Search for European Projects

Over 40 European Projects Found

Searched on 125080 European Projects

 FINISHED 
HORSE aims to bring a leap forward in the manufacturing industry proposing a new flexible model of smart factory involving collaboration of humans, robots, AGV’s (Autonomous Guided Vehicles) and machinery to realize industrial tasks in an efficient manner. HORSE proposes to foster technology deployment towards SMEs by developing a methodological and technical framework for easy adaptation of robot ...
Read Project

 15

 FINISHED 
The AQUAVALENS consortium has brought together SMEs, Industries, Universities and Research Institutes with the mission of protecting the health of European Citizens from contaminated drinking water and water used in food processing. We will achieve this by developing sustainable technologies to enable water system managers whether in large or small water systems or within food growers or manufactu ...
Read Project

 43

 FINISHED 
This project will establish a demonstration fleet of small passenger vehicles that builds on and expands existing hydrogen refuelling infrastructure. Three European regions will be participating in this effort: the UK (the Midlands and Plymouth), the Brussels area and Wallonia, and the Weser-Ems region in NorthWest Germany. Each of these regions will deploy a new hydrogen refuelling site to close ...
Read Project

 18

 FINISHED 
The success of the European vision of a low carbon electricity grid that minimises greenhouse gas emissions; and enhances security, quality and reliability of supply depends on how smart infrastructures, combining energy and telecom, are developed and implemented for the wider integration of security-aware distributed energy resources into the increasingly decentralised grid. MAS2TERING, a 3-year ...
Read Project

 9

 FINISHED 
LASHARE will develop a robust assessment framework for innovative laser equipment paving the way for new manufacturing applications. It will carry out a large number of assessment experiments for a variety of laser equipment targeting strategic manufacturing areas for Europe.The Laser Equipment Assessment (LEA) will be carried out by a trio of research/supplier/user partners. Each LEA will define ...
Read Project

 40

 FINISHED 
FoAM-BUILD will develop next generation External Thermal Insulation Composite Systems (ETICS) for new builds and retrofitting applications. This comprises innovations in:1) Insulation material: development of new, lightweight and highly insulating nano-cellular foams, with a 50% reduction in thermal conductivity compared to conventional insulation elements. Non-halogenated nano-based flame retarda ...
Read Project

 12

 FINISHED 

Danube Region INCO-NET (DANUBE-INCO.NET)

Start date: Jan 1, 2014, End date: Jun 30, 2017,

Danube-INCO.NET understands itself as strategic high-level coordination and support action. Its background is the macro-regional approach of the European Union, in particular the EU Strategy for the Danube Region (EUSDR) and its Priority Areas for Knowledge Society (PA7) and for Competitiveness (PA8). Based on strong institutionaliszed links with the PA Coordinators and the PA Steering Groups, a c ...
Read Project

 22

 FINISHED 

Joint Operation for Ultra Low Emission Shipping (JOULES)

Start date: Jun 1, 2013, End date: May 31, 2017,

Reducing emissions from shipping has increasingly become a challenge over the last years, both as a counter measure against global climate change and to protect local environments and population from waste, gas emissions and noise.This challenge has been documented both in policy papers, like the Europe 2020 initiative or the Transport White Paper, and in rules and regulations issued by IMO as wel ...
Read Project

 44

 FINISHED 

WATER AND ENERGY ADVANCED MANAGEMENT FOR IRRIGATION (WEAM4I)

Start date: Nov 1, 2013, End date: Apr 30, 2017,

Agriculture sector is accountable for 30% of the total water consumption in Europe, but reaches up to 70% of total water consumption in several European southern countries. In recent years, most of the efforts have been focused on water efficiency, without taking care of energy aspects, resulting in some cases on a significant increase in energy consumption, both per irrigated surface and per volu ...
Read Project

 19

 FINISHED 

Dependable Embedded Wireless Infrastructure (DEWI)

Start date: Mar 1, 2014, End date: Feb 28, 2017,

DEWI (dependable embedded wireless infrastructure) envisions to significantly foster Europe’s leading position in embedded wireless systems and smart (mobile) environments such as vehicles, railway cars, airplanes and buildings. These environments comprise wireless sensor networks and wireless applications for citizens and professional users. Therefore the consortium introduces the concept of a “s ...
Read Project

 61

 FINISHED 
"Intrinsic (or residual) stresses, resulting from manufacturing or processing steps, mostly define the performance and limit the lifetime of nanostructured materials, thin films, coatings and MEMS devices.The established techniques for micron-scale measurement of residual stress still have strong limitations, e.g. in terms of spatial resolution, lack of depth sensing, their applicability on non-cr ...
Read Project

 16

 FINISHED 

Managing Impacts of Deep-seA reSource exploitation (MIDAS)

Start date: Nov 1, 2013, End date: Oct 31, 2016,

The MIDAS project addresses fundamental environmental issues relating to the exploitation of deep-sea mineral and energy resources; specifically polymetallic sulphides, manganese nodules, cobalt-rich ferromanganese crusts, methane hydrates and the potential mining of rare earth elements. These new industries will have significant impacts on deep-sea ecosystems, in some cases extending over hundre ...
Read Project

 34

 FINISHED 
Existing test standards for biomass room heating appliances (pellet and firewood stoves, and inset appliances) have supported technology development tremendously in past decades. Due to today’s changing and more demanding requirements, however, there is the obvious need for refined testing procedures in order to differentiate between poor and excellent products. Such differentiation should take in ...
Read Project

 15

 FINISHED 

Europe-Wide Platform for Cooperative Mobility Services (MOBiNET)

Start date: Nov 1, 2012, End date: Aug 31, 2016,

MOBiNET will develop, deploy and operate the technical and organisational foundations of an open, multi-vendor platform for Europe-wide mobility services. Key MOBiNET innovations address the barriers to cooperative system-enabled service deployment, including the lack of harmonised services; availability of communication means; inaccessibility and incompatibility of transport-related data; fragmen ...
Read Project

 23

 FINISHED 
ManSYS aims to develop and demonstrate a set of e-supply chain tools; to enable the mass adoption of Additive Manufacturing (AM). This will allow businesses to identify and determine the suitability of AM for metal products, and subsequently manage the associated supply-chain issues and ‘facilitating’ open product evolution.The proposed e-supply chain solution will combine all aspects of AM includ ...
Read Project

 13

 FINISHED 
The COMTES project has as goal to develop and demonstrate three novel systems for compact seasonal storage of solar thermal energy. These systems will contribute to the EU 20-20-20 targets by covering a larger share of the domestic energy demand with solar thermal energy.Main objective of COMTES is to develop and demonstrate systems for seasonal storage that are significantly better than water bas ...
Read Project

 11

 FINISHED 

European Plant Phenotyping Network (EPPN)

Start date: Jan 1, 2012, End date: Dec 31, 2015,

The ability to quantitatively analyze plant phenotypic traits (from single cells to plant and stand level) and their dynamic responses to the environment is an essential requirement for genetic and physiological research, and the cornerstone for enabling applications of scientific findings to bioeconomy. Whereas molecular profiling technologies allow today the generation of a large amount of data ...
Read Project

 14

 FINISHED 

Online Professional Irrigation Scheduling Expert System (OpIRIS)

Start date: Dec 1, 2013, End date: Nov 30, 2015,

Increasing water scarcity and environmental concerns have urged the search for solutions for better water management in irrigated agriculture. Precision irrigation is one of these solutions.Technologies have developed potential systems, although effective partnerships have to be fostered between private industry and scientific community to shape up some common and complementary solutions.The proje ...
Read Project

 13

 FINISHED 
The future in manufacturing is oriented to more flexible and adaptable systems. Customization is also a great challenge and a way of giving added value to the products. And aesthetic personalization is one of the main ways for achieving customization.UV-Marking project aims at demonstrating that unitary customization (individual configurations/designs of each customer) is possible, by developing a ...
Read Project

 12

 FINISHED 
Anthocyanins are health promoting dietary polyphenols that protect against cardiovascular disease, caner and obesity in preclinical studies with animals. The ATHENA project will address how good dietary anthocyanins are in protecting against chronic disease, by addressing the following questions: • Benefits and risks: What is the dose response to anthocyanin phytonutrients? Are anthocyanins from d ...
Read Project

 14

 FINISHED 
With a share of 38%, orthopaedic and traumatology (O&T) are the worldwide leading markets of implanted biomaterials, involving millions of new patients each year at an increasing trend. Infection related to implanted medical devices is directly related to bacterial capability to establish multilayered, highly structured biofilms on artificial surfaces. Bacterial infections due to implanted biomate ...
Read Project

 13

 FINISHED 

Biology and control of vector-borne infections in Europe (EDENext)

Start date: Jan 1, 2011, End date: Jun 30, 2015,

To address the call for proposals 'Biology and control of vector-borne infections in Europe' launched by the European Commission, we want to investigate the biological, ecological and epidemiological components of vector-borne diseases (VBD) introduction, emergence and spread, and to propose innovative tools for controlling them, building on the basis of acquired knowledge. We have selected the ma ...
Read Project

 54

 FINISHED 
AIM: To identify the molecular mechanisms characterizing cilium function, and the discrete perturbations associated with dysfunction caused by mutations in inherited ciliopathies, applying a systems biology approach. BACKGROUND: Cilia are microtubule-based, centriole-derived projections from the cell surface. They transduce extracellular signals and regulate key processes in which signals of the e ...
Read Project

 17

 FINISHED 
What is missing so far in the European Union are disaster management procedures, tools and systems which fully take into account the specific characteristics and requirements of large-scale international cooperation in emergency situations. These characteristics are distinguished by many diverse emergency response organisations that need to collaborate across technological systems, organisational ...
Read Project

 19

 FINISHED 
A revolution is happening in computer hardware. After three decades during which microprocessor speeds increased almost 4000 times, we are starting to hit long-predicted physical limits on the speed of a single processor. Recent computers instead use two, four or even twelve processor cores working together ``in parallel'', giving peak performance that is equivalent to a 5GHz, 10GHz or even 30GHz ...
Read Project

 13

 FINISHED 
"Developmental plasticity modulated by epigenetic processes such as methylation and post-translational modifications is influenced by early life events and determines risk of age related diseases later in lifeWe propose a multi-disciplinary approach incorporating biochemistry, genetics, epidemiology, epigenetics and bioinformatics to discover novel biomarkers of ageing and interventional pathways ...
Read Project

 10

 FINISHED 

Combined Model-based Analysis and Testing of Embedded Systems (MBAT)

Start date: Nov 1, 2011, End date: Dec 31, 2014,

"One of the most important strategic sectors in which Europe is developing, integrating and delivering high-quality products is the transportation domain. Here, high-class safety-related products as e.g. airplanes, cars and trains have a huge market impact. More and more of the market value of these vehicles is gained by embedded systems inside these products, and the number and importance of thes ...
Read Project

 42

 FINISHED 

European Nuclear Science and Applications Research (ENSAR)

Start date: Sep 1, 2010, End date: Dec 31, 2014,

ENSAR is the Integrating Activity of Nuclear Scientists from almost all European countries performing research in three of the major subfields of Nuclear Physics: Nuclear Structure, Nuclear Astrophysics and Applications of Nuclear Science. It proposes an optimised ensemble of Networking (NAs), Transnational Access and Joint Research Activities (JRAs), which will ensure qualitative and quantitative ...
Read Project

 32

 FINISHED 

Smart Connected Electro Mobility (smartCEM)

Start date: Jan 1, 2012, End date: Dec 31, 2014,

Four European cities/regions (Barcelona, Gipuzkoa-San Sebastian, Newcastle and Reggio Emilia) have come together to demonstrate the role of ICT solutions for cities and citizens in addressing shortcomings of electro mobility. Electric power solutions have proven to offer a potentially ground-breaking solution for more energy-efficient and less petrol-dependent vehicles and transport systems. The ...
Read Project

 31

 FINISHED 

The Foundation for the Smart Factory of the Future (FoFdation)

Start date: Jun 1, 2010, End date: Oct 31, 2014,

Today's major challenges for manufacturing companies, operating under productivity pressures, greater product variability and environmental constraints, are clearly identified as global cooperation with multiple supply chain partners, production optimization, and tracking and management of information to meet new requirements like traceability, security, sustainability. These requirements lead to ...
Read Project

 19

 FINISHED 
Currently, there is a lack of consistent coordination between the activities of the various ETPs, which has led to a diverse range of ideas as to what is important to European materials developments, and consequently a somewhat fragmented support for these developments. In 2010, a group of ETPs (EuMaT, Suschem, Manufuture, FTC, ESTEP and SMR) with most significant material agenda, came together to ...
Read Project

 12

 FINISHED 
"Space heating accounts for more than 50% of the energy consumption of public & residential buildings, and reduction of this energy demand is a key strategy in the move to low energy/low carbon buildings. The careful management of air flow within a building forms part of this strategy through the control of inlet fresh air and exhaust air, maximising air re-circulation, and minimising the amount o ...
Read Project

 9

 FINISHED 

All Condition Operations and Innovative Cockpit Infrastructure (ALICIA)

Start date: Sep 1, 2009, End date: Aug 31, 2014,

"ALICIA addresses the ACARE objective of increasing time efficiency within the future air transport system. The aim will be to develop a new and scalable cockpit application which can extend operations of aircraft in degraded conditions – “All Conditions Operations”. A key objective will be to deliver an extensible application that can be applied to many aircraft types. This will necessarily enta ...
Read Project

 42

 FINISHED 

PRACE - Second Implementation Phase Project (PRACE-2IP)

Start date: Sep 1, 2011, End date: Aug 31, 2014,

PRACE-2IP supports the accelerated implementation of the pan-European HPC Research Infrastructure created in April 2010 as the result of the preparatory phase PRACE project. It complements and extends the work of the PRACE-1IP project that was started in July 2010.PRACE-2IP addresses the computational and simulation needs of European scientific communities to keep them at the forefront of discover ...
Read Project

 50

 FINISHED 
"This project aims to the development at an initial industrial level of an advanced, lithium ion battery for efficient application in the sustainable vehicle market. The basic structure of this battery involves a lithium-metal (tin)-carbon, Sn-C, alloy anode, a lithium nickel manganese oxide, LiNi0.5Mn1.5O4, cathode and a ceramic-added, gel-type membrane electrolyte. This battery is expected to m ...
Read Project

 12

 FINISHED 

Massive Digital sequencing by binary DNA (Digital Sequencing)

Start date: Dec 1, 2009, End date: May 31, 2014,

DNA sequencing costs have fallen more than 50-fold over the past decade, driven part by tools, technology and process improvements made during the Human Genome Project. However, it still costs around $10 million to sequence 3 billion base pairs - the amount of DNA found in the genomes of humans and other mammals. 1st generation sequencing platforms, which are based upon capillary electrophoresis ...
Read Project

 5

 FINISHED 
The development and implementation of bio-refinery processes is an absolute necessity and the key to meet the vision towards bio-based economy. The EuroBioRef concept is an integrated, sustainable and diversified bio-refinery involving all biomass value chain stakeholders. The latter will allow large-scale research, testing, optimisation and demonstration of processes in the production of a wide r ...
Read Project

 34

 FINISHED 
The eCoMove project will create an integrated solution for road transport energy efficiency by developing systems and tools to help drivers sustainably eliminate unnecessary fuel consumption (and thus CO2 emissions), and to help road operators manage traffic in the most energy-efficient way. By applying this combination of cooperative systems using vehicle-infrastructure communication, the project ...
Read Project

 43

 FINISHED 
IMC-AESOP will investigate a Service-oriented Architecture approach for monitoring and control of Process Control applications (batch and continuous process). Large process industry systems are a complex set of multi-disciplinary, connected, heterogeneous systems that function as a complex system of which the components are themselves systems. They link many components from individual groups of se ...
Read Project

 19

 FINISHED 

PRACE - First Implementation Phase Project (PRACE-1IP)

Start date: Jul 1, 2010, End date: Dec 31, 2013,

Large scale simulations are the third pillar of science today alongside theory and experiment. They produce scientific insights, technological advances, and solve problems in many fields of society. Their tools are high-end computers and effective software. PRACE, the Partnership for Advanced Computing, has been created as a not for profit association in May 2010 as a permanent pan-European High P ...
Read Project

 46