Search for European Projects

21 European Projects Found

Searched on 125080 European Projects

 FINISHED 

MEthane activation via integrated MEmbrane REactors (MEMERE)

Start date: Oct 1, 2015, End date: Sep 30, 2019,

The key objective of the MEMERE project is the design, scale-up and validation of a novel membrane reactor for the direct conversion of methane into C2H4 with integrated air separation. The focus of the project will be on the air separation through novel MIEC membranes integrated within a reactor operated at high temperature for OCM allowing integration of different process steps in a single multi ...
Read Project

 11

 FINISHED 
In the frame of previous FP6 and FP7 projects with involvement of IZADI-NANO2INDUSTRY consortium members nanotechnologies have demonstrated their effectiveness for enhancing materials and manufacturing processes performance up to a certain level tested in intended environment (TRL 5). Different nanotechnology based strategies have been addressed to develop methods to improve thermoplastics and m ...
Read Project

 14

 FINISHED 
"ASCENT will provide a robust proof-of-concept of three related high temperature processes; each will lead to a step-change in efficiency of carbon removal in three types of pre-combustion capture, producing the hydrogen needed for highly efficient low-carbon power production. The project brings together five small and medium enterprises preparing to launch these concepts with the support of leadi ...
Read Project

 18

 FINISHED 
Despite improved understanding of the links between ecosystem health, provision of ecosystem services and human well-being, further conceptual and empirical work is needed to make the ideas of ecosystem services (ESS) and natural capital (NC) operational. OpenNESS will therefore develop innovative and practical ways of applying them in land, water and urban management: it will identify how, where ...
Read Project

 39

 FINISHED 
"The project aims at developing reliable predictive models to estimate long-term (i.e. > 20 kh) performance and probability of failure of SOFC stacks based on existing materials and design produced by the industrial partners. This will allow the realization of stacks with extended service intervals and reduced maintenance cost with respect to the present stack technology. The extension of service ...
Read Project

 12

 FINISHED 

ELECTRA

Start date: Mar 3, 2014, End date: Mar 2, 2017,

"High temperature electrolysers (HTEs) produce H2 efficiently utilising electricity from renewable sources and steam from solar, geothermal, or nuclear plants. CO2 can be co-electrolysed to produce syngas and fuels. The traditional solid oxide electrolyser cell (SOEC) leaves wet H2 at the steam side. ELECTRA in contrast develops a proton ceramic electrolyser cell (PCEC) which pumps out and pressur ...
Read Project

 7

 FINISHED 
The ability of Europe’s communities to respond to increasing water stress by taking advantage of water reuse opportunities is restricted by low public confidence in solutions, inconsistent approaches to evaluating costs and benefits of reuse schemes, and poor coordination of the professionals and organisations who design, implement and manage them. The DEMOWARE initiative will rectify these shortc ...
Read Project

 30

 FINISHED 
Saving energy and water in the Dairy industry, by introducing innovations in the processing plant. Namely RF heating, solar thermal energy, mono-disperse atomising, dryer modelling, inline monitoring, cleaning with enzymes and membrane technology. With these technologies energy and water loops are closed instead of lost in the plant. These technologies will be demonstrated in pilot facilities.The ...
Read Project

 19

 FINISHED 

A BLUEPRINT of Haematopoietic Epigenomes (BLUEPRINT)

Start date: Oct 1, 2011, End date: Sep 30, 2016,

In response to the call for a high impact initiative on the human epigenome, the BLUEPRINT Consortium has been formed with the aim of generating at least 100 reference epigenomes and studying them to advance and exploit knowledge of the underlying biological processes and mechanisms in health and disease. BLUEPRINT will focus on distinct types of haematopoietic cells from healthy individuals and o ...
Read Project

 45

 FINISHED 
In the manufacturing industry, the machining of medium and big size parts with the required and suitable precision is a challenge, especially in high added value products manufactured in small or single-unit batches made of high performance materials like in aeronautic, space or energy sectors, where conventional process engineering and test/error methods are not completely efficient.INTEFIX aims ...
Read Project

 33

 FINISHED 
The general objective of EFEVE project is the improvement of the new technologies to manufacturing of materials (aluminium and magnesium alloy) and processes and new technologies of production that are more energy efficient, improve manufacturing productivity, optimize raw material consumption, flexible mold changes and manufacturing capability of producing multiple components, ...etc.The developm ...
Read Project

 18

 FINISHED 

Era-net Transport III (ENTIII)

Start date: Nov 1, 2012, End date: Apr 30, 2016,

Era-net Transport (ENT) has evolved since 2004 into a service platform for Programme Owners and Managers, providing the required framework for initiating and implementing transnational research and innovation funding collaborations ENTIII will further strengthen the foundation of the ERA, engaging 20 partner countries and regions, represented by Europe’s most relevant national transport research a ...
Read Project

 26

 FINISHED 
PCFC is one of the most promising technologies to reach the requirements related to cogeneration application, especially for small power systems (1-5 kWel). The investigation in the concept of advanced thin-film ceramic fuel cell technology at operating intermediate temperature between 400 and 700 °C aims at improving the characteristics (thermal cycling, heat transfer, current collection,.) as w ...
Read Project

 8

 FINISHED 
"Greenhouse cultivation under plastic has allowed converting apparently unproductive lands in modern agriculture exploitations. Different types of plastic materials such as Poly Vinyl Chloride (PVC), Poly Carbonate (PC) and Low Density Polyethylene (LDPE) are commonly used for cladding of greenhouse structures. However, most of plastic polymer films are prone to photo-degradation when exposed to ...
Read Project

 8

 FINISHED 

New Designs of Ecological Furnaces (EDEFU)

Start date: Jun 1, 2010, End date: May 31, 2014,

The general objective of the EDEFU project consists in developing new technologies of heating, new refractory materials to improve heat insulations and new designs for innovating recovery systems for residues for industrial furnaces in Non ferrous metals, glass, ceramics and cement industries. The evaluation of the success of the project will be realised through the validation of real scale demon ...
Read Project

 20

 FINISHED 

Breakthrough in European Ship and Shipbuilding Technologies (BESST)

Start date: Sep 1, 2009, End date: Feb 28, 2013,

"Initiated by EUROYARDS, BESST aims to achieve a breakthrough in competitiveness, environmentally friendliness and safety of EU built ships. Focusing on passenger ships, ferries and mega-yachts, the results will to a large extend be applicable also to other ships. A holistic life cycle performance assessment on ship level will guide the technical developments on system level, clustered in System G ...
Read Project

 70

 FINISHED 
"Presently available methods for the treatment of olive mill waste water are not acceptable from the environmental point of view (evaporation, discharge) or not suitable from the economic aspect (membrane treatments) costing 10-20% of revenues from oil selling. PHOTOMEM proposes a reliable and affordable technology solution to treat the waste water, applying a novel technical solution based on deg ...
Read Project

 9

 FINISHED 

Innovative Dual mEmbrAne fueL Cell (IDEAL-CELL)

Start date: Jan 1, 2008, End date: Dec 31, 2011,

IDEAL-Cell proposes to develop a new innovative and competitive concept of a high temperature Fuel Cell, operated in the range 600-700°C, based on the junction between a PCFC anode/electrolyte part and a SOFC electrolyte/cathode, through a mixed H2 and O2 conducting porous ceramic membrane. Protons created at the anode progress toward the central membrane to meet with Oxygen ions created at the ca ...
Read Project

 10

 FINISHED 

Common Language Resources and Technology Infrastructure (CLARIN)

Start date: Jan 1, 2008, End date: Jun 30, 2011,

The ultimate goal of CLARIN is the construction and operation of a shared distributed infrastructure that aims at making language resources and technology available to the humanities and social sciences research communities at large. The preparatory phase will pave the way for implementation along 4 dimensions: Funding and governance: The aim is to bring together the funding agencies and to work o ...
Read Project

 36

 FINISHED 

Copper Interconnects for Advanced Performance and Reliability (CopPeR)

Start date: Jan 1, 2008, End date: Nov 30, 2010,

The CopPeR project will provide a novel copper deposition process based on the useof non-aqueous solvents to overcome the limitations of currently employedinterconnect formation processes enabling device scaling beyond the 32 nmtechnology node. This non-aqueous process will open novel routes to implementdirect on barrier plating, focussing on tantalum and ruthenium as diffusion barriers.As another ...
Read Project

 8

 FINISHED 

EUROSIS

Start date: Feb 1, 2008, End date: Jun 30, 2010,

Transnational exchange of experiences and dissemination of best practices can constitute an important supporting element in the work should provide the SiS NCPs, at the same time contributing to the realisation of the concept of the Science in Society. The experiences of the benchmarking exercises within the activities to realise the SiS might serve as a source of stimulation. Also several activit ...
Read Project

 35