Search for European Projects

6 European Projects Found

Searched on 125080 European Projects

 FINISHED 
"This project will support the ESNII (European Sustainable Nuclear Industrial Initiative) roadmap and the Strategic Research Agenda and the Deployment Strategy of SNETP (Sustainable Nuclear Energy Technology Platform) on the enhancement of Sodium-cooled Fast neutron Reactors (SFR) safety, especially towards a higher resistance to severe accidents.In the initiation phase of SFR core disruptive acci ...
Read Project

 9

 FINISHED 

Fast Reactor Experiments for hYbrid Applications (FREYA)

Start date: Mar 1, 2011, End date: Feb 29, 2016,

"Building up on the former activities accomplished in the previous FPs, namely MUSE in FP5 and EUROTRANS in FP6, it is proposed in the FREYA project to extend the investigations of the subcritical configurations for validation of the methodology for on-line reactivity monitoring of ADS systems. The investigations will be related to the different subcriticality levels for the nominal operation mode ...
Read Project

 17

 FINISHED 

NUCLEAR REACTOR SAFETY SIMULATION PLATFORM (NURESAFE)

Start date: Jan 1, 2013, End date: Dec 31, 2015,

After the 2011 disaster that occurred in Japan, improvement of nuclear safety appears more clearly as a paramount condition for further development of nuclear industry. The NURESAFE project addresses engineering aspects of nuclear safety, especially those relative to design basis accidents (DBA). Although the Japanese event was a severe accident, in a process of defense-in-depth, prevention and c ...
Read Project

 25

 FINISHED 
"The European Sustainable Nuclear Industrial Initiative was launched in November 2010 to anticipate the development a fleet of fast reactors with closed cycle. Three fast neutron technologies have been selected:• the Sodium cooled Fast Reactor with the ASTRID prototype• the Lead cooled Fast Reactor with the ALFRED demonstrator which will be preceded by a pilotplan MYRRHA• the Gas cooled Fast Rea ...
Read Project

 22

 FINISHED 

New MS Linking for an Advanced Cohesion in Euratom Research (NEWLANCER)

Start date: Nov 1, 2011, End date: Oct 31, 2013,

"NEWLANCER project proposes to identify and implement effective and efficient actual solutions leading to enlarged NMS involvement in future Euratom Framework Programmes by strengthening and catalyzing the full R&D potential at national level, by increasing cohesion between New Member States institutions, and by improving their cooperation with Old Member States research centres.The specific sub-o ...
Read Project

 19

 FINISHED 

Optimization of Radiation Protection of Medical Staff (ORAMED)

Start date: Feb 1, 2008, End date: Jan 31, 2011,

"The state-of-the-art analysis performed in the FP6 CONRAD project highlighted high extremity doses and a lack of systematic data analysis on exposures to the staff in interventional radiology (IR) and nuclear medicine (NM). To optimize the working procedures in the medical field with respect to radiation protection, a project focussed on improving the knowledge on extremity and eye lens exposures ...
Read Project

 12