Search for European Projects

19 European Projects Found

Searched on 125080 European Projects

 FINISHED 
"The Strategic Research Agenda of the EU Sustainable Nuclear Energy Technical platform requires new large infrastructures for its successful deployment. MYRRHA has been identified as a long term supporting research facility for all ESNII systems and as such put in the high-priority list of ESFRI. The goal of MAXSIMA is to contribute to the ""safety in MYRRHA"" assessment.MAXSIMA has five technical ...
Read Project

 14

 FINISHED 

CAST (CArbon-14 Source Term) (CAST)

Start date: Oct 1, 2013, End date: Mar 31, 2018,

The CAST project (CArbon-14 Source Term) aims to develop understanding of the generation and release of 14C from radioactive waste materials under conditions relevant to waste packaging and disposal to underground geological disposal facilities. The project will focus on releases from irradiated metals (steels, Zircaloys) and from ion-exchange materials as dissolved and gaseous species. A study t ...
Read Project

 37

 FINISHED 
The European Energy Research Alliance, set-up under the European Strategic Energy Technology Plan, has launched an initiative for a Joint Programme on Nuclear Materials (JPNM). The JPNM aims at establishing key priorities in the area of advanced nuclear materials, identifying funding opportunities and harmonizing this scientific & technical domain at the European level by maximizing complementarit ...
Read Project

 32

 FINISHED 

Preparing ESNII for HORIZON 2020 (ESNII plus)

Start date: Sep 1, 2013, End date: Aug 31, 2017,

Preparing ESNII for HORIZON 2020The aim of this cross-cutting project is to develop a broad strategic approach to advanced fission systems in Europe in support of the European Sustainable Industrial Initiative (ESNII) within the SET-Plan. The project aims to prepare ESNII structuration and deployment strategy, to ensure efficient European coordinated research on Reactor Safety for the next generat ...
Read Project

 37

 FINISHED 

Advanced Safety Assessment : Extended PSA (ASAMPSA_E)

Start date: Jul 1, 2013, End date: Dec 31, 2016,

The Fukushima nuclear accident in Japan resulted from the combination of two correlated extreme external events (earthquake and tsunami). The consequences (flooding in particular) went beyond what was considered in the initial NPP design. Such situations can be identified using PSA methodology that complements the deterministic approach for beyond design accidents. If the performance of a Level 1 ...
Read Project

 29

 FINISHED 
"The ARCADIA project has been conceived so as to provide a twofold support to the further development of nuclear research programs in the NMS, targeting two major areas included in the Strategic Research and Innovation Agenda of SNETP: ESNII, through the support of the ALFRED project towards its realization in Romania, and NUGENIA, approaching remaining safety aspects of Gen III/III+ that could be ...
Read Project

 28

 FINISHED 

MyrrhA Research Infrastructure Support Action (MARISA)

Start date: Sep 1, 2013, End date: Aug 31, 2016,

"The MYRRHA project aims to develop and to construct a world-class and first-of-a-kind nuclear research infrastructure. The design and the construction of the MYRRHA facility is particularly challenging since it requires the management of a large number of activities in view of achieving technical excellence in compliance with the project budget and schedule. Accordingly, state-of-the-art project ...
Read Project

 17

 FINISHED 
The objective of PLATENSO is to provide a proposal towards establishing the legal base for a European Entity on Socio-Economic matters linked to nuclear technology and to develop recommendations for research strategies in PLATENSO countries. Thereby the capabilities of research institutes in Central and Eastern European countries to take part in EU research with respect to governance, social and s ...
Read Project

 21

 FINISHED 
"Education, training and information to the general public are key factors in the governance of ionising radiation risks. Communication about ionising radiation with the general public has to to be further improved, as highlighted also by the 2011 accident in Japan. An effort is needed to analyse the state of the art and the existing needs in education, training and information, and to coordinate ...
Read Project

 11

 FINISHED 

Safe ExploitAtion Related CHemistry for HLM reactors (SEARCH)

Start date: Nov 1, 2011, End date: Apr 30, 2015,

"In accordance with the ESNII roadmap MYRRHA will be the first HLM cooled nuclear system to be deployed in Europe. The SEARCH project aims to support the licensing process of MYRRHA by investigating the safe chemical behaviour of the fuel and coolant in the reactor. The control of the oxygen content and the management of impurities in the melt will be studied. A second critical issue in the safety ...
Read Project

 13

 FINISHED 

MATerials TEsting and Rules (MATTER)

Start date: Jan 1, 2011, End date: Dec 31, 2014,

The 2010-2012 implementation plan of the European Sustainable NuclearIndustrial Initiative (ESNII), in the frame of the Sustainable Nuclear Energy Technology Platform (SNE TP), establishes a very tight time schedule for the start of construction of the European Gen IV prototypes; namely the construction of the LFR ETPP (European Technology Pilot Plant) Myrrha will start in 2014 and that of the SF ...
Read Project

 30

 FINISHED 
The focus of IPPA is on the establishment of arenas where different stakeholders can move forward together to increase their understanding of the issues involved in radioactive waste disposal and of their respective views. The focus is on implementation in some central and eastern European countries. The overall structure is in one end to take stock of existing research results and other experienc ...
Read Project

 16

 FINISHED 
"The overall objective of the project is to assess, optimise and develop the use of advanced tools for the structural integrity assessment of reactor coolant pressure boundary components (RCPB) relevant to ageing and life time management and to integrate the knowledge created in the project into mainstream nuclear industry assessment codes. Realistic failure models for some of the key components w ...
Read Project

 21

 FINISHED 

New MS Linking for an Advanced Cohesion in Euratom Research (NEWLANCER)

Start date: Nov 1, 2011, End date: Oct 31, 2013,

"NEWLANCER project proposes to identify and implement effective and efficient actual solutions leading to enlarged NMS involvement in future Euratom Framework Programmes by strengthening and catalyzing the full R&D potential at national level, by increasing cohesion between New Member States institutions, and by improving their cooperation with Old Member States research centres.The specific sub-o ...
Read Project

 19

 FINISHED 

Lead-cooled European Advanced Demonstration Reactor (LEADER)

Start date: Apr 2, 2010, End date: Oct 1, 2013,

"The LEADER proposal deals with the development to a conceptual level of a Lead Fast Reactor Industrial size plant and of a scaled demonstrator of the LFR technology. The proposal is based on previous achievements obtained during the 6th FP of the EU in the ELSY project but takes into account the indications emerged from the European Strategic Research Agenda as well as the main goals of the Europ ...
Read Project

 17

 FINISHED 

Fate of Repository Gases (FORGE)

Start date: Feb 1, 2009, End date: Sep 30, 2013,

"The multiple barrier concept is the cornerstone of all proposed schemes for underground disposal of radioactive wastes. The concept invokes a series of barriers, both engineered and natural, between the waste and the surface. Achieving this concept is the primary objective of all disposal programmes, from site appraisal and characterisation to repository design and construction. However, the perf ...
Read Project

 25

 FINISHED 
"Gas-Cooled Reactors (GCR), RBMK and some Material Test Reactors (MTR) make use of graphite as moderator of the fuel, structures of the core and/or thermal columns. During operation, the graphite and other carbonaceous materials like carbon brick, pyrocarbon and silicon carbide coatings are contaminated by fission products and neutron activation. These irradiated carbonaceous wastes are problemati ...
Read Project

 30

 FINISHED 

Severe Accident Research Network of Excellence 2 (SARNET2)

Start date: Apr 1, 2009, End date: Mar 31, 2013,

Most of the actors involved in severe accident research in Europe, plus Canada, Korea and the United States (41 partners), will network in SARNET2 (Severe Accident Research NETwork of Excellence - Phase 2) their capacities of research in order to resolve important pending issues on postulated severe accidents of existing and future Nuclear Power Plants (NPPs). The project has been defined in order ...
Read Project

 45

 FINISHED 

ADvanced Reactor Initiative And Network Arrangement (ADRIANA)

Start date: Feb 1, 2010, End date: Jul 31, 2011,

"The coordinating action ADRIANA (ADvanced Reactor Initiative And Network Arrangement) is proposed to setting up the network dedicated to the construction and operation of research infrastructures in support of developments for the European Industrial Initiative for sustainable nuclear fission. The project as the base for the current long-term taking place coordination activities of Euroatom under ...
Read Project

 15