Search for European Projects

7 European Projects Found

Searched on 125080 European Projects

 FINISHED 
The integration of process, supply chain, and network design with sustainability is the main focus of this proposal. The goal of the proposed work is to aid the cost-effective improvement of the sustainability and general environmental performance of manufacturing processes and business supply chains. This is to be done by combining concepts and methods from the P-Graph framework for network and ...
Read Project

 1

 FINISHED 

Energy Systems Engineering (ESE)

Start date: Jun 1, 2012, End date: May 31, 2016,

"The main idea of the ESE proposed project is to exchange and transfer knowledge between 3 European Research groups (Imperial College - UK, University of Pannonia - Hungary and Aristotle University of Thessaloniki, Greece) and 3 distinguished and top university groups from China (Tsinghua University and Fudan University) and Korea (Yonsei University). The selected groups are leaders in the energy ...
Read Project

 4

 FINISHED 

Distributed Knowledge-Based Energy Saving Networks (DISKNET)

Start date: Feb 1, 2012, End date: Jan 31, 2016,

"Project DISKNET, plans an innovative scientific exchange in the field of designing and optimising distributed networks for efficient energy supply, management and use. The sustainability in the development in the EU and worldwide depends on a number of interrelated factors, originating from the environment, the economy and the society. Sufficient and secure energy supply at acceptable cost and mi ...
Read Project

 4

 FINISHED 
The overall objective of EFENIS is to facilitate and accelerate a move to low carbon manufacturing processes and site management by deployment and demonstration of innovative energy management systems and enabling efficiency technologies, which extend the scope of energy management outside the boundaries of a single plant to total site and then beyond the total site to district heating/cooling sys ...
Read Project

 18

 FINISHED 
A new technology towards breakthrough innovation in solvent based post-combustion CO2 capture for enhanced energy efficiency, improved cost effectiveness and increased process sustainability and environmental benefits is developed. Advances in the identification of highly performing solvents and solvent blends in CO2 absorption, the design of innovative separation equipment internals, and the deve ...
Read Project

 12

 FINISHED 
"The main objective of the DECADE proposal is to promote a significant increase in the range of energy control problems to which advanced optimisation-based control can be reliably applied. This will be achieved through the development of an electronic look-up function tailor-made for the specific energy systems. It can retrofit onto existing control hardware, or on new hardware. The above obje ...
Read Project

 4

 FINISHED 
"A core part of this proposal is the development of methodologies to select and rigorously design the appropriate type of enhancement technology into energy optimisation studies to a practical level, whereby process plant engineers can plan and carry out plant energy reduction programmes in which they will have confidence. The project aims to achieve at least 20% to 30 % energy savings in the ener ...
Read Project

 10