Search for European Projects

14 European Projects Found

Searched on 125080 European Projects

 FINISHED 

Industrial Energy and Environment Efficiency (Indus3Es)

Start date: Oct 1, 2015, End date: Jun 30, 2019,

Large quantities of waste heat are continuously rejected from industries. Most of this waste energy, however, is of low-quality and is not practical or economical to recover it with current technologies. The Indus3Es project will develop an innovative Absorption Heat Transformer (AHT) for this purpose, focused on low temperature waste heat recovery (below 130ºC). The Indus3Es System will effective ...
Read Project

 10

 FINISHED 

Graphene-based disruptive technologies (GrapheneCore1)

Start date: Apr 1, 2016, End date: Mar 31, 2018,

This project is the second in the series of EC-financed parts of the Graphene Flagship. The Graphene Flagship is a 10 year research and innovation endeavour with a total project cost of 1,000,000,000 euros, funded jointly by the European Commission and member states and associated countries. The first part of the Flagship was a 30-month Collaborative Project, Coordination and Support Action (CP-CS ...
Read Project

 158

 FINISHED 

FAST industrialisation by CAtalysts Research and Development (FASTCARD)

Start date: Jan 1, 2014, End date: Dec 31, 2017,

"To meet short term European 20-20-20 objectives and long term targets of European Energy Roadmap 2050, an energy paradigm shift is needed for which biomass conversion into advanced biofuels is essential.This new deal has challenges in catalyst development which so far hinders implementation at industrial level: Firstly, biomass is much more complex and reactive than conventional feedstock; second ...
Read Project

 14

 FINISHED 

HPC for Energy (HPC4E)

Start date: Dec 1, 2015, End date: Nov 30, 2017,

This project aims to apply the new exascale HPC techniques to energy industry simulations, customizing them, and going beyond the state-of-the-art in the required HPC exascale simulations for different energy sources: wind energy production and design, efficient combustion systems for biomass-derived fuels (biogas), and exploration geophysics for hydrocarbon reservoirs.For wind energy industry HPC ...
Read Project

 8

 FINISHED 

Sustainable Pavements & Railways Initial Training Network (SUP&R ITN)

Start date: Oct 1, 2013, End date: Sep 30, 2017,

"The design, construction, maintenance, use and end-of-life management of road pavements and railways is associated with a number of important impacts on the environment; namely the consequences of energy consumption, unsustainable use of materials/resources, waste generation and release of hazardous substances into the environment. It is estimated that over 80% of all these environmental impacts ...
Read Project

 10

 FINISHED 
The Eco2CO2 project aims at exploiting a photo-electro-chemical (PEC) CO2 conversion route for the synthesis of methanol as a key intermediate for the production of fine chemicals (fragrances, flavourings, adhesives, monomers,…) in a lignocellulosic biorefinery. A distinct improvement in the ecological footprint of the envisaged chemical industries will thus be achieved by: i) boosting the potenti ...
Read Project

 9

 FINISHED 

Sustainable Hydrothermal Manufacturing of Nanomaterials (SHYMAN)

Start date: May 1, 2012, End date: Apr 30, 2016,

...l end users in four key areas – printed electronics with SOVY; surface coatings with CRF, PPG and SOVY; healthcare and medical with ENDOR and CERA; hybrid polymers and materials with TopGaN and REPSOL. Further value will be added to the Project by working on new materials that have been identified as key future targets but cannot be currently made, or made in significant quantities. The consortium ...
Read Project

 19

 FINISHED 

Graphene-Based Revolutions in ICT And Beyond (GRAPHENE)

Start date: Oct 1, 2013, End date: Mar 31, 2016,

This Flagship aims to take graphene and related layered materials from a state of raw potential to a point where they can revolutionize multiple industries – from flexible, wearable and transparent electronics, to new energy applications and novel functional composites.Our main scientific and technological objectives in the different tiers of the value chain are to develop material technologies fo ...
Read Project

 154

 FINISHED 
"MEDGATE combines the expertise of 29 geoscientists from both the oil industry and academia in the training of 10 researchers. It aims to equip these researchers for successful careers in either sector through interdisciplinary projects focussing on an intriguing problem which has implications for both environmental change and hydrocarbon exploration. The research aim of MEDGATE is to reconstruc ...
Read Project

 5

 FINISHED 
This proposal will aim to develop the enabling technology that will enable existing pipe crawling robots (pigs) to provide internal inspection of pipe walls using long range ultrasound guided waves (LRUG) deployed in pipe segments of about fifty metre length.The aim is to perform total volume inspection far more rapidly, accurately and cheaply than is presently achieved with magnetic and ultrasoni ...
Read Project

 8

 FINISHED 
The project concept is to combine nanoreactor technology with multisite solid catalyst design to achieve a safer, cleaner and intensified chemical production. The project ideas are the following: (i) From micro- to nano-reactors. Actual microreactor have channels of micrometric size. We will develop a new concept based on the use of nanometric size channels. (ii) Vectorial pathway for multisite ca ...
Read Project

 11

 FINISHED 

Demonstration of the WindFloat Technology (DEMOWFLOAT)

Start date: Jul 15, 2011, End date: Jul 14, 2014,

Consistent with industrial initiative of the SET Plan this project addresses the objective of a grid-connected multi-megawatt fully integrated offshore wind turbine hosted on a floating support structure. The Proposed Project is in the unique position to leverage significant pre-existing financial and intellectual capital invested by the project coordinator, WindPlus in a PILOT unit installation ...
Read Project

 12

 FINISHED 
The project will demonstrate a 200.000 t/year capacity flexible FAME production plant, starting from different kinds of raw material oils, with the aim of reducing 40% of the CO2 balance compared to the well to wheel emissions of a conventional fossil diesel plant, through the following measures: to develop an integrated transesterification process, linked to the neighbouring crushing process thro ...
Read Project

 6

 FINISHED 
...e dissemination and training, and project management. The project is co-ordinated by ECN (The Netherlands). Other participants involved: 4 SMEs (ETC, TK, VFT, Bioro), 3 industries (Greencell, Cehave, Repsol), 2 universities (Aston, UGent) and 3 RTD institutes (VTT, WUR A&F, STFI). Project duration: 24 months. Total requested EC-grant: 995 kEuro."
Read Project

 14