Search for European Projects

Over 40 European Projects Found

Searched on 125080 European Projects

 FINISHED 

Quantum fields and knot homologies (FIELDS-KNOTS)

Start date: Dec 1, 2013, End date: Nov 30, 2018,

This project is concerned with fundamental problems arising at the interface of quantum field theory, knot theory, and the theory of random matrices. The main aim of the project is to understand two of the most profound phenomena in physics and mathematics, namely quantization and categorification, and to establish an explicit and rigorous framework where they come into play in an interrelated fas ...
Read Project

 4

 FINISHED 
Concentrating Solar Thermal Energy encompasses Solar Thermal Electricity (STE), Solar Fuels, Solar Process Heat and Solar Desalination that are called to play a major role in attaining energy sustainability in our modern societies due to their unique features: 1) Solar energy offers the highest renewable energy potential to our planet; 2) STE can provide dispatchable power in a technically and eco ...
Read Project

 42

 FINISHED 
The AQUAVALENS consortium has brought together SMEs, Industries, Universities and Research Institutes with the mission of protecting the health of European Citizens from contaminated drinking water and water used in food processing. We will achieve this by developing sustainable technologies to enable water system managers whether in large or small water systems or within food growers or manufactu ...
Read Project

 43

 FINISHED 
KnowHY aims to provide the FC&H2 sector with a training offer for technicians and workers featuring quality in contents, accessibility in format and language, practicality for the targeted audience, ease of scalability and update, and at competitive costs which make the training offer economically sustainable after project completion. Thanks to this project both OEMs as well as professionals can r ...
Read Project

 13

 FINISHED 
Sediment transport in the fluvial, estuarine and coastal environment causes significant morphological changes and results in the amplification of floods, storm surges and other inundation hazards. This increases considerably the risk of failure of structures, disruption of function of networks (water, energy), destruction of ecosystems and natural resources, as well as property and human loss. The ...
Read Project

 10

 FINISHED 

OceaNET

Start date: Sep 1, 2013, End date: Aug 31, 2017,

OceaNET concerns floating offshore wind and wave energy. These two areas are well aligned with the European Energy Strategic Plan and the Horizon 2020 programme.It aims at contributing to develop specific technologies and enabling technologies common to both energy sources. The research activities are structured in a number of research projects, which will provide the opportunity for a set of youn ...
Read Project

 10

 FINISHED 
The main objective of GUIDEnano is to develop innovative methodologies to evaluate and manage human and environmental health risks of nano-enabled products, considering the whole product life cycle. A strategy to identify hot spots for release of nanomaterials (NMs) will be followed by decision trees to guide on the use of (computational) exposure models and, when necessary, design of cost-effecti ...
Read Project

 34

 FINISHED 

European Archival Records and Knowledge Preservation (E-ARK)

Start date: Feb 1, 2014, End date: Jan 31, 2017,

The goal of the E-ARK Project is to pilot archival services to keep records authentic and usable based on current best-practices. These will address the three main endeavours of an archive – acquiring, preserving and enabling re-use of information. E-ARK will demonstrate the potential benefits for public administrations, public agencies, public services, citizens and business by providing easy and ...
Read Project

 16

 FINISHED 
SPRITE is a multi-disciplinary European training network which brings together Europe’s premier research institutes in technology and applications of ion beams. Those involved are already actively collaborating, for example in the recently very favourably reviewed EC Infrastructure project SPIRIT.SPRITE addresses the urgent European need - identified in a recent Foresight Review - to train the ne ...
Read Project

 13

 FINISHED 

Brazilian-European partnership in Dynamical Systems (BREUDS)

Start date: Jan 1, 2013, End date: Dec 31, 2016,

"This is a project for a partnership between leading Brazilian and European research groups in dynamical systems, a prominent subject in mathematics. An extensive consortium of European and Brazilian institutions will collaborate to provide world leading critical mass and support for research on the very forefront of the field. Work Packages reflect parallel priorities in the research. Transfer o ...
Read Project

 22

 FINISHED 

Cognitive autonomous diving buddy (CADDY)

Start date: Jan 1, 2014, End date: Dec 31, 2016,

Divers operate in harsh and poorly monitored environments in which the slightest unexpected disturbance, technical malfunction, or lack of attention can have catastrophic consequences. They manoeuvre in complex 3D environments, carry cumbersome equipment, while performing their mission. To overcome these problems, CADDY aims to establish an innovative set-up between a diver and companion autonomou ...
Read Project

 7

 FINISHED 
"The European Open Data Strategy establishes important new principles that ensure that European public sector data will be released at no cost (or marginal cost), in machine-readable, commonly-understood formats, and with liberal licenses enabling wide reuse. These data encompass both scientific data about the environment (from Earth Observation and other fields) and other public sector informati ...
Read Project

 18

 FINISHED 
Even though composite materials are more and more used in modern airframes, many significant improvements are still achievable. Firstly, the substitution of the assembly of many small composite parts by a single one-shot large part provides additional weight reduction. Secondly, the final assembly line process must be adapted to composite properties (lack of ductility, stiffness). Thirdly, if the ...
Read Project

 60

 FINISHED 
The objective of the FIGARO project is to significantly reduce the use of fresh water on farm level through developing a cost-effective, precision irrigation management platform. The platform will be structured for data acquisition from monitoring devices and forecasting tools, data interpretation, system control, and evaluation mechanisms enabling full decision support for end users at farm scale ...
Read Project

 18

 FINISHED 
"In line with the Lisbon strategy and 2020 perspective “Petrus” initiative coordinates since 2005 universities, WMOs, training organisations and research institutes efforts to develop cooperative approach to education and training (E&T) in the geological disposal with the purpose of expanding this cooperation under PETRUS3.PETRUS3 project aims at continuation of the European Cooperation in this ar ...
Read Project

 20

 FINISHED 
What is the origin of cosmic rays, what are the dominant acceleration mechanisms in relativistic shocks, how do cosmic rays self-consistently influence the shock dynamics, how are relativistic collisionless shocks formed are longstanding scientific questions, closely tied to extreme plasma physics processes, and where a close interplay between the micro-instabilities and the global dynamics is cri ...
Read Project

 1

 FINISHED 
Dorothy Project is targeted to develop the potential of innovation and research in the four Regions Tuscany (Italy),Valencia (Spain),Lisbon and Tagus (Portugal) and Oltenia (Romania) composing the Consortium in the field of Urban Logistics, one of the main focus of attention of the Flagship Initiative. In fact UL could reach 40% of the total cost of transportation and has great relevancy for ener ...
Read Project

 26

 FINISHED 

Future Of Surface Transport Research Rail (FOSTER RAIL)

Start date: May 1, 2013, End date: Apr 30, 2016,

FOSTER RAIL addresses the broad support challenges of SST.2013.6-1. Strengthening the research and innovation strategies of the transport industries in Europe. This Research action is a Level 1 Coordination and Support Action aiming at supporting the land transport European Technology Platforms activities.This action will assist ERRAC and the other transport-related European technology platforms ( ...
Read Project

 20

 FINISHED 
Proposal Full title: Biomimetic Approaches of Natural Functional Surfaces with hierarchical micro & nano structure and the extreme Wettability (Acronym: BioApproNFS Wett)Abstract:In the natural world, plants and animals have evolved over time to best adapt to the environment. They interact very effectively with the surrounding environment by exchanging energies and mass flow across their cuticles ...
Read Project

 6

 FINISHED 

Multi-Robot Cognitive Systems Operating in Hospitals (MOnarCH)

Start date: Feb 1, 2013, End date: Mar 31, 2016,

Description MOnarCH targets the development of a novel framework to model mixed human-robot societies, and its demonstration using a network of heterogeneous robots and sensors, in the pediatric area of an oncological hospital. It will handle uncertainties introduced by people and robots, generate natural interactions and engage in edutainme ...
Read Project

 9

 FINISHED 

The SAfer FUEL system (SAFUEL)

Start date: Sep 1, 2012, End date: Feb 29, 2016,

"Fuel Systems (FS) are critical for aircraft safety. Fire, ice and system failures are typical safety hazards associated to FS. FS accidents, though only representing 2% of accidents/incidents, continue to be a recurrent concern, especially as: the complexity of FS escalades to cope with increasing needs, including more stringent safety requirements ; flight conditions evolve with new routes at hi ...
Read Project

 13

 FINISHED 
Description The MORPH project advances the novel concept of an underwater robotic system composed of a number of spatially separated mobile robot-modules, carrying distinct and yet complementary resources. Instead of being physically coupled, the modules are connected via virtual links that rely on the flow of information among them. Without ...
Read Project

 11

 FINISHED 
Eight Transmission System Operators (BE, CZ, FR, DE, IT, PT, CH, PL) and ENTSO-E, together with 4 associations of technology manufacturers, and 16 RTD performers propose a 3-year R&D project to develop and to apply a methodology for the long-term development of the Pan-European transmission network. The project aims at delivering a top-down methodology to support the planning from 2020 to 2050. F ...
Read Project

 28

 FINISHED 
LASERLAB-EUROPE III is the European Consortium of major Laser Research Infrastructures, forming a FP7 Integrated Infrastructure Initiative. Geographically it covers the majority of European member states, following recent efforts to include partners from all over Europe 27. Scientifically, it covers many areas of laser science and applications with particular emphasis on short-pulses and high-inte ...
Read Project

 26

 FINISHED 

Aviation Noise Research Network and Coordination (X-NOISE EV)

Start date: Dec 1, 2010, End date: Nov 30, 2015,

The X-NOISE EV Coordination Action, through its network structure and comprehensive workplan involving experts groups, scientific workshops, international cooperation seminars and a common information system, addresses the noise challenges faced by Aviation. To this end, it will more specifically:- Evaluate EU-funded projects results and assess their contribution to the state-of-the-art.- Formulat ...
Read Project

 28

 FINISHED 

Sea For Society (SFS)

Start date: Jun 1, 2012, End date: Nov 30, 2015,

Sea for Society (SFS) has brought together a multidisciplinary partnership of 21 partners from 11 countries representing marine research institutes, funding agencies, science museums and aquaria, CSO’s, NGO’s, higher education institutes, business networks, to implement a MMLAP to address Specific Challenge 3: Marine Resources, inland activities & sustainable development. SFS will mobilise researc ...
Read Project

 21

 FINISHED 

Sentinels Synergy Framework (SenSyF)

Start date: Nov 1, 2012, End date: Oct 31, 2015,

The SenSyF project proposes a complete system for fully automated data acquisition and processing. This project will allow for the development and testing of new processing chains and methods for Sentinel and GMES contributing mission data on a continuous basis, and the delivery of higher-level products and services complementing the information provided by the (pre-)operational services.This syst ...
Read Project

 9

 FINISHED 
The overall scope of the DAPhNE project is to develop and demonstrate a package of integrated solutions for energy intensive processes (ceramics, cement and glass), based on tuning micro-wave technologies to the material characteristics and on intelligent control systems, to provide real time information about the energy consumption as well as the product quality.Microwave heating is now a well e ...
Read Project

 18

 FINISHED 
"Decentralized hydrogen production at refuelling stations has great potential to accelerate market introduction of hydrogen-powered vehicles. Based on the outcome of the previous NEMESIS project under FP6 the overall objective of the proposed NEMESIS 2+ project is the development of a small-scale hydrogen generation prototype capable of producing 50 standard cubic metres of hydrogen per hour from ...
Read Project

 7

 FINISHED 

Governments ENabled with IPv6 (GEN6)

Start date: Jan 1, 2012, End date: May 31, 2015,

The pilot GEN6 will have 4 different national experiments (also called pilots), some of them replicated in a complementary way in different countries, considering different existing approaches with IPv4:1.\tIPv6 upgrade of eGovernment Network Infrastructures, e-Identification, Services and Applications (Germany, Spain, Netherlands and Turkey).2.\tIPv6 upgrade of Secure Cloud Services (Luxembourg). ...
Read Project

 20

 FINISHED 

Transitions to the Urban Water Services of Tomorrow (TRUST)

Start date: May 1, 2011, End date: Apr 30, 2015,

The European project initiative TRUST will produce knowledge and guidance to support TRansitions to Urban Water Services of Tomorrow, enabling communities to achieve sustainable, low-carbon water futures without compromising service quality. We deliver this ambition through close collaboration with problem owners in ten participating pilot city regions under changing and challenging conditions in ...
Read Project

 33

 FINISHED 
The aim of the NOVEMOR (NOvel Air VEhicle Configurations: From Fluttering Wings to MORphing Flight) research project is to investigate novel air vehicle configurations with new lifting concepts and morphing wing solutions to enable cost-effective air transportation. A multidisciplinary analysis and design optimization environment developed in an earlier EU Project (SIMSAC) will be used and improve ...
Read Project

 9

 FINISHED 

Strategies and tools for Real Time EArthquake RisK ReducTion (REAKT)

Start date: Sep 1, 2011, End date: Dec 31, 2014,

Earthquakes are a serious threat for many European countries, particularly those around the Mediterranean Sea. In many cities exposed to high earthquake hazard, a substantial proportion of the population still lives in buildings that do not meet modern earthquake-resistant standards. Preventive actions, such as retrofitting of structures, are essential, but they are not sufficient and cannot be a ...
Read Project

 23

 FINISHED 

Study of Strongly Interacting Matter (HADRONPHYSICS3)

Start date: Jan 1, 2012, End date: Dec 31, 2014,

The Project promotes the access to five European Research Infrastructures, and it is structured into nine Networking Activities, plus the Management of the Consortium, and fourteen Joint Research Activities.The Project will profit of the success of the previous HadronPhysics project in FP6 and the current HadronPhysics2 in FP7, and originates from the initiative of more than 2.500 European scienti ...
Read Project

 52

 FINISHED 

European Plate Observing System (EPOS)

Start date: Nov 1, 2010, End date: Oct 31, 2014,

To understand the complex Earth System requires an integrated observational strategy and infrastructure to record key diagnostic features of its dynamics. Accordingly, this infrastructure must include geographically distributed and multidisciplinary monitoring instruments and observations. The European Plate Observing System (EPOS) will meet this challenge. The proposed RI (EPOS) will create a sin ...
Read Project

 23

 FINISHED 
The overall objective of the FC-DISTRICT project is to optimize and implement an innovative energy production and distribution concept for sustainable and energy efficient refurbished and/or new “energy autonomous” districts exploiting decentralized co-generation coupled with optimized building and district heat storage and distribution network. The concept is based on dynamic heat exchange betwee ...
Read Project

 23

 FINISHED 

PRACE - Second Implementation Phase Project (PRACE-2IP)

Start date: Sep 1, 2011, End date: Aug 31, 2014,

PRACE-2IP supports the accelerated implementation of the pan-European HPC Research Infrastructure created in April 2010 as the result of the preparatory phase PRACE project. It complements and extends the work of the PRACE-1IP project that was started in July 2010.PRACE-2IP addresses the computational and simulation needs of European scientific communities to keep them at the forefront of discover ...
Read Project

 50

 FINISHED 
The main objective of the proposal is to find new ways to increase substantially the critical temperature of a superconductor, determine the experimental feasibility of the theoretical predictions and, in collaboration with experimentalists, find the experimental setting with an optimal enhancement of superconductivity. In order to pursue this goal we investigate: (1) finite size effects in diffe ...
Read Project

 1

 FINISHED 
"Urban areas represent particular challenges for freight transport, both in terms of logistical performance and environmental impact. A range of regulatory, technological and logistical measures have been applied, most of them suffering from a lack of systematic evaluation and assessment related to their short and long term effects which impedes knowledge transfer and the adoption of best practice ...
Read Project

 17

 FINISHED 
The project aims to develop a new cost-competitive and environmentally friendly bionanocomposite material based on the combination of a polyhydroxybutyrate (PHB) matrix with new chemical, structure produced by new fermentation culture technology with two types of nanofibres,cellulose whiskers and lignin-based, in order to have a true alternative to engineering materials in two main sectors: househ ...
Read Project

 15