Search for European Projects

Over 40 European Projects Found

Searched on 125080 European Projects

 FINISHED 

Optical Infrared Coordination Network for Astronomy (OPTICON)

Start date: Jan 1, 2017, End date: Dec 31, 2020,

Europe has become a global leader in optical-near infrared astronomy through excellence in space and ground-based experimental and theoretical research. While the major infrastructures are delivered through major national and multi-national agencies (ESO, ESA) their continuing scientific competitiveness requires a strong community of scientists and technologists distributed across Europe’s nations ...
Read Project

 34

 FINISHED 
For decades, most of the aviation research activities have been focused on the reduction of noise and NOx and CO2 emissions. However, emissions from aircraft gas turbine engines of non-volatile PM, consisting primarily of soot particles, are of international concern today. Despite the lack of knowledge toward soot formation processes and characterization in terms of mass and size, engine manufactu ...
Read Project

 18

 FINISHED 

AEROelastic instabilities and control of FLEXible Structures (AEROFLEX)

Start date: Jul 1, 2015, End date: Jun 30, 2020,

Aeroelastic instabilities are at the origin of large deformations of structures and are limiting the capacities of products in various industrial branches such as aeronautics, marine industry, or wind electricity production. If suppressing aeroelastic instabilities is an ultimate goal, a paradigm shift in the technological development is to take advantage of these instabilities to achieve others o ...
Read Project

 1

 FINISHED 

WADI

Start date: Oct 1, 2016, End date: Mar 31, 2020,

The overall objective of WADI project is to contribute to the reduction of losses in water transmission systems and decrease the related energy consumption required for the process. WADI aims to develop an airborne water leak detection surveillance service to provide water utilities with adequate information on leaks in water infrastructure outside urban areas, thus enabling the utility to promptl ...
Read Project

 12

 FINISHED 
TurboNoiseBB aims to deliver reliable prediction methodologies and noise reduction technologies in order to allow European Aerospace industries:• to design low-noise aircraft to meet society’s needs for more environmentally friendly air transport• to win global leadership for European aeronautics with a competitive supply chain.The project is focusing on fan broadband (BB) noise sources and will o ...
Read Project

 15

 FINISHED 

MagnetIc NOzzle thruster with elecTron cyclOtron Resonance (MINOTOR)

Start date: Jan 1, 2017, End date: Dec 31, 2019,

MINOTOR’s strategic objective is to demonstrate the feasibility of the ECRA technology as a disruptive game-changer in electric propulsion, and to prepare roadmaps paving the way for the 2nd EPIC call, in close alignment with the overall SRC-EPIC strategy.Based on electron cyclotron resonance (ECR) as the sole ionization and acceleration process, ECRA is a cathodeless thruster with magnetic nozzle ...
Read Project

 7

 FINISHED 

Stability and Sensitivity Methods for Industrial Design (SSeMID)

Start date: Jan 1, 2016, End date: Dec 31, 2019,

The increasing environmental awareness of the European society has been always present in the aeronautical community, industry and research centres, having a definite influence on the way the aircraft of the future should be. In this line, the ACARE Vision for 2020, a Group of Renowned Personalities in the aeronautical field, has formulated a clear set of requirements for civil transport aircraft ...
Read Project

 10

 FINISHED 
The AIRMES project focusses on optimising end-to-end maintenance activities within an operator’s environment. It will develop and validate an innovative, state-of-the-art, integrated maintenance service architecture that will be a key step in achieving the goal of no technically-induced aircraft operational disruptions in European air traffic. The AIRMES consortium is led by an airline / MRO that ...
Read Project

 12

 FINISHED 
ONERA, the French Aerospace Lab, and the two SMEs ATECA and Poly-Shape will combine their research and technological capabilities to propose new ideas in the domain of acoustic liners and in-duct modal detection for air conditioning systems. A modal detection tool adapted to the industrial setup will be proposed and manufactured, to assess the noise source created by the jet pumps of the air syste ...
Read Project

 3

 FINISHED 

Drag Reduction in Turbulent Boundary Layer via Flow Control (DRAGY)

Start date: Apr 1, 2016, End date: Mar 31, 2019,

The proposed project “Drag Reduction via Turbulent Boundary Layer Flow Control” (DRAGY) will approach the problem of turbulent drag reduction through the investigation of active/passive flow-control techniques to manipulate the drag produced by the flow structures in turbulent boundary layers. In addition, the project aims to improve the understanding of the underlying physics behind the control t ...
Read Project

 13

 FINISHED 
The proposed project, IMAGE, is relevant to Topic MG-1.10-2015, aiming to enhance the EU-China collaborative effort focusing on “Innovative methods and numerical technologies for airframe and engine noise reduction”. The project consortium consists of 12 partners.The purpose of IMAGE is to investigate experimentally and numerically innovative airframe and engine noise-reduction technologies and, i ...
Read Project

 13

 FINISHED 

High-Speed Experimental Fly Vehicles - International (HEXAFLY-INT)

Start date: Apr 1, 2014, End date: Mar 31, 2019,

The HEXAFLY-INT project aims to flight test an experimental vehicle above Mach 7 to verify its potential for a high aerodynamic efficiency during a free-flight while guaranteeing a large internal volume. The feasibility for a 3m long vehicle was demonstrated during the European L0 precursor project HEXAFLY. Its realization will now be enabled on an international scale underlining the need for glob ...
Read Project

 11

 FINISHED 
To enhance air transport safety, the main objective of VISION is to validate smarter technologies for aircraft Guidance, Navigation and Control (GN&C) by including 1/ vision-based systems 2/ advanced detection and resilient methods. Critical flight situations are targeted, especially during near-ground operation phases (half of 169 fatal accidents in the last decade during approach or landing). Ac ...
Read Project

 6

 FINISHED 
This three-year project is to release, validate and verify a unique computer environment (i.e. the EPICEA platform) assimilating a complete understanding of electromagnetic (EM) issues on Composite Electric Aircraft (CEA – i.e. aircraft with composite and electric technologies combined and operating at higher altitude/latitude). EM on CEA includes EM coupling, interconnects, and Cosmic Radiations ...
Read Project

 5

 FINISHED 

Future Sky Safety

Start date: Jan 1, 2015, End date: Dec 31, 2018,

The EC Flight Path 2050 vision aims to achieve the highest levels of safety to ensure that passengers and freight as well as the air transport system and its infrastructure are protected. However, trends in safety performance over the last decade indicate that the ACARE Vision 2020 safety goal of an 80% reduction of the accident rate is not being achieved. A stronger focus on safety is required. T ...
Read Project

 32

 FINISHED 
Crisis incidents result in difficult working conditions for Urban Search-and-Rescue (USaR) crews. INACHUS aims to achieve a significant time reduction and increase efficiency in USaR operations by providing:1.Simulation tools for estimating the locations of survival spaces (after a structural collapse) and identify the location of survivors for different construction types and building materials2. ...
Read Project

 21

 FINISHED 
ALTAIR’s strategic objective is to demonstrate the feasibility of a new cost effective and reliable space launch system for the access to Low-Earth Orbit (400-1000 km) of small satellites ranging from 50 to 150 kg. The ALTAIR launch system aims to be the expected answer to the needs of small satellites users, providing an affordable and adapted access to space service, without the constraints of c ...
Read Project

 8

 FINISHED 

Smart and Networking UnderWAter Robots in Cooperation Meshes (SWARMs)

Start date: Jul 1, 2015, End date: Jun 30, 2018,

Nowadays, the major part of offshore operations is done by divers in dangerous missions. Since their number is limited, the dependency on their work represents a real threat to the offshore industry. The extended use of unmanned underwater vehicles (AUVs/ROVs) could solve this problem but since they are usually tailor-made for a specific task and difficult to operate their deployment is very expen ...
Read Project

 31

 FINISHED 
AGILE targets multidisciplinary optimization using distributed analysis frameworks. The involvement of many disciplinary analyses ranging up to high levels of fidelity and agile workflow management are considered to be state-of-the-art and starting point for AGILE. Advanced optimization techniques and strategies will be developed in order to exploit available computing systems and to gain faster c ...
Read Project

 20

 FINISHED 
AFLoNext is a four year EC L2 project with the objective of proving and maturing highly promising flow control technologies for novel aircraft configurations to achieve a quantum leap in improving aircraft’s performance and thus reducing the environmental footprint. The project consortium is composed by forty European partners from fifteen countries. The work has been broken down into seven work p ...
Read Project

 41

 FINISHED 
The ability to simulate aerodynamic flows using CFD methods has progressed rapidly over the last decades and has given rise to a change in design processes in aeronautics already. But more improvement is necessary to overcome the (still) existing lack in confidence in CFD usage, based on turbulence modelling. The TILDA project will offer methods and approaches combining advanced and efficient high ...
Read Project

 12

 FINISHED 
Assigning tasks, formerly executed by human operators, to automation can increase the performance in many aspects of ATM. However, the absence of automation errors can often not be guaranteed. Consequently a human operator is required to monitor the automation and to intervene in the rare cases of automation errors. It has been shown that this monitoring role of human operators results in negative ...
Read Project

 3

 FINISHED 
Smart cyber-physical systems (CPS) are considered to be the next revolution in ICT with lots of game-changing business potential for integrated services and products.Mastering the engineering of complex and trustworthy CPS is key to implementing CPS-based business models. Current CPS, however, are often engineered and maintained at very high cost and sometimes with unknown risks, and recent techno ...
Read Project

 11

 FINISHED 
...e EUFAR sustainable legal structure. Following the Innovation Union objectives, EUFAR will invite representatives of end user industries to participate in the SAC and constitute a Technology Transfer Office to support both market pull and technology push driven innovation. Workshops will be organized like Innovation Conventions where EUFAR experts and SMEs will closely interact and develop partner ...
Read Project

 24

 FINISHED 

Hybrid Propulsion Module for transfer to GEO orbit (HYPROGEO)

Start date: Feb 1, 2015, End date: Jan 31, 2018,

Independent access to space is a key component of the European Space Policy. The competition is increasing in this area both for the full launching systems and the key subsystems. Cost-effectiveness becomes the main driving factor.HYPROGEO ambition is to study a propulsion module based on Hybrid chemical propulsion. Hybrid propulsion is not a new technology but its application to a transfer module ...
Read Project

 15

 FINISHED 
The ASPIRE proposal, gathering DLR, NLR, ONERA and TsAGI, responds to the topic JTI-CS2-2014-CFP01-AIR-01-01 “Aerodynamic and acoustic capabilities developments for close coupling, high by-pass ration turbofan Aircraft integration”. The comprehensive experience of the partners working on innovative engine aircraft integration concepts both individually and in previous collaborative efforts motivat ...
Read Project

 4

 FINISHED 
MAShES proposes a breakthrough approach to image-based laser processing closed-loop control. Firstly, a compact, snapshot, and multispectral imaging system in the VIS/MWIR spectral range will be developed. This approach will enable a multimodal process observation that combines different imaging modalities. Moreover, it will enable an accurate estimation of temperature spatially resolved and indep ...
Read Project

 11

 FINISHED 

Engine Module Validators (ENOVAL)

Start date: Oct 1, 2013, End date: Sep 30, 2017,

The ENOVAL project will provide the next step of engine technologies to achieve and surpass the ACARE 2020 goals on the way towards Flightpath 2050. ENOVAL completes the European 7th Framework Programme (FP7) roadmap of Level 2 aero engine projects. ENOVAL will focus on the low pressure system of ultra-high by-pass ratio propulsion systems (12 < BPR < 20) in conjunction with ultra high overall pre ...
Read Project

 37

 FINISHED 

Coordinating Air transport Time Efficiency Research (CATER)

Start date: Oct 1, 2013, End date: Sep 30, 2017,

Europe, through the High Level Group on Aviation Research, ACARE and the Commission, has a vision for air transport in meeting societal & market needs over the coming 30 years. Central to this is time efficiency, meaning reduced door-to-door journey times, seamless inter-modal connections and reliability. For this Europe will engage in large scale, intensive and coordinated research & innovati ...
Read Project

 10

 FINISHED 
The objective of DREAMS is to develop a cross-domain architecture and design tools for networked complex systems where application subsystems of different criticality, executing on networked multi-core chips, are supported.DREAMS will deliver architectural concepts, meta-models, virtualization technologies, model-driven development methods, tools, adaptation strategies and validation, verification ...
Read Project

 16

 FINISHED 
SUNJET II proposal responds to the H2020-MG-2014 Topic 1.8 International Cooperation in Aeronautics of the work programme. Its main objectives are:• Recommendations and guidance for future EU-Japan cooperation in the field of aviationBuilding on the SUNJET project, SUNJET II will produce consolidated roadmaps in the fields of Aircraft, Systems and Equipment, with the support of R&T institutions, A ...
Read Project

 8

 FINISHED 
The central goal of JERONIMO is the understanding of the physical mechanisms of ultrahigh bypass ratio (UHBR) engines with a bypass ratio (BPR) larger than 12 and the related installed jet noise with potential jet-wing interaction. The aim is to reduce uncertainties in jet noise characterisation of this novel installation configuration by wind tunnel tests and predictions and being able to derive ...
Read Project

 13

 FINISHED 
The proposed coordination action OPTICS will provide oversight of progress in research and innovation aiming to improve the safety and security of aviation in accordance with Flightpath 2050 challenges and goals, exploiting as far as possible the identified metrics, achievements, main topic areas and broad industry knowledge and expertise base established in the development industry's SRIA.OPTICS ...
Read Project

 10

 FINISHED 

FORUM on Aviation and Emissions (FORUM-AE)

Start date: Jul 1, 2013, End date: Jun 30, 2017,

The FORUM-AE coordination action will create a technical specialists european network with all relevant competencies, including academic and industrial partners, linked to key environmental technical issues on aviation emissions.It will address equitably three complementary aspects: environmental impacts (air quality and climate change), technical and technological mitigation solutions (aircraft, ...
Read Project

 13

 FINISHED 

Low Emissions Core-Engine Technologies (LEMCOTEC)

Start date: Oct 1, 2011, End date: Jun 30, 2017,

The main objective of the LEMCOTEC project will be the improvement of core-engine thermal efficiency by increasing the overall pressure ratio (OPR) to up to 70 leading to a further reduction of CO2. Since NOx increases with OPR, combustion technologies have to be further developed, at the same time, to at least compensate for this effect. The project will attain and exceed the ACARE targets for 20 ...
Read Project

 39

 FINISHED 
Over the last ten years the number of satellites on orbit has grown significantly to more than 1000. We also depend on satellites more than ever for applications such as TV, internet, mobile phones, navigation, banking and finance. All these satellites must be designed to withstand the harsh radiation in space for up to 15 years or more. Space weather events can increase radiation levels by fiv ...
Read Project

 5

 FINISHED 
Icing conditions are one of the most severe for aircraft and engines as experienced in the certification process and in-service events. Certification tests are never simple because icing phenomena is a very complex domain and designers have access to a very low level of prediction capability compare to other fields, mainly relying on a very fragmented knowledge based on empirical past experience. ...
Read Project

 15

 FINISHED 
The purpose of COBRA is to use technology breakthroughs to overcome the insufficient noise performance of the counter-rotating fan tested in VITAL FP6 Program. This will be achieved through exploring higher by-pass ratio (15-25) resulting in much lower blade tip speed and blades count. The designs shall comply also with higher or equal aerodynamic efficiency compare to the VITAL ouputs.COBRA is s ...
Read Project

 9

 FINISHED 
BUTERFLI is a project in response to the invitation to tender from European Commission FP7 within Call FP7-AAT-2013 RTD-Russia.BUTERFLI is the acronym of BUffet and Transition delay control investigated within Europe-Russia cooperation for improved FLIght performances. The Project Topic will focus on experimental and numerical flow control investigations of different phenomena: the buffet on a lam ...
Read Project

 13

 FINISHED 

Engine Breakthrough Components and Subsystems (E-BREAK)

Start date: Oct 1, 2012, End date: Mar 31, 2017,

Future aero engines will need to be more efficient and contribute to the reduction on environmental impact of air transportation. They must reach some standards of performance by reducing emissions and creating some savings on operation costs.EIMG consortium has launched since several years some initiatives to develop future engines in the frame of the European Committee research programmes.Within ...
Read Project

 48