Search for European Projects

Over 40 European Projects Found

Searched on 125080 European Projects

 FINISHED 

"City-zen, a balanced approach to the city of the future" (CITY-ZEN)

Start date: Mar 1, 2014, End date: Feb 28, 2019,

"City-zen deals with the development of the city of the future. The project has three major goals, 1- to realize more effective collaboration models and a methodology for development of smart cities, 2- to connect with industry, and have them develop technology to the benefit of smart cities and 3- to showcase to society ambitious pilot projects. Main idea for this project is that after successful ...
Read Project

 23

 FINISHED 

Consistently Optimised Resilient Secure Global Supply-Chains (CORE)

Start date: May 1, 2014, End date: Apr 30, 2018,

CORE will consolidate, amplify, extend and demonstrate EU knowledge and capabilities and international co-operation for securing supply chains whilst maintaining or improving business performance, with specific reference to key Supply Chain Corridors.CORE will be driven by the requirements of:• the Customs, law enforcement authorities, and other agencies nationally and internationally to increase ...
Read Project

 72

 FINISHED 

Benthic ecosystem fisheries Impact Study (BENTHIS)

Start date: Oct 1, 2012, End date: Sep 30, 2017,

Benthic ecosystems provide important goods and services, such as fisheries products and supporting, regulation and cultural services. There is serious concern about the adverse impact of fisheries on benthic ecosystem which may negatively affect the fisheries yield and integrity of the sea bed. To develop an integrated approach to the management of human activities in the marine environment, in pa ...
Read Project

 34

 FINISHED 

FREVUE VALIDATING FREIGHT ELECTRIC VEHICLES IN URBAN EUROPE (FREVUE)

Start date: Mar 15, 2013, End date: Sep 14, 2017,

Eight of Europe’s largest cities, will demonstrate that electric vehicles operating “last mile” freight movements in urban centres can offer significant and achievable decarbonisation of the European transport system. Demonstrators will be deployed in Amsterdam, Lisbon, London, Madrid, Milan, Oslo, Rotterdam and Stockholm. The demonstrators have been designed to ensure FREVUE covers the breadth of ...
Read Project

 30

 FINISHED 
Embedded systems are the key innovation driver to improve almost all mechatronic products with cheaper and even new functionalities. Furthermore, they strongly support today's information society as inter-system communication enabler.Consequently boundaries of application domains are alleviated and ad-hoc connections and interoperability play an increasing role. At the same time, multi-core and ma ...
Read Project

 101

 FINISHED 
BISIGODOS aims to address the production of valuable algae derived chemicals, amino acids and high added-value bio-resins for coatings, printing, food and hair care and adhesives applications, starting from algae biomass fed directly with CO2 from industrial emissions (cement, steel factory, thermal power plants, etc.) as a raw material that is cost-effective and renewable. The process is assisted ...
Read Project

 18

 FINISHED 

Self-Healing Thermal Barrier Coatings (SAMBA)

Start date: Mar 1, 2013, End date: Feb 28, 2017,

"This project deals with the creation of a new, unique self-healing thermal barrier coating (TBC) for turbines and other thermally loaded structures in order to realize a significant extension of the lifetime of critical high-temperature components. The concept is based on novel Al2O3 coated Mo-Si particles embedded in the TBC layer, typically consisting of yttria-stabilised zirconia. As the curre ...
Read Project

 9

 FINISHED 
NANOREM is designed to unlock the potential of nanoremediation and so support both the appropriate use of nanotechnology in restoring land and aquifer resources and the development of the knowledge-based economy at a world leading level for the benefit of a wide range of users in the EU environmental sector.NANOREM uniquely takes a holistic approach to examining how the potential for nanoremediati ...
Read Project

 30

 FINISHED 

Miniaturized Pressure Regulator (mPRS) (M-PRS)

Start date: Sep 23, 2013, End date: Jan 1, 2017,

The proposed project “mPRS” comprises the development of a miniaturized pressure regulation system with ultra low leakage, high reliability and an end-of-life venting capability (passivation) of tanks. Most of the space propulsion systems require a pressure regulation system (PRS) to have a constant inlet pressure of the propellant feed system. In the case of chemical propulsion systems the consta ...
Read Project

 6

 FINISHED 
The mouse shows great similarities in development, physiology and biochemistry to humans, which makes it a key model for research into human disease. The major challenges for mouse functional genomics in the 21st century are to:• Develop a series of mutant alleles for every gene in the mouse genome• Determine the phenotypic consequences of each mutation• Identify mouse models for the complete dise ...
Read Project

 24

 FINISHED 
The main aim of this project is to support the sustainable delivery of non-food biomass feedstock at local, regional and pan European level through developing strategies, and roadmaps that will be informed by a “computerized and easy to use” toolset (and respective databases) with update harmonized datasets at local, regional, national and pan European level for EU27, western Balkans, Turkey and U ...
Read Project

 34

 FINISHED 
The vision of the CISTEM project is to develop a new fuel cell (FC) based CHP technology, which is suitable for fitting into large scale peak shaving systems in relation to wind mills, natural gas and SMART grid applications. The technology should be integrated with localized power/heat production in order to utilize the heat from the FC via district heating and should deliver an electrical outpu ...
Read Project

 8

 FINISHED 
Existing test standards for biomass room heating appliances (pellet and firewood stoves, and inset appliances) have supported technology development tremendously in past decades. Due to today’s changing and more demanding requirements, however, there is the obvious need for refined testing procedures in order to differentiate between poor and excellent products. Such differentiation should take in ...
Read Project

 15

 FINISHED 

¡Que arte tienes! (How talented you are!)

Start date: Sep 1, 2014, End date: Aug 31, 2016,

This project appears because of the need to find an efficient, interesting and attractive way for our students to approach Art. As time passes, this subject has been undervalued when we actually think it could be the driving force to develop all the other subjects and knowledge. Every year we try to improve our academic results reinforcing the main subjects (Maths, Language, Science), but maybe ch ...
Read Project

 5

 FINISHED 
In recent years, traditional processors have not been able to translate the advances of silicon fabrication technology into corresponding performance gains. This has been due to weaknesses inherent in the current sequential programming model, which has not changed significantly since the late 1940's, as well as due to physical constraints, such as practical limits on the energy consumption and the ...
Read Project

 9

 FINISHED 
The project aims to develop a fully integrated, automated and user-friendly platform for infectious disease diagnosis. Malaria can be treated in just 48 hours, but delayed or false diagnosis or missing a relevant alternative cause of fever may be lethal. Therefore, other diseases with similar clinical symptoms will be investigated too. DiscoGnosis will integrate micro, nano, and bio components int ...
Read Project

 8

 FINISHED 

Optimizing Miscanthus Biomass Production - OPTIMISC (OPTIMISC)

Start date: Oct 1, 2011, End date: Mar 31, 2016,

Miscanthus is a C4 perennial rhizomatous grass that has become a leading candidate crop for production of lignocellulosic feedstocks due to its rapid biomass accumulation in temperate climates. There is currently a single commercial clone, M. x giganteus, which has a number of limitations. Research over the past 20 years has shown that a few key species and their interspecific hybrids have a high ...
Read Project

 13

 FINISHED 
The headline objective of this project is to develop a suite of advanced sensors, instrumentation and related systems in order to contribute to the development of the next generation of green and efficient gas turbine engines (AAT.2012.1.1-3&4).Sensors are a vital enabling technology for gas turbines and are critical to validation of design tools, new products, engine control, and health monitorin ...
Read Project

 16

 FINISHED 
"Recent dramatic events such as the earthquakes in Haiti and L’Aquila or the flooding in Pakistan have shown that local civil authorities and emergency services have difficulties with adequately managing crises. The result is that these crises lead to major disruption of the whole local society. The goal of ICARUS is to decrease the total cost (both in human lives and in €) of a major crisis. In o ...
Read Project

 29

 FINISHED 
"COPEWELL aims to provide a better understanding of the underpinning mechanisms and basic knowledge about the physiology, biology, and behaviour of fishes and to give a deeper understanding of the basic mechanisms involved in coping styles. We will use an innovative hypothesis-driven multidisciplinary approach that aims to explore the links between brain function, behaviour and adaptive plastici ...
Read Project

 18

 FINISHED 
The 3rd Energy Package clearly boosts the development of an Integrated European balancing mechanism. In this context, ACER has in 2011 started the development of the Framework Guidelines on Electricity Balancing.It is expected from the ACER statements that Demand Response will play significant role in the future integrated balancing market allowing Virtual Power Plants, comprising Demand Response ...
Read Project

 13

 FINISHED 

INOvative Energy MANagement System for Cargo SHIP (INOMANS²HIP)

Start date: May 1, 2011, End date: Nov 30, 2015,

The global optimization of energy systems aboard future and currently operating cargos is crucial to reduce greenhouse gas emission in a substantial and cost effective way. It is also of major economic interest in the merchant marine sector.A holistic approach considering the overall production and management of energy aboard ships (including propulsion systems and energy output optimization) is t ...
Read Project

 12

 FINISHED 

Advanced Systems for Wood Fire Protection (ReactaFire)

Start date: Nov 1, 2013, End date: Nov 30, 2015,

Wood is an important construction material (over 70% of people in the developed world live in timber frame housing) as it performs well as an engineering material and compared to other commonly used construction materials it is more sustainable. However, timber is combustible, unlike concrete or steel, and this has significant implications for how it is used within the construction industry as the ...
Read Project

 8

 FINISHED 

Authentication and Authorisation for Entrusted Unions (AU2EU)

Start date: Dec 1, 2013, End date: Nov 30, 2015,

The aim of the AU2EU project is to implement and demonstrate in a real-life environment an integrated eAuthentication and eAuthorization framework to enable trusted collaborations and delivery of services across different organizational/governmental jurisdictions. Consequently, the project aims at fostering the adoption of security and privacy-by-design technologies in European and global markets. ...
Read Project

 13

 FINISHED 
INSTANT will face the challenge of the detection, identification and quantification of engineered nanoparticles (ENPs) in complex matrices such as cosmetic products and engineered food and drinks. Therefore, new detection methods and technologies are mandatory. This is completely in line with the Call FP7-NMP.2011.1.3-1 which deals especially with innovative, practically implementable and cost eff ...
Read Project

 11

 FINISHED 

European Clusters for Offshore Wind Servicing (ECOWINDS)

Start date: Nov 1, 2012, End date: Oct 31, 2015,

The European Clusters for Offshore Wind Servicing (ECOWindS) project builds on existing network within offshore wind energy to establish cluster cooperation in Offshore Wind Servicing (OWS) encompassing the industrial processes; assembly and installation of offshore wind turbines and operation and maintenance of wind turbines offshore.ECOWindS is a collaboration between research-driven clusters fr ...
Read Project

 7

 FINISHED 
The future in manufacturing is oriented to more flexible and adaptable systems. Customization is also a great challenge and a way of giving added value to the products. And aesthetic personalization is one of the main ways for achieving customization.UV-Marking project aims at demonstrating that unitary customization (individual configurations/designs of each customer) is possible, by developing a ...
Read Project

 12

 FINISHED 

EERA Design Tools for Offshore Wind Farm Cluster (EERA-DTOC)

Start date: Jan 1, 2012, End date: Jun 30, 2015,

The European Energy Research Alliance (EERA) together with some high-impact industry partners addresses the call proposing an integrated and validated design tool combining the state-of-the-art wake, yield and electrical models available in the consortium, as a plug-in architecture with possibility for third party models. To decrease uncertainties around wind farm wake predictions, a small measur ...
Read Project

 23

 FINISHED 
The use of High Performance Computing (HPC) is commonly recognized a key strategic element both in research and industry for an improvement of the understanding of complex phenomena. The constant growth of generated data - Big Data - and computing capabilities of extreme systems lead to a new generation of computers composed of millions of heterogeneous cores which will provide Exaflop performance ...
Read Project

 21

 FINISHED 
While nanotechnology was originally limited to small areas of a few cm2, the quest for lower costs has been the latest years the drive for developing processes utilising larger substrate sizes at increasing throughputs. A typical example is the flat panel display industry where the push to larger gen size and faster processing has resulted in a significant cost reduction. The next challenge here i ...
Read Project

 18

 FINISHED 
The Biowalk4Biofuels Project aims to develop an alternative and innovative system for biowaste energy recovery and use of GHG emissions to produce biofuels, using macroalgae as a catalyser, in a multidisciplinary approach. The objectives of the project are: production of a cost-efficient biogas without using cereal crops; optimise the production of biogas per amount of biowaste and CO2 used, with ...
Read Project

 12

 FINISHED 
ICT 4 EVEU is a project born with the aim of deploying an innovative set of ICT services for electric vehicle (EV) in different and complementary pilots across Europe. The scope of the ICT services is the integration of different management systems operating on the existing EV infrastructures in the cities where the pilots will be run, so that related services are deployed making use of these inte ...
Read Project

 17

 FINISHED 

Status and Trends of European Pollinators (STEP)

Start date: Feb 1, 2010, End date: Jan 31, 2015,

Pollinators form a key component of European biodiversity, and provide vital ecosystem services to crops and wild plants. There is growing evidence of declines in both wild and domesticated pollinators, and parallel declines in plants relying upon them. STEP will document the nature and extent of these declines, examine functional traits associated with particular risk, develop a Red List of some ...
Read Project

 22

 FINISHED 

3DTV Content Search (3DTVS)

Start date: Nov 1, 2011, End date: Jan 31, 2015,

Description 3DTVS deals with algorithms and techniques for the analysis, indexing and browsing of 3D television content so that it can be efficiently annotated, stored, searched and retrieved in 3D audiovisual ar 3D video content is already being accumulated in 3D television (3DTV) broadcasters an ...
Read Project

 7

 FINISHED 
The objective of PARCIVAL is to develop an integrated and automated multi-analyte lab-on-a-disk platform for the fast and reliable sample in -> answer out diagnosis of highly infectious respiratory pathogens, resistance patterns and biomarkers for individual severity of the infection. The platform format will be based on completely integrated microfluidic foil-disposables. The disposables will fea ...
Read Project

 9

 FINISHED 
"Decompression sickness (DCS) is caused by circulating inert gas bubble formation in blood vessels and tissues resulting from supersaturation during inadequate decompression. It is an acknowledged risk of situations involving variations in ambient pressure, such as space flight and extravehicular activity, exposure to altitude, hyperbaric tunnelling intervention, as well as recreational and commer ...
Read Project

 10

 FINISHED 

Electromobility solutions for cities and regions (ELMO`s)

Start date: Dec 1, 2011, End date: Nov 30, 2014,

The overall goal of the proposed project is to promote more sustainable transport through the development of electromobility solutions for cities and regions (ELMOS). The projects aims at delivering concepts for a better exchange of electromobility knowledge at regional and EU level, concepts for new business models and for cross-border field tests which should lead to an improved standardisation ...
Read Project

 10

 FINISHED 

Bridge Safety Monitoring (BRIDGEMON)

Start date: Dec 1, 2012, End date: Nov 30, 2014,

Much of the world’s bridges are old and need to be periodically repaired or replaced. However, premature replacement wastes money and non-renewable resources. BridgeMon is led by three SMEs who are working to extend the lives of existing bridges. They will develop bridge monitoring technologies to prove they are safe and can be kept in service for longer, thus ensuring more sustainable road asset ...
Read Project

 6

 FINISHED 
The objective of PRACTICE project is to improve the preparedness and resilience of the EU member states and associated countries to an attack from a terrorist group using non conventional weapons such as CBRN (Chemical, Biological, Radiological and/or Nuclear agents) materials. The existing situation is characterized by a fragmented structure as regards technology, procedures, methods and organiza ...
Read Project

 28

 FINISHED 
The goals of the SuperCleanQ project are to develop quality control and quality assurance tools and procedures for plastics recycling processes targeted at food contact applications to enable SMEs to conform to Commission Regulation EC 282/2008 on recycled plastic materials and articles intended to come into contact with foods. Thetools will be applied to a new process for the recycling of coloure ...
Read Project

 12