Search for European Projects

Over 40 European Projects Found

Searched on 125080 European Projects

 FINISHED 

Hydrogen Mobility Europe 2 (H2ME 2)

Start date: May 1, 2016, End date: Jun 30, 2022,

Hydrogen Mobility Europe 2 (H2ME 2) brings together action in 8 European countries to address the innovations required to make the hydrogen mobility sector truly ready for market. The project will perform a large-scale market test of hydrogen refuelling infrastructure, passenger and commercial fuel cell electric vehicles operated in real-world customer applications and demonstrate the system bene ...
Read Project

 37

 FINISHED 
The RUGGEDISED project will create urban spaces powered by secure, affordable and clean energy, smart electro-mobility, smart tools and services. The overall aims are:1. Improving the quality of life of the citizens, by offering the citizens a clean, safe, attractive, inclusive and affordable living environment.2. Reducing the environmental impacts of activities, by achieving a significant reducti ...
Read Project

 34

 FINISHED 
BIG HIT will create a replicable hydrogen territory in Orkney (Scotland) by implementing a fully integrated model of hydrogen production, storage, transportation and utilisation for heat, power and mobility. BIG HIT will absorb curtailed energy from two wind turbines and tidal turbines on the islands of Eday and Shapinsay, and use 1.5MW of PEM electrolysis to convert it into ~50 t pa of hydrogen. ...
Read Project

 12

 FINISHED 
inteGRIDy aims to integrate cutting-edge technologies, solutions and mechanisms in a scalable Cross-Functional Platform connecting energy networks with diverse stakeholders, facilitating optimal and dynamic operation of the Distribution Grid (DG), fostering the stability and coordination of distributed energy resources and enabling collaborative storage schemes within an increasing share of renewa ...
Read Project

 31

 FINISHED 

Sharing Cities (SHAR-LLM)

Start date: Jan 1, 2016, End date: Dec 31, 2020,

Sharing Cities has four key objectives. 1) To achieve scale in the European smart cities market by proving that properly designed smart city solutions, based around common needs, can be integrated in complex urban environments. This will be done in a way that exhibits their true potential and allows for the significant scale-up and consequent increase in social, economic and environmental value. ...
Read Project

 36

 FINISHED 
Most maritime products are typically associated with large investments and are seldom built in large series. Where other modes of transport benefit from the economy of series production, this is not the case for maritime products which are typically designed to refined customer requirements increasingly determined by the need for high efficiency, flexibility and low environmental impact at a compe ...
Read Project

 39

 FINISHED 
... for the hydrogen reactions on the acidic side.Polymer-electrolyte FC & EL based on those concepts will be evaluated for targeted applications, i.e. photovoltaic electricity storage, off-grid back-up power and H2 production. The targeted market is distributed small-scale systems.
Read Project

 13

 FINISHED 
Certain industries, such as chemical production or petroleum refining have been identified as producing quantities of by-product hydrogen that can be used to produce clean, load-following power on a distributed basis, reducing reliance on fossil fuels. While the chemical production industry generally acknowledges the potential value of stationary fuel cell applications, the lack of multiple megawa ...
Read Project

 8

 FINISHED 

Hydrogen Mobility Europe (H2ME)

Start date: Jun 1, 2015, End date: May 31, 2020,

Hydrogen Mobility Europe (H2ME) brings together Europe’s 4 most ambitious national initiatives on hydrogen mobility (Germany, Scandinavia, France and the UK). The project will expand their developing networks of HRS and the fleets of fuel cell vehicles (FCEVs) operating on Europe’s roads, to significantly expand the activities in each country and start the creation of a pan-European hydrogen fuell ...
Read Project

 27

 FINISHED 
Traumatic Brain Injury (TBI) is a major cause of death and disability, leading to great personal suffering to victim and relatives, as well as huge direct and indirect costs to society. Strong ethical, medical, social and health economic reasons therefore exist for improving treatment. The CENTER-TBI project will collect a prospective, contemporary, highly granular, observational dataset of 5400 p ...
Read Project

 44

 FINISHED 
This initiative proposes an innovative training environment for 3 ESRs in a supportive environment provided by an award-winning progressive wave energy company (Aquamarine Power Ltd) and a research centre at the forefront of innovation in wave energy device optimisation and control (the Centre for Ocean Energy Research at NUIM). The ESRs will be recruited by COER and will be seconded for 50% of th ...
Read Project

 2

 FINISHED 
The ACHIEVE Consortium will bring together their world-leading expertise in the design and manufacturing of electrical machines for aircraft Advanced Generation Systems (AGS), integrated Power Electronics (PE), advanced control systems and intelligent thermal management, to develop an innovative advanced mechatronic device for electrical power management system of Turboprop. The ACHIEVE Consortiu ...
Read Project

 3

 FINISHED 
The overall objective of the QualyGridS project is the establishing of standardized tests for electrolysers performing electrical grid services. Alkaline electrolysers as well as PEM electrolysers will be considered individually in performance analysis and in an assessment of business cases for these electrolysers’ use. A variety of different grid services will be addressed as well as multiple hyd ...
Read Project

 10

 FINISHED 
From aeronautics to oil&gas, complex metal parts embrace major challenges across their lifecycles from the green field intensive manufacturing to the numerous maintenance and repairing operations worldwide distributed. The synergic combination of additive and subtractive processes could overcome individual shortcomings, going beyond the simple succession of steps. 'Plug and produce' modular approa ...
Read Project

 20

 FINISHED 

Massive InteGRATion of power Electronic devices (MIGRATE)

Start date: Jan 1, 2016, End date: Dec 31, 2019,

By 2020, several areas of the HVAC pan-European transmission system will be operated with extremely high penetrations of Power Electronics(PE)-interfaced generators, thus becoming the only generating units for some periods of the day or of the year – due to renewable (wind, solar) electricity. This will result in i) growing dynamic stability issues for the power system (possibly a new major barrie ...
Read Project

 24

 FINISHED 

Environmentally Friendly, Efficient Electric Motion (3EMOTION)

Start date: Jan 1, 2015, End date: Dec 31, 2019,

The 3EMOTION project will provide policymakers and financing institutions with the necessary arguments to invest in Fuel Cell Buses (FCB) as a cost effective strategy to accelerate the reduction of harmful local emissions while offering attractive co-modality options for commuters. By leveraging the experiences of earlier FCB demonstrations in overcoming the last technical and economic barriers, a ...
Read Project

 15

 FINISHED 
In order to unlock the full potential of Europe’s offshore resources, network infrastructure is urgently required, linking off-shore wind parks and on-shore grids in different countries. HVDC technology is envisaged but the deployment of meshed HVDC offshore grids is currently hindered by the high cost of converter technology, lack of experience with protection systems and fault clearance componen ...
Read Project

 35

 FINISHED 
Smart factories are characterized by increasing automation and increasing customization. In these dynamic environments flexible and adaptive work organization is crucial both for productivity and work satisfaction. Factory2Fit project will support this development by developing adaptation solutions with which people with different skills, capabilities and preferences can be engaged, motivated and ...
Read Project

 9

 FINISHED 

Floating Tidal Energy Commercialisation project (FloTEC) (FloTEC)

Start date: Jan 1, 2016, End date: Jun 30, 2019,

...Tidal Technology;3. Develop potential of tidal energy generation towards flexible, baseload generation, through the integration of energy storage; 4. Demonstrate the potential for centralised MV power conversion to provide a generic, optimised low-cost solution for tidal arrays;5. Progress tidal energy towards maturity and standard project financing by reducing cost and risk, improving reliabilit ...
Read Project

 9

 FINISHED 
Hydrogen production by PEM water electrolysers (PEMWE) has the potential of becoming a key enabling technology in the deployment of FCH technologies in the future energy market as an energy storage system able to deliver hydrogen to different applications and enabling a high penetration of renewable energy sources (RES). PEMWE has showed capabilities in the emerging hydrogen scenarios to be a vali ...
Read Project

 5

 FINISHED 
...ck and balance of plant innovations, culminating in a six month field test of an advanced 180 (nominal)-300 kW (transient) PEM electrolyser. The electrolyser developed will implement an advanced BoP (power tracking electronics, high efficiency AC/DC converters, high temperature ion exchange cartridges, advanced safety integrated system, new control logic) and improved stack design and components ( ...
Read Project

 7

 FINISHED 

European Hydrogen Transit Buses in Scotland (HYTRANSIT)

Start date: Jan 1, 2013, End date: Dec 31, 2018,

Hydrogen buses have the potential to play a significant role in expanding the use of hydrogen in the transport sector. To date, however hydrogen bus demonstrations have been focussed on urban buses only, leaving other public transit applications completely unaddressed. In addition, only a limited number of European regions have had the chance to trial hydrogen bus technology, which means the techn ...
Read Project

 8

 FINISHED 
Fortissimo 2 will drive the uptake of advanced modelling, simulation and data analytics by European engineering and manufacturing SMEs and mid-caps. Such an uptake will deliver improved design processes, better products and services, and improved competitiveness. For the European Union as a whole this means improved employment opportunities and economic growth.The importance of advanced ICT to the ...
Read Project

 38

 FINISHED 

Design of 2 Technologies and Applications to Service (D2Service)

Start date: Sep 1, 2015, End date: Aug 31, 2018,

The current “Design to service” project aims at simplifying both, residential and commercial fuel cell systems for easy, fast and save system service and maintenance. In order to make best use of lessons learned and available resources, this project jointly works on two distinguished technologies (PEFC&SOFC) in two different markets (residential & extended UPS). Both SME manufacturers are committe ...
Read Project

 7

 FINISHED 

LEarnes and Teachers Strategies for Mechatronics Over View in Europe

Start date: Jun 1, 2016, End date: May 31, 2018,

The project is designed to:* Provide opportunities to our students, living in a small provincial area and having little contact with the European reality towards which, they sometimes express a kind of mistrust * Implement the chances to carry out work related learning activities, also abroad* To accept the demand of local companies that show a strong interest in language skills and the ability ...
Read Project

 9

 FINISHED 

Novel Integration of Powerplant System Equipment (NIPSE)

Start date: Jun 1, 2015, End date: May 31, 2018,

The main objectives of NIPSE are to provide technologies to- reduce Integrated PowerPlant System development time of future aeroengines by 10%- enable the 2 to 3% environmental related gains in fuel burn and reduction in emissions looked at by these new aeroengine architectures (especially Ultra High Bypass Ratio and Open Rotor) through improved aeroengine equipment solutions. The objectives will ...
Read Project

 10

 FINISHED 

Integrated, Intelligent modular power electronic converter (I2MPECT)

Start date: May 1, 2015, End date: Apr 30, 2018,

...e electric aircraft technologies with fully electrical actuation and environmental conditioning systems are moving from topics of academic interest to commercial applications. Despite the progress in power electronics and electrical drives, significant advances in power density and reliability are still required before electrical technologies are fully accepted in the aircraft industry. The therma ...
Read Project

 9

 FINISHED 
The overall concept of MANTIS is to provide a proactive maintenance service platform architecture based on Cyber Physical Systems that allows to estimate future performance, to predict and prevent imminent failures and to schedule proactive maintenance. Maintenance is no longer a necessary evil that costs what it costs, but an important function that creates additional value in the business proces ...
Read Project

 47

 FINISHED 

Graphene-based disruptive technologies (GrapheneCore1)

Start date: Apr 1, 2016, End date: Mar 31, 2018,

This project is the second in the series of EC-financed parts of the Graphene Flagship. The Graphene Flagship is a 10 year research and innovation endeavour with a total project cost of 1,000,000,000 euros, funded jointly by the European Commission and member states and associated countries. The first part of the Flagship was a 30-month Collaborative Project, Coordination and Support Action (CP-CS ...
Read Project

 158

 FINISHED 

CAST (CArbon-14 Source Term) (CAST)

Start date: Oct 1, 2013, End date: Mar 31, 2018,

The CAST project (CArbon-14 Source Term) aims to develop understanding of the generation and release of 14C from radioactive waste materials under conditions relevant to waste packaging and disposal to underground geological disposal facilities. The project will focus on releases from irradiated metals (steels, Zircaloys) and from ion-exchange materials as dissolved and gaseous species. A study t ...
Read Project

 37

 FINISHED 

Smart Nano-objects for Alteration of Lipid-bilayers (SNAL)

Start date: Apr 1, 2014, End date: Mar 31, 2018,

"SNAL is a multidisciplinary programme specially designed to provide scientific and transferable skill training and career development for early stage researchers and experienced researchers in membrane research. Working in a multidisciplinary network will give the researchers a broad perspective on their research field as well as the basic ability of pursuing a research project from basic science ...
Read Project

 10

 FINISHED 

Silicon Nitride Coatings for Improved Implant Function (LifeLongJoints)

Start date: Apr 1, 2013, End date: Mar 31, 2018,

Articulating joint replacements represent a medical market exceeding €14 billion p.a. that is expected to rise as demographics reflect an ageing population. However, faster growth has been seen in the revision market, where prosthetic joints are replaced, than in primary interventions. The major cause of these revisions is that all joint replacements are prone to wear leading to loss of implant fu ...
Read Project

 16

 FINISHED 
...ted high temperature processes; each will lead to a step-change in efficiency of carbon removal in three types of pre-combustion capture, producing the hydrogen needed for highly efficient low-carbon power production. The project brings together five small and medium enterprises preparing to launch these concepts with the support of leading research institutes, universities and industrial partners ...
Read Project

 18

 FINISHED 
There is a pressing need at the European and global levels to address challenges in the design of a new generation of fuels in order to achieve significant efficiency and emissions benefits in modern downsized boosted engines employing gasoline and ethanol blends. Abnormal combustion phenomena are a severe constraint to the use of much higher boosting pressures which are needed for significant ga ...
Read Project

 8

 FINISHED 
The consortium behind the MARINCOMP IAPP – NUI Galway and University of Ulster; Toray Carbon Fibers Europe, a company specialized in manufacture of carbon fibre; EireComposites, an SME with innovative composite manufacturing technology; and Suzlon Blade Technology, a utility class wind turbine manufacturer – aims to reduce the cost of offshore wind and tidal turbine blade structures and enable the ...
Read Project

 8

 FINISHED 
Dementia is a growing health problem with enormous costs to society: the costs currently equal 1% of the global gross-domestic product and a three-fold increase to 115 million dementia cases is expected by 2050. Addressing this grave human and economic challenge requires efficient solutions that do not exist yet: tools to detect and diagnose persons at an early phase, and interventions for delayin ...
Read Project

 10

 FINISHED 
...n order to arrive at the lowest hydrogen supply cost.The project partners cover the entire value chain and all the disciplines and technologies required for providing fully working hydrogen powered fuel cell material handling solutions ranging from fuel cell system providers, vehicle manufacturers, infrastructure operators and SME companies.The partners will also plan and ensure initiation of supp ...
Read Project

 13

 FINISHED 
Rapidly developing markets such as green construction, energy harvesting and storage, advanced materials for aerospace, electronics, medical implants and environmental remediation are potential key application targets for nanomaterials. There, nanotechnology has the potential to make qualitative improvements or indeed even to enable the technology. Impacts range from increased efficiency of energy ...
Read Project

 26

 FINISHED 
The overall objectives of the INNWIND.EU project are the high performance innovative design of a beyond-state-of-the-art 10-20MW offshore wind turbine and hardware demonstrators of some of the critical components. These ambitious primary objectives lead to a set of secondary objectives, which are the specific innovations, new concepts, new technologies and proof of concepts at the sub system and t ...
Read Project

 29

 FINISHED 
"TRUST aims at conducting CO2 injection experiments at scales large enough so that the output can be extrapolated at industrial scales. It relies on four sites: the heavily instrumented sites of Heletz (Israel, main site) and Hontomin (Spain), access Miranga (Brazil) and the emerging site in the Baltic Sea region. The objectives are to: carry out CO2 injection with different strategies, displaying ...
Read Project

 18