Search for European Projects

12 European Projects Found

Searched on 125080 European Projects

 FINISHED 
"ECCO-MATE aims to create a research and training platform for the development and implementation of novel fuel mixture preparation, injection profiling, air management and staged/low temperature combustion technologies both in marine and light-duty automotive diesel engines. The marine (slow speed, large-sized, two-stroke engines) and land-transport (high speed, small-to-medium-sized, four-stroke ...
Read Project

 12

 FINISHED 
Buildings consume about 40% of total final energy in Europe, and those built before 1980 represent 95% of this energy consumption. The low renovation rate of building stock (1% per year) means that boosting energy efficient buildings’ retrofitting is the only way to reach EU’s “20-20-20” targets. The higher impact will be achieved through interventions in non-residential buildings, as their energy ...
Read Project

 22

 FINISHED 

Arrowhead (ARROWHEAD)

Start date: Mar 1, 2013, End date: Feb 28, 2017,

...llenges. These challenges are tightly linked and require new dynamic interactions between energy producers and energy consumers, between machines, between systems, between people and systems, etc. Cooperative automation is the key for these dynamic interactions and is enabled by the technology developed around the Internet of Things and Service Oriented Architectures.The objective of the Arrowhead ...
Read Project

 87

 FINISHED 
...gy in particular wherever it is impractical to convert cropland to energy crop cultivation . According to FAO’s reportage (1997) , large quantities of ligneous biomass can be obtained from pruning operations carried out in Mediterranean fruit plantations. Agricultural residues therefore play an important role in any analysis of biomass availability for a specific area. For this reason it is import ...
Read Project

 19

 FINISHED 
...need to be melted. This makes diffusion bonding an ideal solution for joining materials such as metals to ceramics and Aluminium, Titanium, Nickel, Steel etc.Other advantages include near-parent properties, minimal shape change to parts and no post-finishing. The key to successful diffusion bonding lies in choosing process conditions which are appropriate to the circumstances, because the joint ne ...
Read Project

 6

 FINISHED 

eXperimental Infrastructures for the Future Internet (XIFI)

Start date: Apr 1, 2013, End date: Sep 30, 2015,

...I will demonstrate and validate the potential and capabilities of a unified market for Future Internet facilities overcoming a number of existing limitations to the current set of Future Internet experimental infrastructures available across Europe, such as fragmentation, interoperability and scalability. XIFI will also extend its efforts to include the results of other Future Internet services an ...
Read Project

 38

 FINISHED 

A Novel Decision Support System for Intelligent Maintenance (IMAIN)

Start date: Sep 1, 2012, End date: Aug 31, 2015,

“iMain” is an European level research project aiming to develop a novel decision support system for predictive maintenance. To that end, a multi-layer solution integrating embedded information devices and artificial intelligence techniques for knowledge extraction and novel reliability & maintainability practices will be developed. The resulting solution will provide extended capabilities compared ...
Read Project

 9

 FINISHED 
Description Europeana Libraries is a 2-year project that will bring the digital collections of 19 of Europe’s leading research libraries to Europeana and The European Library. The content will include:• 1,200 film and video clips• 850,000 images• 4.3 million texts (books, journal articles, theses, letters)The project will create a valuable r ...
Read Project

 25

 FINISHED 

Advanced flexible automation cell (FLEXA)

Start date: Jun 1, 2008, End date: Nov 30, 2012,

"Truly flexible automation of -low volume, -high value per part components, -managing quality assurance aspect throughout the value chain is a key research area for the manufacturing and production community in Europe. The FLEXA project has identified key elements for delivering advancement in this area. The key areas of research will be; cell design solutions in line with product design decisions ...
Read Project

 17

 FINISHED 
...l fuels based energy production to the use of renewable energy sources (RES) and clean fuels to produce the required energy to cover the building energy needs. However, in order to ensure continuous operation of energy systems based on RES it is necessary to find a proper way to balance the intermittent nature of RES. Currently, the solution is to store the excess of the produced electricity in la ...
Read Project

 19

 FINISHED 

Researcher's Night in Sweden - ForskarFredag 2009 (FF09)

Start date: May 1, 2009, End date: Nov 30, 2009,

"Researchers’ Night in Sweden, ForskarFredag (Researchers´ Friday), FF, consists of sixteen events and three associated events in nineteen cities, geographically dispersed over Sweden. The project aims at bringing the broad public face-to-face with researchers. FF will take place on 25 September 2009, coordinated by Vetenskap & Allmänhet (Public & Science), as in 2006, 2007 and 2008. Project partn ...
Read Project

 16

 FINISHED 

Researchers' Night in Sweden - ForskarFredag 2008 (FF08)

Start date: Jun 1, 2008, End date: Dec 31, 2008,

Researchers’ Night in Sweden, ForskarFredag (Researchers´ Friday), FF, consists of twelve events and three associated events in seventeen cities, dispersed geographically over Sweden. The project aims at bringing the broad public face-to-face with researchers. FF will be organised on 26 September 2008 and is coordinated by Vetenskap & Allmänhet (Public & Science), as in 2006 and 2007. Project part ...
Read Project

 12