Search for European Projects

26 European Projects Found

Searched on 125080 European Projects

 FINISHED 
The Research Infrastructure (RI) ACTRIS – Aerosols, Clouds and Trace Gases - is the pan-European RI that consolidates activities amongst European partners for observations of aerosols, clouds, and trace gases and for understanding of the related atmospheric processes, to provide RI services to wide user groups. ACTRIS is composed of 8 connected elements: distributed National Facilities (observatio ...
Read Project

 28

 FINISHED 
The stabilization of molten corium is recognised as essential if a safe and stable state is to be reached following a severe accident. Among the possible options, In-Vessel Melt Retention (IVMR) appears as an attractive solution that would minimize the risks of containment failure (less Hydrogen produced, no corium-concrete interaction), if it can be proved to be feasible.The strategy is already a ...
Read Project

 25

 FINISHED 

Aerosols, Clouds, and Trace gases Research InfraStructure (ACTRIS-2)

Start date: May 1, 2015, End date: Apr 30, 2019,

ACTRIS-2 addresses the scope of integrating state-of-the-art European ground-based stations for long term observations of aerosols, clouds and short lived gases capitalizing work of FP7-ACTRIS. ACTRIS-2 aims to achieve the construction of a user-oriented RI, unique in the EU-RI landscape. ACTRIS-2 provides 4-D integrated high-quality data from near-surface to high altitude (vertical profiles and t ...
Read Project

 32

 FINISHED 
...detector technology are required to ensure the success of these endeavours. The AIDA-2020 project brings together the leading European infrastructures in detector development and a number of academic institutes, thus assembling the necessary expertise for the ambitious programme of work. In total, 19 countries and CERN are involved in this programme, which follows closely the priorities of the Eur ...
Read Project

 38

 FINISHED 
A Roadmap to the realization of fusion energy was adopted by the EFDA system at the end of 2012. The roadmap aims at achieving all the necessary know-how to start the construction of a demonstration power plant (DEMO) by 2030, in order to reach the goal of fusion electricity in the grid by 2050. The roadmap has been articulated in eight different Missions. The present proposal has the goal of impl ...
Read Project

 31

 FINISHED 
The main objective of the proposed CORONA II project is to enhance the safety of nuclear installations through further improvement of the training capabilities aimed at building up the necessary personnel competencies.Specific objective of the proposed CORONA II project is to proceed with the development of state-of-the-art regional training center for VVER competence (which will be called CORONA ...
Read Project

 9

 FINISHED 
Clouds are a very important, yet not well understood feedback factor in climate change and they contribute to the effective radiative forcing (ERF) from aerosol-cloud interactions (ACI). The uncertainty in ERFaci is larger than for any other forcing agent. Also, feedbacks between the terrestrial and marine biosphere and the atmosphere involving ACI are thought to play an important role in regulati ...
Read Project

 22

 FINISHED 

Code for European Severe Accident Management (CESAM)

Start date: Apr 1, 2013, End date: Mar 31, 2017,

The Fukushima accidents highlighted that both the in-depth understanding of such sequences and the development or improvement of adequate severe accident management measures is essential in order to further increase the safety of the nuclear power plants operated in Europe. CESAM (Code for European Severe Accident Management) is a R&D project that aims in particular at the improvement of the Europ ...
Read Project

 21

 FINISHED 

Advanced Safety Assessment : Extended PSA (ASAMPSA_E)

Start date: Jul 1, 2013, End date: Dec 31, 2016,

The Fukushima nuclear accident in Japan resulted from the combination of two correlated extreme external events (earthquake and tsunami). The consequences (flooding in particular) went beyond what was considered in the initial NPP design. Such situations can be identified using PSA methodology that complements the deterministic approach for beyond design accidents. If the performance of a Level 1 ...
Read Project

 29

 FINISHED 
"The ARCADIA project has been conceived so as to provide a twofold support to the further development of nuclear research programs in the NMS, targeting two major areas included in the Strategic Research and Innovation Agenda of SNETP: ESNII, through the support of the ALFRED project towards its realization in Romania, and NUGENIA, approaching remaining safety aspects of Gen III/III+ that could be ...
Read Project

 28

 FINISHED 

NUCLEAR REACTOR SAFETY SIMULATION PLATFORM (NURESAFE)

Start date: Jan 1, 2013, End date: Dec 31, 2015,

After the 2011 disaster that occurred in Japan, improvement of nuclear safety appears more clearly as a paramount condition for further development of nuclear industry. The NURESAFE project addresses engineering aspects of nuclear safety, especially those relative to design basis accidents (DBA). Although the Japanese event was a severe accident, in a process of defense-in-depth, prevention and c ...
Read Project

 25

 FINISHED 
Provide authorities from the entire cross-border area with means for the coordinated implementation of Community strategies and legislation as well as of bilateral-Conventions regarding emergency preparedness, planning and intervention in case of chemical, biological and radiological/nuclear (CBRN) emergencies.
Read Project

 4

 FINISHED 
Climate change is for a large part governed by atmospheric processes, in particular the interaction between radiation and atmospheric components (e.g. aerosols, clouds, greenhouse and trace gases). Some of these components are also those with adverse health effects influencing air quality. Strengthening the ground-based component of the Earth Observing System for these key atmospheric variables ha ...
Read Project

 29

 FINISHED 

Advanced European Infrastructures for Detectors at Accelerators (AIDA)

Start date: Feb 1, 2011, End date: Jan 31, 2015,

AIDA (http://cern.ch/aida) addresses the upgrade, improvement and integration of key research infrastructures in Europe, developing advanced detector technologies for future particle accelerators, as well as transnational access to facilities that provide these research infrastructures.In line with the European Strategy for Particle Physics, AIDA targets the infrastructures needed for R&D, prototy ...
Read Project

 39

 FINISHED 

European Nuclear Science and Applications Research (ENSAR)

Start date: Sep 1, 2010, End date: Dec 31, 2014,

ENSAR is the Integrating Activity of Nuclear Scientists from almost all European countries performing research in three of the major subfields of Nuclear Physics: Nuclear Structure, Nuclear Astrophysics and Applications of Nuclear Science. It proposes an optimised ensemble of Networking (NAs), Transnational Access and Joint Research Activities (JRAs), which will ensure qualitative and quantitative ...
Read Project

 32

 FINISHED 
Scientific research is no longer conducted within national boundaries and is becoming increasing dependent on the large-scale analysis of data, generated from instruments or computer simulations housed in trans-national facilities, by using e Infrastructure (distributed computing and storage resources linked by high-performance networks).The 48 month EGI-InSPIRE project will continue the transitio ...
Read Project

 143

 FINISHED 
The essence of the project is to provide a special purpose structure for training and qualification of personnel for serving VVER technology as one of nuclear power options used in EU. Such approach should allow unifying existing VVER related training schemes according to IAEA standards and commonly accepted criteria recognized in EU. The structure is based on three general pillars: 1) Training sc ...
Read Project

 12

 FINISHED 

Danube WATER integrated management (WATER)

Start date: Jun 29, 2012, End date: Jun 28, 2014,

Improving water monitoring and the warnings system, environmental data dissemination on the Romanian-Bulgarian border counties. Processing and conditioning the liquid organic wastes radioactively contaminated from the nuclear plants Cernavodǎ and Kozloduy.
Read Project

 13

 FINISHED 
The purpose of project BlackSeaHazNet is development of long-term research cooperation through coordinated joint program of researcher’s exchange. The base is Complex Program for research of possibility for forecast earthquake’s time, place (epicenter, depth), magnitude and intensity using reliable precursors. Precursors research includes regional geophysical and seismological monitoring, monitori ...
Read Project

 9

 FINISHED 

New MS Linking for an Advanced Cohesion in Euratom Research (NEWLANCER)

Start date: Nov 1, 2011, End date: Oct 31, 2013,

"NEWLANCER project proposes to identify and implement effective and efficient actual solutions leading to enlarged NMS involvement in future Euratom Framework Programmes by strengthening and catalyzing the full R&D potential at national level, by increasing cohesion between New Member States institutions, and by improving their cooperation with Old Member States research centres.The specific sub-o ...
Read Project

 19

 FINISHED 

Severe Accident Research Network of Excellence 2 (SARNET2)

Start date: Apr 1, 2009, End date: Mar 31, 2013,

Most of the actors involved in severe accident research in Europe, plus Canada, Korea and the United States (41 partners), will network in SARNET2 (Severe Accident Research NETwork of Excellence - Phase 2) their capacities of research in order to resolve important pending issues on postulated severe accidents of existing and future Nuclear Power Plants (NPPs). The project has been defined in order ...
Read Project

 45

 FINISHED 
The Black Sea Catchment is internationally known as one of ecologically unsustainable development and inadequate resource management, which has led to severe environmental, social and economic problems. EnviroGRIDS @ Black Sea Catchment aims at building the capacities of regional stakeholders to use new international standards to gather, store, distribute, analyze, visualize and disseminate crucia ...
Read Project

 30

 FINISHED 

NUclear Reactor Integrated Simulation Project (NURISP)

Start date: Jan 1, 2009, End date: Jun 30, 2012,

The target of the proposed NURISP Collaborative Project is to make new and significant steps towards a European Reference Simulation Platform for applications relevant to present PWR and BWR and to future reactors. The roadmap of this Simulation Platform will be proposed to be part of the future Strategic Research Agenda of the Sustainable Nuclear Energy Technology Platform (SNE-TP). The first st ...
Read Project

 23

 FINISHED 

SPIRAL2 PREPARATORY PHASE (SPIRAL2PP)

Start date: Nov 1, 2007, End date: Mar 31, 2012,

The SPIRAL 2 Preparatory Phase project aims to achieve the development and signing of the consortium agreement allowing for the construction of the facility. The SPIRAL 2 project located at the GANIL facility (Caen, France) will deliver energetic rare (radioactive) isotope beams with intensities not yet available with presently running machines. The studies of the properties of nuclei forming thes ...
Read Project

 25

 FINISHED 

ERA-NET for Nuclear Physics Infrastructures (NuPNET)

Start date: Mar 1, 2008, End date: Nov 30, 2011,

To face the increase in the complexity of facilities, and the cost and technical demands in a global context of international user groups and expertise, 18 European Funding Agencies representing 14 countries have decided to submit an ERA-NET project to provide Europe with a more coherent funding of its Nuclear Physics Infrastructures and equipments. The project will ensure exchange of information, ...
Read Project

 19

 FINISHED 

Enabling Grids for E-sciencE III (EGEE-III)

Start date: May 1, 2008, End date: Apr 30, 2010,

A globally distributed computing Grid now plays an essential role for large-scale, data intensive science in many fields of research. The concept has been proven viable through the Enabling Grids for E-sciencE project (EGEE and EGEE-II, 2004-2008) and its related projects. EGEE-II is consolidating the operations and middleware of this Grid for use by a wide range of scientific communities, such as ...
Read Project

 167