Search for European Projects

23 European Projects Found

Searched on 125080 European Projects

 FINISHED 

Internet of Food and Farm 2020 (IoF2020)

Start date: Jan 1, 2017, End date: Dec 31, 2020,

The IoF2020 project is dedicated to accelerate adoption of IoT for securing sufficient, safe and healthy food and to strengthen competitiveness of farming and food chains in Europe.It will consolidate Europe’s leading position in the global IoT industry by fostering a symbiotic ecosystem of farmers, food industry, technology providers and research institutes.The IoF2020 consortium of 73 partners, ...
Read Project

 72

 FINISHED 
The project targets the incorporation of advanced functional materials to deliver customised conductive inks and flexible adhesives compatible with high volume manufacturing platforms. Specifically the development of these enabling materials will support high speed roll to roll integration of hybrid and large area electronics to address internet of things opportunities.The consortium will integra ...
Read Project

 14

 FINISHED 
The goal of this ETN is to develop advanced cryptographic techniques for the Internet of Things and the Cloud and to create implementations that offer a high level of security and increased usability, for a wide range of physical computation platforms. The ITN will equip a group of 15 early stage researchers with a set of interdisciplinary skills combining mathematics, computer science and electri ...
Read Project

 8

 FINISHED 

Post-quantum cryptography for long-term security (PQCRYPTO)

Start date: Mar 1, 2015, End date: Feb 28, 2018,

Online banking, e-commerce, telemedicine, mobile communication, and cloud computing depend fundamentally on the security of the underlying cryptographic algorithms. Public-key algorithms are particularly crucial since they provide digital signatures and establish secure communication without requiring in-person meetings.Essentially all applications today are based on RSA or on the discrete-logarit ...
Read Project

 13

 FINISHED 

THINGS2DO (THINGS2D0)

Start date: Jan 1, 2014, End date: Jan 1, 2018,

Develop the FDSOI ecosystem in Europe, beyond the PLACES2BE Pilot Line, in order to increase the impact of this European technology. At the time of set up of the first KET pilot line the proof of FDSOI was mainly technological. In between then and now, the first realization of a complex silicon chip in FDSOI has shown to the worldwide microelectronics community the capabilities of this technology. ...
Read Project

 44

 FINISHED 

Homomorphic Encryption Applications and Technology (HEAT)

Start date: Jan 1, 2015, End date: Dec 31, 2017,

...rs on homomorphic cryptography (KU LEUVEN, UNIVBRIS and UL), with the leading expertise on lattice based cryptanalysis (UPMC), and three industrial partners with existing interests in the field (CRX, NXP and Thales UK). The goal of HEAT is to produce a step change in the efficiency and applicability of this technology. The proposal leverages existing ground breaking research in Europe, and links t ...
Read Project

 7

 FINISHED 
During our life’s, both privately and professionally, we exposed to a multitude of hazardous situations. And most of the time we are not (timely) aware of the dangerous situation. One of these silent killers is definitely carbon monoxide poisoning. There is a direct societal need for home and building automation (HABA) systems equipped with ultra-sensitive, reliable gas sensors (for hazardous gase ...
Read Project

 21

 FINISHED 

Photonic Libraries And Technology for Manufacturing (PLAT4M)

Start date: Oct 1, 2012, End date: Mar 31, 2017,

Description "PLAT4M will make silicon photonics ready for transition to industry"Silicon is now a mature integration platform that has brought CMOS microelectronics to mass-market application. The PLAT4M vision is that silicon photonics will lead to a similar revolution in the photonics sector.Over the past years silicon photonics has see ...
Read Project

 18

 FINISHED 

Dependable Embedded Wireless Infrastructure (DEWI)

Start date: Mar 1, 2014, End date: Feb 28, 2017,

DEWI (dependable embedded wireless infrastructure) envisions to significantly foster Europe’s leading position in embedded wireless systems and smart (mobile) environments such as vehicles, railway cars, airplanes and buildings. These environments comprise wireless sensor networks and wireless applications for citizens and professional users. Therefore the consortium introduces the concept of a “s ...
Read Project

 61

 FINISHED 
"The DREAMS Initial Training Network will investigate the problem of modeling, controlling, removing, and synthesizing acoustic reverberation with the aim of enhancing the quality and intelligibility of audio, music, and speech signals. The proposed research and training program builds upon four disciplines that are equally important in understanding and tackling the (de-)reverberation problem: ro ...
Read Project

 11

 FINISHED 

Nanoelectronic COupled Problems Solutions (nanoCOPS)

Start date: Nov 1, 2013, End date: Oct 31, 2016,

Designs in nanoelectronics often lead to problems that are large to simulate and that include strong feedback couplings. Industry demands to include variability to guarantee quality and yield. It also requests to incorporate higher abstraction levels to allow for system simulation in order to shorten design cycles, while preserving accuracy. The nanoCOPS project considers the simulation of two pro ...
Read Project

 13

 FINISHED 

Energy Efficient Converters using GaN Power Devices (E2COGAN)

Start date: Apr 1, 2013, End date: Mar 31, 2016,

The E2COGaN project will target the demonstration of GaN-on-Si as a disruptive power device technology platform through the whole value chain up to demonstrators with high industrial, societal and environmental relevance. Its innovative character will be proven through a well-balanced and application specific trade-off between the “corner” benefits given by higher efficiency, higher switching freq ...
Read Project

 25

 FINISHED 

Intelligent light management for OLED on foil applications (IMOLA)

Start date: Oct 1, 2011, End date: Mar 31, 2015,

The main objective of the IMOLA project is the realization of a large-area OLED-based lighting module with built-in intelligent light management. Interesting applications are wall, ceiling and car dome lighting, where the light intensity can be adjusted uniformly or locally according to the time of the day or the position of a person, or even road lighting, where the light can follow a car.The fro ...
Read Project

 11

 FINISHED 

Internet of Energy for Electric Mobility (IoE)

Start date: May 1, 2011, End date: Oct 31, 2014,

The objective of Internet of Energy (IoE) is to develop hardware, software and middleware for seamless, secure connectivity and interoperability achieved by connecting the Internet with the energy grids. The application of the IoE will be the infrastructure for the electric mobility. The underlying architecture is of distributed Embedded Systems (ESs), combining power electronics, integrated circu ...
Read Project

 43

 FINISHED 
This project aims at developing architecture and technologies for implementing agile radio frequency (RF) transceiver capacities in future radio communication products. These new architecture and technologies will be able to manage multi-standard (multi-band, multi-data-rate, and multi-waveform) operation with high modularity, low-power consumption, high reliability, high integration, low costs, l ...
Read Project

 41

 FINISHED 

TAMper Resistant Sensor node (TAMPRES)

Start date: Oct 1, 2010, End date: Dec 31, 2013,

...secure low level services.The range of protection mechanisms available will be evaluated by experiments with existing and recently manufactured ASICs. To ensure manufacturer independence, both the NXP and the IHP technology will be used to evaluate the results. TAMPRES will also integrate its findings in a methodology which supports system designers to select the correct means to protect their new ...
Read Project

 8

 FINISHED 

Internet of Things Architecture (IoT-A)

Start date: Sep 1, 2010, End date: Nov 30, 2013,

Description The Lighthouse Project IoT-A proposes the creation of an architectural reference model for the IoT as well as the definition of a set of key building blocks to lay the foundation for a ubiquitous IoT.There has been much hype about the “Internet of Things”. The idea of a globally interconnected continuum of devices, objects and ...
Read Project

 20

 FINISHED 
"The objective of POLLUX is to develop a distributed real time embedded systems platform for next generation electric vehicles, by using a component and programming-based design methodology. Reference designs and embedded systems architectures for high efficiency innovative mechatronics systems will be addressed with regard to requirements on composability, networking, security, robustness, diagno ...
Read Project

 37

 FINISHED 
The main objective of the COMPLEX project is to increase the competitiveness of the European semiconductor, system integrator and EDA industry by addressing the problem of platform-based design space exploration under consideration of power and performance constraints early in the design process. High performance usually causes high power consumption. A main challenge in today's embedded system de ...
Read Project

 15

 FINISHED 
The main objective of the ENIAC JU project CAJAL4EU is to develop miniaturised biosensor technology platforms enabling diagnostic test manufacturers to build multi-parameter in-vitro test applications rapidly in a robust, user-friendly and cost-effective way. They will involve nanoelectronic-based transducers with chemical sensing capabilities providing the interface with the clinical samples. In ...
Read Project

 28

 FINISHED 
"In the next ten years, traffic by passenger cars is expected to grow by 30% while goods traffic is expected to go up by 60%. During the same time ambitious targets have been formulated in terms of safety, congestion and protection of the environment. To accommodate this, the deployment of Intelligent Transport Systems (ITS), or the use of ICT infrastructure to complement road infrastructure and r ...
Read Project

 15

 FINISHED 

Dual-channel CMOS for (sub)-22 nm high performance logic (DUALLOGIC)

Start date: Dec 1, 2007, End date: May 31, 2011,

We propose to develop for the first time a dual-channel CMOS technology comprising high channel mobility (high-µ) Ge pMOS and III-V compound semiconductor nMOS transistors co-integrated on the same complex engineered substrate on Si. This offers a high performance booster as an option for the 22 nm technology creating competitive advantage for the European nanoelectronics industry. In addition, hi ...
Read Project

 9

 FINISHED 

Open Media Platform (OMP)

Start date: Jan 1, 2008, End date: Dec 31, 2009,

Supporting the next generation of content-rich networked services on mobile devices is presenting major technical challenges for Europe's semiconductor and Consumer Electronics industries. Unlike the standard PC architecture, these devices have huge variation in multimedia capability and must operate under widely varying network conditions. Software complexity growth on these devices is now outpac ...
Read Project

 8