Search for European Projects

6 European Projects Found

Searched on 125080 European Projects

 FINISHED 
Background Salt-affected soils started to form in the Hortobágy area in the Pleistocene era as mineral-rich sediments were deposited by two rivers. Later the area was cut off by the river Tisza and prolonged dry periods became normal. Since that time, large ungulates have been continuously present in the area, and thus a grass-dominated landscape with Pa ...
Read Project

 3

 FINISHED 
Background The project will target priority habitats listed in Annex I of the Habitats Directive, namely, Pannonic salt steppes and salt marshes. The salinity of the target area is increasing due to a drainage system. As water away is removed from the surface, water from deeper layers also evaporates. These habitat types are partly of natural origin and p ...
Read Project

 4

 FINISHED 
Background The soda lakes (with high concentrations of sodium carbonate) and their catchment areas in Hungary’s Carpathian Basin support lowland Pannonic loess steppic grasslands (6250). These form part of the habitat type Pannonic salt steppes and salt marshes (1530). Most of the lake and catchment sites in the Hortobágy area have been badly damaged o ...
Read Project

 4

 FINISHED 
Background The Saker falcon (Falco cherrug) is a very rare and threatened species in Europe. The total European breeding population was, until recently, estimated at 450 pairs. Hungary and Slovakia hold about 40% of this population. Therefore, the conservation of the population in the Carpathian basin in these two countries was crucial to the survival of ...
Read Project

 15

 FINISHED 
Background Even though the Hortobagy National Park continues to be one of the best places to observe steppe and wetland birds in Central Europe, its conservation status is far from assured. Land use in the area has undergone many changes since World War II. As traditional steppe grazing disappeared, plans were made to convert the abandoned steppe into a v ...
Read Project

 4

 FINISHED 
The project aimed to prepare for the availability of documentation required forthe implementation of the complex rehabilitation of the River Túr water systemso that it could be utilized, partly or entirely, for the development of the region.Therefore the funding was used for completing an environmental survey of the area,for mapping tourist attractions in connection with water flora and fauna and ...
Read Project

 6