Search for European Projects

36 European Projects Found

Searched on 125080 European Projects

 FINISHED 
The vision of EU-ToxRisk is to drive a paradigm shift in toxicology towards an animal-free, mechanism-based integrated approach to chemical safety assessment. The project will unite all relevant disciplines and stakeholders to establish: i) pragmatic, solid read-across procedures incorporating mechanistic and toxicokinetic knowledge; and ii) ab initio hazard and risk assessment strategies of chemi ...
Read Project

 43

 FINISHED 
The FLEDGED project will deliver a process for Bio-based dimethyl Ether (DME) production from biomass. The FLEDGED project will combine a flexible sorption enhanced gasification (SEG) process and a novel sorption enhanced DME synthesis (SEDMES) process to produce DME from biomass with an efficient and low cost process.The primary aim of FLEDGED project is to develop a highly intensified and flexib ...
Read Project

 11

 FINISHED 
Zelcor project aims at demonstrating the feasibility of transforming lignocellulose biorefinery recalcitrant side streams into high added-value biobased products, including fine chemicals. Its concept is to combine chemical and enzymatic catalysis with insects-based biological conversion, within a biorefinery integrated approach. The project is conceived to avoid waste production by recycling wast ...
Read Project

 18

 FINISHED 
Toxicology and risk assessment are undergoing a paradigm shift, from a phenomenological to a mechanistic discipline based on in vitro and in silico approaches that represent an important alternative to classical animal testing applied to the evaluation of chronic and systemic toxicity risks. Large databases and highly sophisticated methods, algorithms and tools are available for different tasks su ...
Read Project

 14

 FINISHED 
A significant challenge to ensuring sustainable production and use of nanotechnologies is to understand safety and health risks of the technology and its end-products, and to implement practical strategies to manage these risks. Knowledge is growing rapidly, but effective use of this knowledge for risk management is lagging behind. We therefore need to bridge the gap between knowledge on hazard an ...
Read Project

 17

 FINISHED 
The HUGS concept ( HUmins as Green and Sustainable precursors of eco-friendly materials and biofuels) discloses an integrated multidisciplinary EID proposal with involvement of high-tech SME’s two research centers and 3 world class universities in the area of biorefinery. All partners have been chosen by their complementary expertise and their extensive experience in supervising PhD programs and c ...
Read Project

 6

 FINISHED 
The objective of the caLIBRAte project is to establish a state-of-the-art versatile Risk Governance framework for assessment and management of human and environmental risks of MN and MN-enabled products. The framework will be a web-based “system-of-systems” linking different models and methods for: 1) screening of apparent and perceived risks and trends in nanotechnology, 2) control banding, quali ...
Read Project

 26

 FINISHED 

EPOS Implementation Phase (EPOS IP)

Start date: Oct 1, 2015, End date: Sep 30, 2019,

The nations of Europe are distributed around some of the most complex and dynamic geological systems on the planet and understanding these is essential to the security of livelihoods and economic power of Europeans. Many of the solutions to the grand challenges in the geosciences have been led by European scientists – the understanding of stratigraphy (the timing and distribution of layers of sedi ...
Read Project

 48

 FINISHED 

Nanomaterial FAte and Speciation in the Environment (NanoFASE)

Start date: Sep 1, 2015, End date: Aug 31, 2019,

Concept: NanoFASE will deliver an integrated Exposure Assessment Framework, including methods, parameter values, model and guidance that will allow Industry to assess the full diversity of industrial nano-enabled products to a standard acceptable in regulatory registrations. Methods to assess how use phases, waste streams and environmental compartments (air, soil, water biota) act as “reactors” in ...
Read Project

 39

 FINISHED 

High energy lithium sulphur cells and batteries (HELIS)

Start date: Jun 1, 2015, End date: May 31, 2019,

Lithium sulphur batteries (LSB) are viable candidate for commercialisation among all post Li-ion battery technologies due to their high theoretical energy density and cost effectiveness. Despites many efforts, there are remaining issues that need to be solved and this will provide final direction of LSB technological development. Some of technological aspects, like development of host matrices, in ...
Read Project

 16

 FINISHED 

EuroMix

Start date: May 15, 2015, End date: May 14, 2019,

Euromix aim to develop an experimentally verified, tiered strategy for the risk assessment of mixtures of multiple chemicals derived from multiple sources across different life stages. The project takes account of the gender dimension and balances the risk of chemicals present in foods against the benefits of those foods.Important concepts for this new strategy are prioritisation criteria for chem ...
Read Project

 26

 FINISHED 
The aim of CHEOPS is to develop very low-cost but highly performing photovoltaic (PV) devices based on the emerging perovskite (PK) technology. At lab scale (20%. But only few attempts at upscaling have been made, yielding significantly reduced efficiencies 14% stable for aperture area in modules >15x15cm2). This will demonstrate the potential of PK as a very low-cost technology (target 29% on 2x2 ...
Read Project

 13

 FINISHED 
"SOLUTIONS will deliver a conceptual framework for the evidence-based development of environmental and water policies. This will integrate innovative chemical and effect-based monitoring tools with a full set of exposure, effect and risk models and assessment options. Uniquely, SOLUTIONS taps (i) expertise of leading European scientists of major FP6/FP7 projects on chemicals in the water cycle, (i ...
Read Project

 41

 FINISHED 
One of the greatest challenges facing regulators in the ever changing landscape of novel nano-materials is how to design and implement a regulatory process which is robust enough to deal with a rapidly diversifying system of manufactured nanomaterials (MNM) over time. Not only does the complexity of the MNM present a problem for regulators, the validity of data decreases with time, so that the wel ...
Read Project

 46

 FINISHED 
Large scale crises are affecting critical infrastructures with a growing frequency. This is a result of both basic exposure and dependencies between infrastructures. Because of prohibitive costs, the paradigm of protection against extreme events is expanding and now also encompasses the paradigm of resilience. In addition to strengthening and securing systems; system design objectives are now bein ...
Read Project

 12

 FINISHED 
...hydrogen needed for highly efficient low-carbon power production. The project brings together five small and medium enterprises preparing to launch these concepts with the support of leading research institutes, universities and industrial partners.The essential feature linking the three technologies is the use of a high temperature solid sorbent for the simultaneous separation of CO2 during conve ...
Read Project

 18

 FINISHED 
The aim of HELIX is to exploit novel tools and methods (remote sensing/GIS-based spatial methods, omics-based approaches, biomarkers of exposure, exposure devices and models, statistical tools for combined exposures, novel study designs, and burden of disease methodologies), to characterise early-life exposure to a wide range of environmental hazards, and integrate and link these with data on majo ...
Read Project

 16

 FINISHED 
... of OCTAVIUS. Application to coal power stations but also NGCC will be considered.OCTAVIUS builds forward on previous FP6 and FP7 CCS projects such as CASTOR and CESAR. The main coordinating research institutes and industrial partners of these projects also take part in OCTAVIUS. Results of the clean coal research are provided by end-users, engineering companies and technology vendors partnering i ...
Read Project

 18

 FINISHED 

End-user driven DEmo for cbrNe (EDEN)

Start date: Sep 1, 2013, End date: Dec 31, 2016,

The accidental or deliberate release of CBRNE materials are low probability events that can have a significant impact on citizens and society. Whenever and wherever they occur, they usually require a gradual and multi-facetted response as they tend to provoke severe and unexpected physical, psychological, societal, economical and political effects that cross EU-borders. Successful CBRNE resilience ...
Read Project

 47

 FINISHED 
The mine of the future will exploit mineral raw materials at greater depths than today, requiring completely different approaches compared to today’s deep mines, in order to get mineral rights. Only these eco-efficient mines will contribute to improved access to domestic mineral resources, secure the supply of mineral raw materials for Europe and reduce the import dependency.IntelliMine will contr ...
Read Project

 27

 FINISHED 

Managing Risks of Nanoparticles (MARINA)

Start date: Nov 1, 2011, End date: Oct 31, 2015,

While there are standard procedures for product life cycle analysis, exposure, hazard, and risk assessment for traditional chemicals, is not yet clear how these procedures need to be modified to address all the novel properties of nanomaterials. There is a need to develop specific reference methods for all the main steps in managing the potential risk of ENM. The aim of MARINA is to develop such ...
Read Project

 54

 FINISHED 
"EDA-EMERGE aims to train a new generation of young scientists in the interdisciplinary techniques required to meet the major challenges in the monitoring, assessment and management of toxic pollution in European river basins considering the enormous complexity of contamination, effects and cause-effect relationships. By integrating innovative mode-of-action based biodiagnostic tools including in ...
Read Project

 12

 FINISHED 

Monitoring Atmospheric Composition and Climate -III (MACC-III)

Start date: Aug 1, 2014, End date: Aug 31, 2015,

MACC-III is the last of the pre-operational stages in the development of the Copernicus Atmosphere Service. Its overall institutional objective is to function as the bridge between the developmental precursor projects - GEMS, PROMOTE, MACC and MACC-II- and the Atmosphere Service envisaged to form part of Copernicus Operations.MACC-III will provide continuity of the atmospheric services provided by ...
Read Project

 39

 FINISHED 
The importance of aging of infrastructures, networks and industrial plants will continue to increase because of (a) need to continue operation of these infrastructures, networks and plants beyond the design life-time, (b) need to operate under changed conditions and (c) the increased role of existing plants in the optimized (“smart”) supply and utility networks of the future, e.g. as fall-back sup ...
Read Project

 15

 FINISHED 
... set of selected chemicals; To develop and make freely available a web tool for predicting chemical properties; and To establish a network of experts from regulatory bodies, industry and scientific institutions, who will work to improve standardisation of the use of non-animal testing methods. Expected results The project expects to achieve the following quantified results: Production of guid ...
Read Project

 9

 FINISHED 
... the complete value chain of catalytic membrane reactors, can only be carried out with a multidisciplinary and complementary team having the right expertise, including top level European Research Institutes and Universities (8 RES) working together with representative top industries (4 SME, 5 IND) in different sectors (from raw materials to chemical end-users).
Read Project

 20

 FINISHED 

STAtionary BAtteries LI-ion safe Deployment (STABALID)

Start date: Oct 1, 2012, End date: Mar 31, 2015,

The development of the Smart Energy Networks is a key priority to facilitate the transition to a more sustainable energy supply in Europe. Li-ion battery is a very promising technology for improving the penetration of renewable energy sources (RES) in the energy mix and enabling a better management of energy in the European grid. The overall objective of the STABALID project is to facilitate the d ...
Read Project

 8

 FINISHED 
Industrial safety is an enabling and important success-factor in the pursuit of beneficial business activities. For this reason, industrial safety is a vital and important prerequisite for sustainable growth and competitiveness of the EU. Therefore, there is an urgent need to refocus the resources of national research programmes in EU Member States on industrial safety since the problems related t ...
Read Project

 22

 FINISHED 

Channel Catchments Cluster (3C)

Start date: Apr 22, 2013, End date: Jan 29, 2015,

The aim of the 3C “Channel Catchments Cluster” is to gather, share and disseminate best practices and tools developed in the context of various Interreg IV A France (Channel) - England projects to make scientific recommendations for better water quality.
Read Project

 10

 FINISHED 

Gentle remediation of trace element contaminated land (GREENLAND)

Start date: Jan 1, 2011, End date: Dec 31, 2014,

"Gentle remediation options (g.r.o.) include various (mostly plant based) approaches to remediate trace element contaminated soils at low cost and without significant negative effects for the environment. Although g.r.o. comprise very innovative and efficient technologies, they are still not widely used as practical site solution due to several reasons of hindrance for applying g.r.o. as practical ...
Read Project

 18

 FINISHED 
"Today, human risk assessment and environmental risk assessment are typically separated. Existing risk assessment (RA) experience and regulations are challenged by future RA needs.- There is a lack of mutual understanding between subject matter experts of individual disciplines.- Data from toxicological and ecotoxicological studies is not readily accessible by risk assessors across disciplines.- T ...
Read Project

 10

 FINISHED 
Standardization is one of the most adequate solutions to quickly capitalize and disseminate knowledge in “reference documents”, and have it implemented in the industry. It is very important in the field of nanotechnologies since the production of knowledge is very intensive. The overall objective of nanoSTAIR project is to build a sustainable process and platform in the field of nanotechnologies t ...
Read Project

 10

 FINISHED 
The aim of the project is to improve the quality and minimise pollution of soil and groundwater by developing an integrated approach to tackle the threats caused by contamination with chlorinated solvents in urban areas. Chlorinated solvents according are amongst the most common soil and groundwater contaminants due to their widespread use as dry-cleaning solvents and degreasing agents (annex ...
Read Project

 9

 FINISHED 

High Energy Lithium-Ion Storage Solutions (HELIOS)

Start date: Nov 1, 2009, End date: Oct 31, 2013,

...dard for safety and life (cycle/storage) tests, adapted to High Energy applications such ad EV, PHEV and Heavy Duty Hybrid Truck. The project partners include six OEMs, one battery manufacturer, test Institutes/Universities and one recycler."
Read Project

 22

 FINISHED 
Background The EU needed a better information base for the Thematic Strategy on Air Pollution and the negotiations of post-Kyoto climate agreements. Reaching political acceptance of further environmental measures required: identification of the most cost-effective measures; demonstration of their full range of environmental benefits taking into account si ...
Read Project

 7

 FINISHED 
...f the communication parameters of the crises affects directly the gravity of the impact. The project therefore addresses the objective of training to key communicative competences the staff of public institutions. The partners plan to 1) realise a field research and analysis with the aim of identifying the needs; 2) develop testing materials with the aim of producing the certification scheme; 3) e ...
Read Project

 7