 FINISHED 

Hydrogen Mobility Europe 2 (H2ME 2)

Start date: May 1, 2016, End date: Jun 30, 2022,

Hydrogen Mobility Europe 2 (H2ME 2) brings together action in 8 European countries to address the innovations required to make the hydrogen mobility sector truly ready for market. The project will perform a large-scale market test of hydrogen refuelling infrastructure, passenger and commercial fuel cell electric vehicles operated in real-world customer applications and demonstrate the system bene ...
Read Project

 37

 FINISHED 
The RUGGEDISED project will create urban spaces powered by secure, affordable and clean energy, smart electro-mobility, smart tools and services. The overall aims are:1. Improving the quality of life of the citizens, by offering the citizens a clean, safe, attractive, inclusive and affordable living environment.2. Reducing the environmental impacts of activities, by achieving a significant reducti ...
Read Project

 34

 FINISHED 
Under the coordination of VERBUND, VOESTALPINE, a steel manufacturer, and SIEMENS, a PEM electrolyser manufacturer, propose a 26 month demonstration of the 6MW electrolysis power plant installed at the VOESTALPINE LINZ plant (Austria). After pilot plant commissioning, the electrolyser is prequalified with the support of APG, the transmission operator of Austria, in order to provide grid-balancing ...
Read Project

 6

 FINISHED 
BIG HIT will create a replicable hydrogen territory in Orkney (Scotland) by implementing a fully integrated model of hydrogen production, storage, transportation and utilisation for heat, power and mobility. BIG HIT will absorb curtailed energy from two wind turbines and tidal turbines on the islands of Eday and Shapinsay, and use 1.5MW of PEM electrolysis to convert it into ~50 t pa of hydrogen. ...
Read Project

 12

 FINISHED 
inteGRIDy aims to integrate cutting-edge technologies, solutions and mechanisms in a scalable Cross-Functional Platform connecting energy networks with diverse stakeholders, facilitating optimal and dynamic operation of the Distribution Grid (DG), fostering the stability and coordination of distributed energy resources and enabling collaborative storage schemes within an increasing share of renewa ...
Read Project

 31

 FINISHED 
A step change in our noise mitigation strategies is required in order to meet the environmental targets set for a number of sectors of activity affecting people through noise exposure. Besides being a hindrance to our daily life and subject to regulations, noise emission is also a competitive issue in today’s global market. To address these issues, new technologies have been emerging recently, bas ...
Read Project

 13

 FINISHED 

Sharing Cities (SHAR-LLM)

Start date: Jan 1, 2016, End date: Dec 31, 2020,

Sharing Cities has four key objectives. 1) To achieve scale in the European smart cities market by proving that properly designed smart city solutions, based around common needs, can be integrated in complex urban environments. This will be done in a way that exhibits their true potential and allows for the significant scale-up and consequent increase in social, economic and environmental value. ...
Read Project

 36

 FINISHED 

Fishfriendly Innovative Technologies for Hydropower (FIThydro)

Start date: Nov 1, 2016, End date: Oct 31, 2020,

FIThydro addresses the decision support in commissioning and operating hydropower plants (HPP) by use of existing and innovative technologies. It concentrates on mitigation measures and strategies to develop cost-efficient environmental solutions and on strategies to avoid individual fish damage and enhancing population developments. Therefore HPPS all over Europe are involved as test sites. The f ...
Read Project

 26

 FINISHED 
Most maritime products are typically associated with large investments and are seldom built in large series. Where other modes of transport benefit from the economy of series production, this is not the case for maritime products which are typically designed to refined customer requirements increasingly determined by the need for high efficiency, flexibility and low environmental impact at a compe ...
Read Project

 39

 FINISHED 

EMMC Mechatronic Engineering

Start date: Aug 1, 2015, End date: Jul 31, 2020,

...er Universities (the University of Oviedo, Spain, the Karlsruhe University of Applied Sciences, Germany, the National Engineering Institute in Mechanics and Microtechniques, France, the Ivanovo State Power Engineering University, Russian Federation, and the Nile University, Egypt), and by other 11 educative and 23 non-educative associated partners located in France, Germany, Spain, Egypt, Russia, ...
Read Project

 5

 FINISHED 
... for the hydrogen reactions on the acidic side.Polymer-electrolyte FC & EL based on those concepts will be evaluated for targeted applications, i.e. photovoltaic electricity storage, off-grid back-up power and H2 production. The targeted market is distributed small-scale systems.
Read Project

 13

 FINISHED 
Certain industries, such as chemical production or petroleum refining have been identified as producing quantities of by-product hydrogen that can be used to produce clean, load-following power on a distributed basis, reducing reliance on fossil fuels. While the chemical production industry generally acknowledges the potential value of stationary fuel cell applications, the lack of multiple megawa ...
Read Project

 8

 FINISHED 

Hydrogen Mobility Europe (H2ME)

Start date: Jun 1, 2015, End date: May 31, 2020,

Hydrogen Mobility Europe (H2ME) brings together Europe’s 4 most ambitious national initiatives on hydrogen mobility (Germany, Scandinavia, France and the UK). The project will expand their developing networks of HRS and the fleets of fuel cell vehicles (FCEVs) operating on Europe’s roads, to significantly expand the activities in each country and start the creation of a pan-European hydrogen fuell ...
Read Project

 27

 FINISHED 
WiseGRID has two intertwined and equally important strategic goals: on the one hand, it aims at successfully putting in the market, within a horizon of 24 months after project completion, a set of solutions and technologies which increase the smartness, stability and security of an open, consumer-centric European energy grid, with an enhanced use of storage technologies and a highly increased shar ...
Read Project

 21

 FINISHED 
Traumatic Brain Injury (TBI) is a major cause of death and disability, leading to great personal suffering to victim and relatives, as well as huge direct and indirect costs to society. Strong ethical, medical, social and health economic reasons therefore exist for improving treatment. The CENTER-TBI project will collect a prospective, contemporary, highly granular, observational dataset of 5400 p ...
Read Project

 44

 FINISHED 
This initiative proposes an innovative training environment for 3 ESRs in a supportive environment provided by an award-winning progressive wave energy company (Aquamarine Power Ltd) and a research centre at the forefront of innovation in wave energy device optimisation and control (the Centre for Ocean Energy Research at NUIM). The ESRs will be recruited by COER and will be seconded for 50% of th ...
Read Project

 2

 FINISHED 
The ACHIEVE Consortium will bring together their world-leading expertise in the design and manufacturing of electrical machines for aircraft Advanced Generation Systems (AGS), integrated Power Electronics (PE), advanced control systems and intelligent thermal management, to develop an innovative advanced mechatronic device for electrical power management system of Turboprop. The ACHIEVE Consortiu ...
Read Project

 3

 FINISHED 

Living space in the estuary stretch of the river Traisen (Traisen)

Start date: Jan 1, 2009, End date: Dec 31, 2019,

...h the Natura 2000 site, Tullnfelder Donau-Auen. This site is the largest alluvial forest in Austria. However, the River Traisen is a heavily modified water body following the construction of the hydropower plant, Altenwörth, in 1976. The regulated river is missing aquatic and terrestrial habitats that are usually found on flood plains. The connection between the river and the surrounding riparian ...
Read Project

 3

 FINISHED 
The overall objective of the QualyGridS project is the establishing of standardized tests for electrolysers performing electrical grid services. Alkaline electrolysers as well as PEM electrolysers will be considered individually in performance analysis and in an assessment of business cases for these electrolysers’ use. A variety of different grid services will be addressed as well as multiple hyd ...
Read Project

 10

 FINISHED 
From aeronautics to oil&gas, complex metal parts embrace major challenges across their lifecycles from the green field intensive manufacturing to the numerous maintenance and repairing operations worldwide distributed. The synergic combination of additive and subtractive processes could overcome individual shortcomings, going beyond the simple succession of steps. 'Plug and produce' modular approa ...
Read Project

 20

 FINISHED 
...at retain the advantages of ferrites –availability, sustainability, cost, recyclability, eco-friendliness- and which have the potential to substitute currently used RE magnets (CRM) in the electric power system.Our targeted application is an electric energy storage device: we will substitute RE magnets by AMPHIBIAN ones in a demonstrator of a flywheel and evaluate its performance against cost, eco ...
Read Project

 11

 FINISHED 

Induction Starter Generator (ISG)

Start date: Apr 1, 2016, End date: Dec 31, 2019,

...novation that leads, thanks to the development to be performed in this project to a viable solution for demonstration as required by the CFP.The main idea is to use an induction machine associated to power electronics over options like the classic aeronautic Wound Field or brush DC machine, but also over common ground applications like high powered PMG machines, variable reluctance machines or cla ...
Read Project

 1

 FINISHED 

Massive InteGRATion of power Electronic devices (MIGRATE)

Start date: Jan 1, 2016, End date: Dec 31, 2019,

By 2020, several areas of the HVAC pan-European transmission system will be operated with extremely high penetrations of Power Electronics(PE)-interfaced generators, thus becoming the only generating units for some periods of the day or of the year – due to renewable (wind, solar) electricity. This will result in i) growing dynamic stability issues for the power system (possibly a new major barrie ...
Read Project

 24

 FINISHED 

GrowSmarter

Start date: Jan 1, 2015, End date: Dec 31, 2019,

GrowSmarter aims to:• Improve the quality of life for European citizens by better mobility, housing and the quality of urban infrastructure while improving the citizens economy by lower energy costs and creating as much as 1500 new jobs (on the demonstration level).• Reduce the environmental impact by lower energy needs by 60 % and increased use of renewable energy thus reducing GHG emissions eve ...
Read Project

 41

 FINISHED 

Environmentally Friendly, Efficient Electric Motion (3EMOTION)

Start date: Jan 1, 2015, End date: Dec 31, 2019,

The 3EMOTION project will provide policymakers and financing institutions with the necessary arguments to invest in Fuel Cell Buses (FCB) as a cost effective strategy to accelerate the reduction of harmful local emissions while offering attractive co-modality options for commuters. By leveraging the experiences of earlier FCB demonstrations in overcoming the last technical and economic barriers, a ...
Read Project

 15

 FINISHED 
In order to unlock the full potential of Europe’s offshore resources, network infrastructure is urgently required, linking off-shore wind parks and on-shore grids in different countries. HVDC technology is envisaged but the deployment of meshed HVDC offshore grids is currently hindered by the high cost of converter technology, lack of experience with protection systems and fault clearance componen ...
Read Project

 35

 FINISHED 
...ep wells in different geologies, will deliver new innovative solutions and models for wider deployments of EGS reservoirs with sufficient permeability for delivering significant amounts of geothermal power across Europe. DEEPEGS will demonstrate advanced technologies in three geothermal reservoir types that provide all unique condition for demonstrating the applicability of this “tool bag” on diff ...
Read Project

 10

 FINISHED 
URBANREC project aims to develop and implement an eco-innovative and integral bulky waste management system (enhancing prevention, improving logistics and allowing new waste treatments to obtain high added value recycled products) and demonstrate its effectiveness in different regions. In URBANREC project, Northern, Mediterranean, Eastern and South-eastern areas in Europe are represented by Belgiu ...
Read Project

 22

 FINISHED 
Medium- to large-scale bioenergy utilisation for electricity and combined industrial or district heating is predicted to increase by 160% in 2020 compared to 2010, while carbon emission quotas are becoming stricter. Finding new ways to efficiently utilise cheap and currently unused feedstocks are necessary in order to meet these challenges.Within the project Biofficiency we will investigate how to ...
Read Project

 11

 FINISHED 
Development of fuel injection equipment (FIE) able to reduce pollutant emissions from liquid-fueled transportation and power generation systems is a top industrial priority in order to meet the forthcoming EU 2020 emission legislations. However, design of new FIE is currently constrained by the incomplete physical understanding of complex micro-scale processes, such as in-nozzle cavitation, primar ...
Read Project

 10

 FINISHED 

Closed Loop Wind Farm Control (CL-Windcon)

Start date: Nov 1, 2016, End date: Oct 31, 2019,

Current practice in wind turbines operation is that every turbine has its own controller that optimizes its own performance in terms of energy capture and loading. This way of operating wind farms means that each wind turbine operates based only on the available information on its own measurements. This gets the wind farm to operate in a non-optimum way, since wind turbines are not operating as pl ...
Read Project

 15

 FINISHED 
Smart factories are characterized by increasing automation and increasing customization. In these dynamic environments flexible and adaptive work organization is crucial both for productivity and work satisfaction. Factory2Fit project will support this development by developing adaptation solutions with which people with different skills, capabilities and preferences can be engaged, motivated and ...
Read Project

 9

 FINISHED 

European Industrial DoCtorate on Offshore WiNd and Wave ENergy (ICONN)

Start date: Oct 1, 2015, End date: Sep 30, 2019,

...lead market position globally in this sector.The ICONN EID willi) provide state-of-the art training to Early Stage Researchers jointly with industries in the scientific and engineering disciplines of power take-off (PTO) and structural control, wave mechanics and hydrodynamics, CFD, sensing and system identification; ii) advance expertise, and research capacity, in the techno-economic-environmenta ...
Read Project

 3

 FINISHED 
...cenarios will generate against the current situation (i.e., baseline). Moreover sound training and replication strategies involving a number of other public authorities have been set-up towards the empowerment of the expected project impacts.
Read Project

 13

 FINISHED 
The NextBase project, involving 8 research institutions and 6 companies, deals with the development of innovative high-performance c-Si solar cells and modules based on the interdigitated back-contacted silicon heterojunction (IBC-SHJ) solar cell concept targeting cells with efficiency above 26.0% and corresponding solar modules with efficiency above 22.0%. In particular, a number of new design an ...
Read Project

 15

 FINISHED 
... methylal. The market for methylal is estimated to be worth about €5.2 billion/year. It is used in various industries due to its low toxicity, low viscosity and especially its high solvent power making it a sustainable alternative to petrol-based solvents. Therefore, the project addresses two major problems: the recovery of "difficult" plastic waste and the dependency on fossil fuel-derived mate ...
Read Project

 5

 FINISHED 

Advanced Smart-grid Power dIstRibution systEm (ASPIRE)

Start date: Sep 1, 2016, End date: Aug 31, 2019,

The ASPIRE Consortium will bring together their world-leading expertise in aircraft Electrical Power Systems (EPS) and Power Electronics (PE) in order to design, develop and manufacture an innovative DC/DC resonant cellular converter with automatic inversion functionality. This will be a key component in the creation and demonstration of an advanced Electrical Power Distribution System (EPDS) with ...
Read Project

 3

 FINISHED 

The Developing Human Connectome Project (dHCP)

Start date: Sep 1, 2013, End date: Aug 31, 2019,

Few advances in neuroscience could have as much impact as a precise global description of human brain connectivity and its variability. Understanding this ‘connectome’ in detail will provide insights into fundamental neural processes and intractable neuropsychiatric diseases.The connectome can be studied at millimetre scale in humans by neuroimaging, particularly diffusion and functional connectiv ...
Read Project

 4

 FINISHED 
MATChING goal is the reduction of cooling water demand in the energy sector through innovative technological solutions, to be demonstrated in thermal and geothermal power plants. The project targets include an overall saving of water withdrawal of 30% in thermal power generation, and a decrease of evaporative losses up to 15% in geothermal sector. The use of advanced and nano-technology based mate ...
Read Project

 17

 FINISHED 

LNG PILOTS

Start date: Jan 15, 2016, End date: Jun 30, 2019,

De introductie van LNG als nieuwe brandstof en energiebron voor de industrie brengt een onder-zoeks- en ontwikkelingsbehoefte met zich mee. Investeringen op dit gebied zullen de kwaliteit van de regionaal gevestigde onderzoeksinstellingen ten goede komen en de vestiging van hoogwaardige technologische ondernemingen op het gebied van logistiek, voertuigbouw, scheepsbouw, energietechniek en energiev ...
Read Project

 36