reconfigurable systems in unceRtain hybRid envirOnments (CERBERO) project aims at developing a design environmen ...
Read Project

 12

 FINISHED 

Nanomedicine: an integrative approach (NANOMED)

Start date: Jan 1, 2016, End date: Dec 31, 2019,

...ment trajectory required for NM. This is achieved by the combined effort of 7 beneficiaries from academia and industry and 5 non-academic partner organisations, which are all thoroughly rooted in nanosciences and pharmaceutical sciences. Our objective is to develop scalable and highly controllable design and synthesis methods for the most promising nanomedicine types in a preclinical setting. NANO ...
Read Project

 7

 FINISHED 
The BIOrescue project aims to develop and demonstrate a new innovative biorefinery concept based on the cascading use of spent mushroom substrate (SMS) supplemented by wheat straw (and other seasonal underutilised lignocellulosic feedstocks. i.e pruning residues, residual citrus peels and wastes). This new concept will avoid disposal and allow for the production of some biodegradable bio-based pro ...
Read Project

 12

 FINISHED 
The COSMOS proposal aims to reduce Europe’s dependence on imported coconut and palm kernel oils and fatty acids and castor oil as sources for medium-chain fatty acids (MCFA, C10–C14) and medium-chain polymer building blocks. These are needed by the oleochemical industry for the production of plastics, surfactants, detergents, lubricants, plasticisers and other products. In COSMOS, camelina and cra ...
Read Project

 21

 FINISHED 
Within the project SURE (Novel Productivity Enhancement Concept for a Sustainable Utilization of a Geothermal Resource) the radial water jet drilling (RJD) technology will be investigated and tested as a method to increase inflow into insufficiently producing geothermal wells. Radial water jet drilling uses the power of a focused jet of fluids, applied to a rock through a coil inserted in an exist ...
Read Project

 11

 FINISHED 
The current healthcare systems are built around the traditional paradigm of patients suffering from a single acute illness. They are therefore largely unprepared to face the increasing demands for health services arising from the expansion of an older population with specific medical needs related to multiple chronic disorders. As a consequence, the medical conditions of a large and growing seg ...
Read Project

 27

 FINISHED 
ENABLE-S3 will pave the way for accelerated application of highly automated and autonomous systems in the mobility domains automotive, aerospace, rail and maritime as well as in the health care domain. Virtual testing, verification and coverage-oriented test selection methods will enable validation with reasonable efforts. The resulting validation framework will ensure Europeans Industry competiti ...
Read Project

 76

 FINISHED 

Authentication and Authorisation For Research and Collaboration (AARC2)

Start date: May 1, 2017, End date: Apr 30, 2019,

The goal of AARC2 is to design an AAI framework to develop interoperable AAI, to enable researchers to access the whole research and infrastructure service portfolio with one login. AARC2's objectives are:1. enable federated access in research communities participating in AARC22. assist research communities to map their requirements to concrete service offerings3. support research (e-)infrastructu ...
Read Project

 26

 FINISHED 

Astronomy ESFRI and Research Infrastructure Cluster (ASTERICS)

Start date: May 1, 2015, End date: Apr 30, 2019,

ASTERICS (Astronomy ESFRI & Research Infrastructure Cluster) aims to address the cross-cutting synergies and common challenges shared by the various Astronomy ESFRI facilities (SKA, CTA, KM3Net & E-ELT). It brings together for the first time, the astronomy, astrophysics and particle astrophysics communities, in addition to other related research infrastructures. The major objectives of ASTERICS ar ...
Read Project

 24

 FINISHED 
The overall aim of Real-Time-Mining is to develop a real-time framework to decrease environmental impact and increase resource efficiency in the European raw material extraction industry. The key concept of the proposed research promotes the change in paradigm from discontinuous intermittent process monitoring to a continuous process and quality management system in highly selective mining operati ...
Read Project

 14

 FINISHED 
Mobility, important for well-being, is seriously impaired by chronic low back pain and osteoarthritis in many people due to degeneration of cartilaginous tissue of the intervertebral disc and joint. To develop a treatment for these diseases this ETN aims to combine expertise in novel highly advanced drug delivery carriers with dedicated targeting tools, state of the art imaging techniques and expe ...
Read Project

 11

 FINISHED 
The eNHANCE project key objective is to symbiotically mechanically support and motivate people with motor impairments resulting from muscular or neural degeneration (e.g. stroke) to perform complex daily life tasks. Our system aims to assist the user in performing their daily-life interaction with the environment through an intelligent multi-modal adaptive interface controlled by a high performanc ...
Read Project

 11

 FINISHED 
The S-5P, S-4 and S-5 instruments aboard the Copernicus atmospheric Sentinel missions can be exploited to monitor the profile of ozone concentration in the Earth’s atmosphere with unprecedented accuracy and timeliness. As the most important radiatively active gas in the stratosphere and short-lived climate forcer, oxidizing agent and pollutant in the troposphere, ozone shall be vertically retrieve ...
Read Project

 9

 FINISHED 
VINEYARD will develop an integrated platform for energy-efficient data centres based on new servers with novel, coarse-grain and fine-grain, programmable hardware accelerators. It will, also, build a high-level programming framework for allowing end-users to seamlessly utilize these accelerators in heterogeneous computing systems by using typical data-centre programming frameworks (e.g. MapReduce, ...
Read Project

 11

 FINISHED 

The European Open Science Cloud for Research Pilot Project. (EOSCpilot)

Start date: Jan 1, 2017, End date: Dec 31, 2018,

The EOSCpilot project will support the first phase in the development of the European Open Science Cloud (EOSC) as described in the EC Communication on European Cloud Initiatives [2016]. • It will establish the governance framework for the EOSC and contribute to the development of European open science policy and best practice; • It will develop a number of pilots that integrate service ...
Read Project

 39

 FINISHED 

MUltiSectoral Integrative approaches to CArdiac care (MUSICA)

Start date: Jan 1, 2015, End date: Dec 31, 2018,

MUltiSectoral Integrative approaches to CArdiac care – MUSICA - is proposed by a team of universities, companies and hospitals from 4 EU countries (Italy, United Kingdom, The Netherlands, Belgium). The main scope of MUSICA is to structure a new trans-sectoral and multidisciplinary network capable of developing research and technology with no barriers between academia, industries and clinicians in ...
Read Project

 10

 FINISHED 

PROcessing Diluted Aqueous Systems (PRODIAS)

Start date: Jan 1, 2015, End date: Dec 31, 2018,

The use of renewable resources in the process industries is socially desirable and a market pull for products has started to develop in recent years, but renewable products have to compete with identical or similar-in-application products based on fossil raw materials in terms of quality and production cost. One of the main reasons for currently higher production costs of products based on renewab ...
Read Project

 11

 FINISHED 

Ensuring the Integrity of the European food chain (FOODINTEGRITY)

Start date: Jan 1, 2014, End date: Dec 31, 2018,

Food Integrity “the state of being whole, entire, or undiminished or in perfect condition”.Providing assurance to consumers and other stakeholders about the safety, authenticity and quality of European food (integrity) is of prime importance in adding value to the European Agri-food economy. The integrity of European foods is under constant threat from fraudulently labelled imitations that try to ...
Read Project

 64

 FINISHED 
OPERA project aims at supporting these ambitious challenges with technological innovation on three main aspects: • Design next generation Low Power (LP) and Ultra-Low Power (ULP) systems, • improve energy efficiency in computing by means of heterogeneous architectures, • and provide smart and energy efficient solution for the interaction between embedded smart systems and remote small form-factor ...
Read Project

 11

 FINISHED 
Emerging evidence indicates that the gut microbiome contributes to our ability to extract energy from the diet and influences development and function of the immune, endocrine and nervous systems, which regulate energy balance and behaviour. This has led to hypothesize that developing microbiome-based dietary interventions can be cost-effective measures to prevent diet-related and behavioural diso ...
Read Project

 30

 FINISHED 
Research and training in TheLink spans the material development chain for nanostructured polymers. These materials, including phase separated polymers and composites, are attracting scientific and industrial interest due to the outstanding properties and functionalities that can be achieved. However, to exploit the potential of these materials an in-depth understanding of the relationship between ...
Read Project

 10

 FINISHED 

Targets and biomarkers for antiepileptogenesis (EPITARGET)

Start date: Nov 1, 2013, End date: Oct 31, 2018,

Epilepsy is a devastating condition affecting over 50 million people worldwide. This multidisciplinary project is focused on the process leading to epilepsy, epileptogenesis, in adults. Our main hypothesis is that there are combinations of various causes, acting in parallel and/or in succession, that lead to epileptogenesis and development of seizures. Our central premise and vision is that a comb ...
Read Project

 20

 FINISHED 

Helix Nebula – The Science Cloud (HNSciCloud)

Start date: Jan 1, 2016, End date: Jun 30, 2018,

Over the coming 10-15 years the generation of vast amounts of data created by scientific research domains will create enormous challenges for capturing, managing and processing of this data. Tests have been made but today commercial cloud services do not play a significant role in the production computing environments for the publicly funded research sector in Europe. Stimulated by the Pre-Commer ...
Read Project

 11

 FINISHED 

Smart and Networking UnderWAter Robots in Cooperation Meshes (SWARMs)

Start date: Jul 1, 2015, End date: Jun 30, 2018,

Nowadays, the major part of offshore operations is done by divers in dangerous missions. Since their number is limited, the dependency on their work represents a real threat to the offshore industry. The extended use of unmanned underwater vehicles (AUVs/ROVs) could solve this problem but since they are usually tailor-made for a specific task and difficult to operate their deployment is very expen ...
Read Project

 31

 FINISHED 

Training Augmented Reality Generalised Environment Toolkit (TARGET)

Start date: May 1, 2015, End date: Apr 30, 2018,

TARGET will deliver a pan-European serious gaming platform featuring new tools, techniques and content for training and assessing skills and competencies of SCA (Security Critical Agents - counterterrorism units, border guards, first responders (police, firefighters, ambulance services civil security agencies, critical infrastructure operators).Mixed-reality experiences will immerse trainees at ta ...
Read Project

 19

 FINISHED 
The overall concept of MANTIS is to provide a proactive maintenance service platform architecture based on Cyber Physical Systems that allows to estimate future performance, to predict and prevent imminent failures and to schedule proactive maintenance. Maintenance is no longer a necessary evil that costs what it costs, but an important function that creates additional value in the business proces ...
Read Project

 47

 FINISHED 

Graphene-based disruptive technologies (GrapheneCore1)

Start date: Apr 1, 2016, End date: Mar 31, 2018,

This project is the second in the series of EC-financed parts of the Graphene Flagship. The Graphene Flagship is a 10 year research and innovation endeavour with a total project cost of 1,000,000,000 euros, funded jointly by the European Commission and member states and associated countries. The first part of the Flagship was a 30-month Collaborative Project, Coordination and Support Action (CP-CS ...
Read Project

 158

 FINISHED 
"ASCENT will provide a robust proof-of-concept of three related high temperature processes; each will lead to a step-change in efficiency of carbon removal in three types of pre-combustion capture, producing the hydrogen needed for highly efficient low-carbon power production. The project brings together five small and medium enterprises preparing to launch these concepts with the support of leadi ...
Read Project

 18

 FINISHED 
The DROPSA consortium will create new knowledge and understanding of the damage and losses of fruit crops resulting from pests and pathogens, with a specific focus on the new and emerging threats due to Drosophila suzukii and quarantine pathogens Pseudomonas syringae, Xanthomonas fragariae and X. arboricola. The project will deliver a cost effective approach that can be widely implemented by the E ...
Read Project

 27

 FINISHED 

EUDAT2020

Start date: Mar 1, 2015, End date: Feb 28, 2018,

EUDAT2020 brings together a unique consortium of e-infrastructure providers, research infrastructure operators, and researchers from a wide range of scientific disciplines under several of the ESFRI themes, working together to address the new data challenge. In most research communities, there is a growing awareness that the “rising tide of data” will require new approaches to data management and ...
Read Project

 36