Search for European Projects

24 European Projects Found

Searched on 125080 European Projects

 FINISHED 

Lightweight Verification of Software (LiveSoft)

Start date: Jul 1, 2014, End date: Jun 30, 2019,

As illustrated through the advent of cloud computing, cyberphysical systems, or the Internet of Things, more and more applications are inherently distributed. At the same time, programming distributed systems is notoriously hard. Programmers have to deal with asynchrony and have to cater for partial failures -- the possibility that certain communication(s), processes, or hosts fail while others re ...
Read Project

 2

 FINISHED 
StratoClim will produce more reliable projections of climate change and stratospheric ozone by a better understanding and improved representation of key processes in the Upper Troposphere and Stratosphere (UTS). This will be achieved by an integrated approach bridging observations from dedicated field activities, process modelling on all scales, and global modelling with a suite of chemistry clima ...
Read Project

 30

 FINISHED 

Visual Learning and Inference in Joint Scene Models (VISLIM)

Start date: Jun 1, 2013, End date: May 31, 2018,

"One of the principal difficulties in processing, analyzing, and interpreting digital images is that many attributes of visual scenes relate in complex manners. Despite that, the vast majority of today's top-performing computer vision approaches estimate a particular attribute (e.g., motion, scene segmentation, restored image, object presence, etc.) in isolation; other pertinent attributes are eit ...
Read Project

 2

 FINISHED 

Programming Abstractions for Applications in Cloud Environments (PACE)

Start date: Mar 1, 2013, End date: Feb 28, 2018,

"Cloud computing is changing our perception of computing: The Internet is becoming the computer and the software: (a) vast data centers and computing power are available via the Internet (infrastructure as a service), (b) software is available via the Internet as a service (software as a service). Building on the promise of unlimited processing/storage power, applications today process big amounts ...
Read Project

 2

 FINISHED 
"The global chemical industry is transitioning from petrochemical production processes to bio-based production processes. This transition creates a clear market need for technologies that reduce the development time and cost of cell factories. PROMYS will develop, validate and implement a novel synthetic biology platform technology termed ligand responsive regulation and selection systems. Ligand ...
Read Project

 8

 FINISHED 

Integrated Methods for Advanced Geothermal Exploration (IMAGE)

Start date: Nov 1, 2013, End date: Oct 31, 2017,

"The IMAGE project will develop a reliable science based exploration and assessment method to ""IMAGE"" geothermal reservoirs using an interdisciplinary approach based on three general pillars:1 Understanding the processes and properties that control the spatial distribution of critical exploration parameters at European to local scales. The focus will be on prediction of temperatures, in-situ str ...
Read Project

 22

 FINISHED 
Accurate flow measurement has become increasingly important for many key industrial sectors including oil and gas, aerospace, automotive, chemical and pharmaceutical process industries, as well as various military and government operations. While ultrasonic flow measurement offer numerous advantages, there remain many challenges that need to be overcome while making ultrasonic flow measurement bot ...
Read Project

 7

 FINISHED 

Semi-Autonomous 3rd Hand (3rd HAND)

Start date: Oct 1, 2013, End date: Sep 30, 2017,

Robots have been essential for keeping industrial manufacturing in Europe. Most factories have large numbers of robots in a fixed setup and few programs that produce the exact same product hundreds of thousands times. The only common interaction between the robot and the human worker has become the so-called "emergency stop button". As a result, re-programming robots for new or personalized produc ...
Read Project

 4

 FINISHED 

The strong interaction at neutron-rich extremes (STRONGINT)

Start date: Sep 1, 2012, End date: Aug 31, 2017,

"""The strong interaction at neutron-rich extremes"" (STRONGINT) will investigate the structure of matter at the neutron-rich frontier in the laboratory and in the cosmos based on chiral effective field theory (EFT) interactions. Chiral EFT opens up a systematic path to investigate many-body forces and provides unique constraints for three-neutron and four-neutron interactions. We will for the fir ...
Read Project

 2

 FINISHED 
Calcium Carbonate Looping (CCL) is a promising long-term technology for low-cost post combustion CO2 capture for fossil fuels using limestone based solid sorbents. It combines the advantages of a small efficiency penalty of 5 to 7 % points and a low CO2 capture cost compared to competing technologies currently under development. First tests performed on the 1 MWth scale have confirmed the feasibil ...
Read Project

 11

 FINISHED 
"Intrinsic (or residual) stresses, resulting from manufacturing or processing steps, mostly define the performance and limit the lifetime of nanostructured materials, thin films, coatings and MEMS devices.The established techniques for micron-scale measurement of residual stress still have strong limitations, e.g. in terms of spatial resolution, lack of depth sensing, their applicability on non-cr ...
Read Project

 16

 FINISHED 

Tactile Manipulation (TACMAN)

Start date: Jan 1, 2014, End date: Dec 31, 2016,

TACMAN addresses the key problem of developing an information processing and control technology enabling robot hands to exploit tactile sensitivity and thus become as dexterous as human hands. The current availability of the required technology now allows us to considerably advance in-hand manipulation. TACMAN's goal is to develop fundamentally new approaches which can replace manual labor under i ...
Read Project

 5

 FINISHED 
The project is aimed at an increase of power density (kW per kg) of a three-phase inverter for aerospace application (power range 10 … 50 kW) of at least 10% with a concomitant compliance with RTCA DO-160, chapter 21 CMC limits.The increase in power density will be achieved by implementing an innovative topology based upon:• Transition of the H5 or HERIC topology from single phase to a three phase ...
Read Project

 2

 FINISHED 
Flexible spectrum usage is a promising enabler of spectral efficiency for next generation wireless broadband networks. In order to deliver the next order of magnitude gains in terms of overall spectral and radio efficiency envisioned for 2020, wireless access will have to be revisited both from a policy as well as from a technology innovation perspective. On the policy side, with the emergence of ...
Read Project

 8

 FINISHED 
Southern Europe and the Mediterranean region are facing the challenge of managing its water resources under conditions of increasing scarcity and concerns about water quality. Already, the availability of fresh water in sufficient quality and quantity is one of the major factors limiting socio economic development. Innovative water management strategies such as the storage of reclaimed water or ex ...
Read Project

 23

 FINISHED 
As a result of the shift towards a bio-based economy, the demand of fibres from previously non-forest sectors (such as the energy sector) has increased. This has had a significant impact on the paper and board industry and the prices and demand of the recycled fibre based raw materials have started to increase. The pulp and paper industry has to improve the resource efficiency of the current paper ...
Read Project

 12

 FINISHED 
Videogames are one of the most relevant creative industries in Europe - encompassing almost 100,000 individuals – with countries like UK, France and Finland representing the excellence in game development internationally. The market is very interesting, but very competitive too, with an increasing demand of games that are bigger, better and with more realistic computer graphics.Such qualitative a ...
Read Project

 7

 FINISHED 

Nanoelectronic COupled Problems Solutions (nanoCOPS)

Start date: Nov 1, 2013, End date: Oct 31, 2016,

Designs in nanoelectronics often lead to problems that are large to simulate and that include strong feedback couplings. Industry demands to include variability to guarantee quality and yield. It also requests to incorporate higher abstraction levels to allow for system simulation in order to shorten design cycles, while preserving accuracy. The nanoCOPS project considers the simulation of two pro ...
Read Project

 13

 FINISHED 

Engineering Virtualized Services (ENVISAGE)

Start date: Oct 1, 2013, End date: Sep 30, 2016,

Software services are virtualized if they can adapt to the elasticity of cloud computing. To foster the industrial adoption of virtualized services, it is necessary to address two important problems: (1) the efficient analysis, dynamic composition and deployment of services with qualitative and quantitative service levels and (2) the dynamic control of resources such as storage and processing capa ...
Read Project

 8

 FINISHED 
Description ALFRED’s objective is to develop a mobile, personalized assistant for elderly people, which helps them stay independent, coordinate with carers and foster their social contacts. ALFRED is a mobile, personalized Butler, created using cutting edge technologies such as advanced speech interaction, so you can talk directly to him. AL ...
Read Project

 15

 FINISHED 
In recent years, traditional processors have not been able to translate the advances of silicon fabrication technology into corresponding performance gains. This has been due to weaknesses inherent in the current sequential programming model, which has not changed significantly since the late 1940's, as well as due to physical constraints, such as practical limits on the energy consumption and the ...
Read Project

 9

 FINISHED 

Dynamic Signal Transduction in Individual Cells (DYNASTIIC)

Start date: Aug 1, 2012, End date: Jul 31, 2016,

Regulation of proliferation and differentiation is a fundamental challenge for multicellular organisms. The decision between alternative cell fates is therefore tightly controlled by cellular signaling. During the past decades, the central components of the signaling machinery have been identified. The challenge we are facing now is to understand how signaling networks act dynamically in living ce ...
Read Project

 2

 FINISHED 
The main goal of chemistry and material science is to create structures, which in turn exhibit specificfunctions. One class of functional molecules are catalysts. Although homogeneous catalysts are widely usedin synthetic chemistry, there is very limited knowledge about the relationship between their activity and theirstructure and especially dynamics in solution.Based on a first investigation, in ...
Read Project

 2

 FINISHED 

Near-Wall Simulations and Measurements in Lean-Burn Engines (NEWSMILE)

Start date: Oct 1, 2014, End date: Mar 31, 2016,

"In modern aero-engine combustors combustor tiles are used to protect the walls from the hot gases, the temperature of which is rising in new engines due to increasing pressure ratios. However, the amount of air used for wall cooling should be reduced to allow for maximal air flow rates through the fuel injector. This measure enables optimised lean combustion with lowest pollutant emission rates. ...
Read Project

 4