Search for European Projects

14 European Projects Found

Searched on 125080 European Projects

 FINISHED 
SATORI is a 45-month project, comprising 17 partners from 13 countries, including an intergovernmental organisation, the aim of which is to improve respect of ethics principles and laws in research and innovation, and to make sure that they are adequately adapted to the evolution of technologies and societal concerns. The partners will develop an ethics assessment framework based on thorough analy ...
Read Project

 19

 FINISHED 
Embedded systems are the key innovation driver to improve almost all mechatronic products with cheaper and even new functionalities. Furthermore, they strongly support today's information society as inter-system communication enabler.Consequently boundaries of application domains are alleviated and ad-hoc connections and interoperability play an increasing role. At the same time, multi-core and ma ...
Read Project

 101

 FINISHED 

Smart Wearable Robots with Bioinspired Sensory-Motor Skills (BioMot)

Start date: Oct 1, 2013, End date: Sep 30, 2016,

Wearable robots (WR) are person-oriented devices, usually in the form of exoskeletons. These devices are worn by human operators to enhance or support a daily function, such as walking. WRs find applications in the enhancement of intact operators or in clinical environments, e.g. rehabilitation of gait function in neurologically injured patients. Most advanced WRs for human locomotion still fail t ...
Read Project

 9

 FINISHED 
"SAVELEC aims to provide a solution for the external, safe control of a non cooperative vehicle without any consequences on the persons inside the vehicle or other persons and objects nearby. The proposed solution is based on the use of electromagnetic means, electromagnetic pulses (EMP) and high power microwaves (HPM), in order to disrupt the proper behaviour of the electronic components inside t ...
Read Project

 10

 FINISHED 
The importance of advanced simulation to the competitiveness of both large and small companies is well established. The principal objective of Fortissimo is to enable European manufacturing, particularly small to medium enterprises (SMEs), to benefit from the efficiency and competitive advantage inherent in the use of simulation. However, the simulation of, for example, high-pressure gas cylinders ...
Read Project

 96

 FINISHED 

Self learning Energy Efficient builDings and open Spaces (SEEDS)

Start date: Sep 1, 2011, End date: Feb 28, 2015,

This project develops a novel Self Learning Energy Efficient builDings and open Spaces (SEEDS) Facility Management system. The system will allow buildings to maintain user comfort whilst minimising energy consumption and CO2 emissions.SEEDS will develop an open architecture suitable both for retrofitting existing buildings and open spaces and for new building design.SEEDS will be based on research ...
Read Project

 9

 FINISHED 
The EU manufacturing sector is vitally important to the EU economy, contributing ~17.1% of GDP and accounted for some 22 million jobs (2007) . EU exports have expanded by 4.7% p.a. over 2000-2008 and in some sectors the EU has increased its share of world exports between 1996 and 2006, notably in chemicals, pharmaceuticals, and motor vehicles. SMEs represent 99% of the EU manufacturing sector equa ...
Read Project

 10

 FINISHED 
"This proposal aims to answer the FP7 Security research call SPA-2010-2.3.02 and the need to protect space assets from orbit collision. The number of debris in Low Earth Orbit is exponentially increasing with, in the short term, potential inter debris collisions. For medium size debris (between 1 cm and several dozens of cm) no effective and affordable protecting solution is available. This projec ...
Read Project

 10

 FINISHED 

Pharmaceutical Medicine Training Programme (PHARMATRAIN)

Start date: May 1, 2009, End date: Apr 30, 2014,

"The proposed Pharmaceutical Medicine Training Programme provides a comprehensive solution for the complex needs of integrated drug development for all professionals involved, incl. physicians, pharmaceutical scientists,biologists, biometricians, health economists, and safety and regulatory scientists from universities, regulatory agencies, large, middle-sized and small pharmaceutical enterprises, ...
Read Project

 52

 FINISHED 
ReCover project will develop beyond state-of-the-art service capabilities to support fighting deforestation and forest degradation in the tropical region. The pilot service capabilities mean provision of a monitoring system of forest cover and forest cover changes and biomass including a robust accuracy assessment. The capabilities are based on utilizing mainly space-borne earth observation data a ...
Read Project

 11

 FINISHED 

Reduced Certification Costs for Trusted Multi-core Platforms (RECOMP)

Start date: Apr 1, 2010, End date: Mar 31, 2013,

"The proposed RECOMP (Reduced certification cost for trusted multi-core platforms) research project will establish methods, tools and platforms for enabling cost-efficient certification and re-certification of safety-critical systems and mixed-criticality systems, i.e. systems containing safety-critical and non-safety-critical components.RECOMP recognizes the fact that the increasing processing po ...
Read Project

 40

 FINISHED 
"The FACIT SME project addresses SMEs operating in the ICT domain. The goals are (a) to facilitate the use of Software Engineering (SE) methods and to systematize their application integrated with the business processes, (b) to provide efficient and affordable certification of these processes according to internationally accepted standards, and (c) to securely share best practices, tools and exper ...
Read Project

 18

 FINISHED 
The goal of WSAN4CIP is to substantially advance the technology of Wireless Sensor and Actuator Networks (WSANs) beyond the current state of the art and to apply this technology to the Protection of Critical Infrastructures. In particular, the WSAN4CIP project will apply these advanced wireless and sensor network developments to the management of power generation and distribution infrastructure ma ...
Read Project

 12

 FINISHED 

E-SCIENCE GRID FACILITY FOR EUROPE AND LATIN AMERICA (EELA-2)

Start date: Apr 1, 2008, End date: Mar 31, 2010,

EELA-2 aims to build, on the current EELA e-Infrastructure, a high capacity, production-quality, scalable Grid Facility providing round-the-clock, worldwide access to distributed computing, storage and network resources for a wide spectrum of applications from European and Latin American scientific communities. The project will provide an empowered Grid Facility with versatile services fulfilling ...
Read Project

 56