Search for European Projects

11 European Projects Found

Searched on 125080 European Projects

 FINISHED 
Unlike the control and observability put in service in HV/MV, LV networks are still being substantially managed as usual: no visibility of power and voltage or grid components status, poor knowledge of connectivity, manual operation of switches or few tools for worker support. The LV grid characteristics (radial topology, exposition to local disturbances, local accumulation of distributed generati ...
Read Project

 20

 FINISHED 
As the patterns of power generation and distribution are rapidly changing in Europe towards a highly dispersed and volatile system, Distribution System Operators need to completely change traditional ways of grid operations. Currently developed solutions to increase the intelligence of medium and low voltage grids to cope with this task are often highly specialized, non-replicable and therefore no ...
Read Project

 13

 FINISHED 

IntegratinG Renewables in the EuropEaN Electricity Grid (IGREENGRID)

Start date: Jan 1, 2013, End date: Mar 31, 2016,

IGREENGrid focuses on increasing the hosting capacity for Distributed Renewable Energy Sources (DRES) in power distribution grids without compromising the reliability or jeopardizing the quality of supply. Based on the experience of six world class DRES integration Demo Projects in low & medium voltage grids (led by some of EEGI members; Distribution System operators –DSOs-) and other EU initiativ ...
Read Project

 12

 FINISHED 
Grid4EU project is an innovative SmartGrid project proposed by a group of Distribution System Operators (from Czech Republic, France, Germany, Italy, Spain and Sweden), in close partnership with a set of electricity retailers, manufacturers and research organizations.Adopting a systemic approach and organized around large-scale demonstrations networks located in six different countries, its struct ...
Read Project

 28

 FINISHED 
"The Coordination Action CAPIRE will prepare and support the realization of a Public Private Partnership (PPP) sustaining and putting into practice the European Green Cars Initiative. Its activities will be focussed on two major fields: a careful consideration of options for the aims, shape, and implementation paths a PPP, and the identification of technology roadblocks and the respective research ...
Read Project

 15

 FINISHED 

Active Demand Value ANd Consumers Experiences Discovery (ADVANCED)

Start date: Dec 1, 2012, End date: Nov 30, 2014,

Active Demand (AD) has the potential to contribute to solving the challenges of electricity systems and offers significant benefits to consumers. There are only few real AD programmes being implemented in Europe and the results of AD pilots are rather fragmented. AD is considered one of the largest untapped energy resources. The main reason behind it is insufficient consumer awareness regarding th ...
Read Project

 10

 FINISHED 
"ADDRESS will research, develop and deploy technologies and processes to increase usage of Distributed Generation and Renewable Energy Resources thereby engaging in a new relationship between customers, generators and network operators. ADDRESS aims to develop new innovative architectures for Active Distribution Networks (ADN) able to balance in real time power generation and demand allowing netwo ...
Read Project

 27

 FINISHED 
European energy industry is facing three major challenges:a) the increased integration of renewable, fluctuating power resources to achieve the climate goals,b) increased "smartness" especially in the electrical distribution grid to cope with increasing capacity requirements and finallyc) the stakeholder diversification separating grid operation, power provisioning, metering services, auxiliary se ...
Read Project

 9

 FINISHED 

Mobile Energy Resources in Grids of Electricity (MERGE)

Start date: Jan 1, 2010, End date: Dec 31, 2011,

Electric power systems are facing a major new challenge (and hence opportunity): future massive integration in the electric grid of electric plug-in vehicles (EV). Distribution and transmission grids and power system architectures still follow planning rules and procedures defined for the traditional operational paradigm. Therefore, it is necessary to identify and prepare solutions for the operati ...
Read Project

 16

 FINISHED 

Open Public Extended Network metering (OPEN meter)

Start date: Jan 1, 2009, End date: Jun 30, 2011,

New smart multi-metering or multi-functional Advanced Metering Infrastructure (AMI) is capable of creating value for energy consumers, network operators, metering operators and retailers. AMI will provide better services for customers in various ways: not only by more accurate metering and billing, but also by easing the supplier switching process and also by facilitating demand response to price ...
Read Project

 20

 FINISHED 
Development and use of Sustainable Energy sources is one of the key elements in European Research. Connecting (newly) developed Sustainable and Distributed Energy Resources to the electricity distribution networks however causes significant effects on the management of these networks. Bottlenecks are stability, security, peaks in supply & demand and overall management. Electricity storage systems ...
Read Project

 10