Search for European Projects

8 European Projects Found

Searched on 125080 European Projects

 FINISHED 

Switch and Crossing Optimal Design and Evaluation (S-CODE)

Start date: Nov 1, 2016, End date: Oct 31, 2019,

...ed around new operating concepts (e.g. super-fast switching, self-healing switch). The project will build on existing European and national research projects (in particular, the lighthouse project In2Rail, Capacity4Rail and Innotrack) to bring together technologies and concepts that will significantly reduce the constraints associated with existing switch technologies and develop a radically diffe ...
Read Project

 9

 FINISHED 

Synchro-modal Supply Chain Eco-Net (SYNCHRO-NET)

Start date: May 1, 2015, End date: Oct 31, 2018,

SYNCHRO-NET will demonstrate how a powerful and innovative SYNCHRO-modal supply chain eco-NET can catalyse the uptake of the slow steaming concept and synchro-modality, guaranteeing cost-effective robust solutions that de-stress the supply chain to reduce emissions and costs for logistics operations while simultaneously increasing reliability and service levels for logistics users.The core of the ...
Read Project

 19

 FINISHED 
...e establishment of good governance will effectively secure the confidence of the industry to use the Interoperability Framework (IF) semantic technologies that will be established under the IP4 Shift2Rail program. The objective of the Governance of the IF for Rail and Intermodal Mobility (GoF4R) project is to define sustainable governance for the IF that will create the right conditions to introdu ...
Read Project

 16

 FINISHED 

INFORMATION TECHNOLOGIES FOR SHIFT TO RAIL (IT2RAIL)

Start date: May 1, 2015, End date: Oct 31, 2017,

The IT²RAIL -“Information Technologies for Shift to rail” proposal, first step towards the long term IP4 -“IT for an Attractive Railway” SHIFT²RAIL Innovation Programme, aims at providing a new seamless travel experience, giving access to a complete multimodal travel offer which connects the first and last mile to long distance journeys.This is achieved through the introduction of a ground breakin ...
Read Project

 33

 FINISHED 
D-RAIL will focus on freight traffic, identifying root causes of derailment of particular significance to freight vehicles, which have a wider range of operating parameters (as a result of the huge range in loads, speeds and maintenance quality) than passenger vehicles. One key question that will be studied is how independent minor faults (e.g., a slight track twist and a failing bearing) could co ...
Read Project

 22

 FINISHED 
The certification of a rail vehicle according to European regulations, Technical Specifications for Interoperability, European Standards and national safety rules represents a significant element of both vehicle cost and time to market. Indeed, a large part of vehicle certification mandates testing for safety, performance and infrastructure compatibility. The new EN standards together with the CR/ ...
Read Project

 23

 FINISHED 
"The current interoperability approval process for new High Speed and Conventional railway vehicles in Europe is a very long and costly process. The Technical Specifications for Interoperability provide common regulations for the homologation of new rolling stock but do not directly eliminate the current burdens regarding new vehicle approval on each network. In this context, the pantograph/catena ...
Read Project

 16

 FINISHED 
"The certification of a rail vehicle according to European regulations, Technical Specifications for Interoperability, European Standards and national safety rules represents a significant element of both vehicle cost and time to market. Indeed, a large part of vehicle certification mandates testing for safety, performance and infrastructure compatibility. AEROTRAIN will help meet the business sce ...
Read Project

 18