Search for European Projects

10 European Projects Found

Searched on 125080 European Projects

 FINISHED 

Graphene-based disruptive technologies (GrapheneCore1)

Start date: Apr 1, 2016, End date: Mar 31, 2018,

This project is the second in the series of EC-financed parts of the Graphene Flagship. The Graphene Flagship is a 10 year research and innovation endeavour with a total project cost of 1,000,000,000 euros, funded jointly by the European Commission and member states and associated countries. The first part of the Flagship was a 30-month Collaborative Project, Coordination and Support Action (CP-CS ...
Read Project

 158

 FINISHED 

Synergistic Fouling Control Technologies (SEAFRONT)

Start date: Jan 1, 2014, End date: Dec 31, 2017,

Marine biofouling, the unwanted colonization of marine organisms on surfaces immersed in seawater has a huge economic and environmental impact in terms of maintenance requirements for marine structures, increased vessel fuel consumption, operating costs, greenhouse gas emissions and spread of non-indigenous species. The SEAFRONT project will aim to significantly advance the control of biofouling a ...
Read Project

 19

 FINISHED 

Arrowhead (ARROWHEAD)

Start date: Mar 1, 2013, End date: Feb 28, 2017,

"Our society is facing both energy and competitiveness challenges. These challenges are tightly linked and require new dynamic interactions between energy producers and energy consumers, between machines, between systems, between people and systems, etc. Cooperative automation is the key for these dynamic interactions and is enabled by the technology developed around the Internet of Things and Ser ...
Read Project

 87

 FINISHED 

Automated Sorting and Recycling of Waste Lamps (ILLUMINATE)

Start date: Oct 1, 2013, End date: Sep 30, 2016,

In order to facilitate lamp waste treatment, maximize the recovery rates and improve working environment, an automated, sealed sorting unit will be required. The concept of the ILLUMINATE proposal is to develop automated systems that are able to effectively sort bulbs into different classes and remove foreign objects. This is essential for an economically viable process. The unit will be based on ...
Read Project

 9

 FINISHED 

CARBON BASED SMART SYSTEMS FOR WIRELESS APPLICATIONS (NANO RF)

Start date: Sep 1, 2012, End date: May 31, 2016,

Description New technologies and new wireless architectures identified as Beyond CMOS and More than Moore From the strategic agendas of ENIAC,EPoSS and ITRS it is evident that wireless applications are gaining more and more importance that results to new requirements in terms of miniaturization an ...
Read Project

 14

 FINISHED 

Graphene-Based Revolutions in ICT And Beyond (GRAPHENE)

Start date: Oct 1, 2013, End date: Mar 31, 2016,

This Flagship aims to take graphene and related layered materials from a state of raw potential to a point where they can revolutionize multiple industries – from flexible, wearable and transparent electronics, to new energy applications and novel functional composites.Our main scientific and technological objectives in the different tiers of the value chain are to develop material technologies fo ...
Read Project

 154

 FINISHED 
Future electronic power devices and packages will need to demonstrate more performance and functionality at reduced cost, size, weight, energy consumption and thermal budget. Further, increasing reliability demands have also to be met by industry to be competitive in this growing multi-billion Euro market of heterogeneously integrated systems.To respond to these challenges, new innovative nano- an ...
Read Project

 18

 FINISHED 

Sustainability Data Exchange Hub (SUSTAINHUB)

Start date: Feb 1, 2012, End date: Jan 31, 2015,

The present proposal contributes to improved eco efficiency in the global value chain in the electronics and automotive industries. The starting point is the rising demand for better eco-efficient products and services, provoked by public opinion, and being incorporated into legislation world wide. One leader of this movement is the European Union, but other major economic regions around the world ...
Read Project

 15

 FINISHED 
Selektope® (common name Medetomidine) has been developed to be used as a marine biocide using biological and pharmacological know-how. The compound is highly selective to a specific receptor system in invertebrates through which it stimulates swimming and consequently deters the animal from adhering to ship hulls and is effective without being lethal. The effective concentration is around 0.1% (w/ ...
Read Project

 1

 FINISHED 
The concept of NANOTEG is to solve crucial cooling and energy-management issues in transport and energy-efficient applications, based on the technical leverage enabled by highly efficient nanostructured ThermoElectric (TE) modules compatible with high volume fabrication processes. Seven relevant industrial demonstrators will be produced to create a strong impact in 4 identified application domains ...
Read Project

 16