Search for European Projects

9 European Projects Found

Searched on 125080 European Projects

 FINISHED 
Pentagon is a 3-years research and innovation project that will investigate the potential of wider deployment of energy conversion technologies and strategies at district-level, with the aim to foster flexibility in the low-voltage and medium-voltage grid. The rationale that underlies Pentagon approach is that multi-vector smart districts can be the key enablers of future smart grids, provided the ...
Read Project

 10

 FINISHED 

Solar Heat Integration Network (SHINE)

Start date: Oct 1, 2013, End date: Sep 30, 2017,

Large solar heating systems are decisive to cover a major part of European low temperature heat demand by solar energy and therewith to meet European policy aims. However, today only a negligible share of solar heating systems installed in Europe are large units due to manifold technical and socio-economic obstacles. The challenge of solar thermal technology and the overall objective of the propos ...
Read Project

 11

 FINISHED 

Engine Breakthrough Components and Subsystems (E-BREAK)

Start date: Oct 1, 2012, End date: Mar 31, 2017,

Future aero engines will need to be more efficient and contribute to the reduction on environmental impact of air transportation. They must reach some standards of performance by reducing emissions and creating some savings on operation costs.EIMG consortium has launched since several years some initiatives to develop future engines in the frame of the European Committee research programmes.Within ...
Read Project

 48

 FINISHED 

FREsnel for Solar Heat with New Receiver and Geometry (FRESH NRG)

Start date: Mar 1, 2013, End date: Aug 31, 2016,

FRESH NRG will target efficiency of 60% at 250°C with a Linear Fresnel Collector (LFC) optimized for industrial use. Our integrated approach will design, implement and test disruptive innovations in 4 key parts of the value chain.Highly innovative sol-gel coatings will target robustness, durability and performance (transmittance >96%, absorbtivity >95%, emissivity250°C 90 to limit heat losses. Ult ...
Read Project

 7

 FINISHED 
In recent years, traditional processors have not been able to translate the advances of silicon fabrication technology into corresponding performance gains. This has been due to weaknesses inherent in the current sequential programming model, which has not changed significantly since the late 1940's, as well as due to physical constraints, such as practical limits on the energy consumption and the ...
Read Project

 9

 FINISHED 
The COMTES project has as goal to develop and demonstrate three novel systems for compact seasonal storage of solar thermal energy. These systems will contribute to the EU 20-20-20 targets by covering a larger share of the domestic energy demand with solar thermal energy.Main objective of COMTES is to develop and demonstrate systems for seasonal storage that are significantly better than water bas ...
Read Project

 11

 FINISHED 
The objective of this project is to develop new innovative products and advanced test methods for a next generation of compact combined renewable energy systems based on solar thermal and heat pump technology for space heating and hot water preparation, using breakthroughs in ICT, new materials and technology. The goal is to achieve 25% energy savings compared to current state of the art systems, ...
Read Project

 9

 FINISHED 

Solar Collectors made of Polymers (SCOOP)

Start date: Dec 1, 2011, End date: May 31, 2015,

The international solar thermal market has progressed strongly over the last years. Especially in China, the USA and Europe, the manufacturing and commissioning of installations has grown rapidly. The major share of worldwide installed solar-thermal collectors consists of vacuum tube and glazed flat plate collectors. Both types are currently produced by time-consuming and cost-intensive manufactur ...
Read Project

 13

 FINISHED 

Development of an optimized large scale engine CFRP annulus filler (ORCA)

Start date: Aug 23, 2010, End date: Feb 22, 2013,

"This proposal describes the effort planned by the partners FACC AG, Austria & University of applied sciences (UAS) Rapperswil, Switzerland, for the development of a CFRP annulus filler.Production process will be an advanced preform concept with folding techniques and integration of all connection parts, injected with resin by an improved RTM process.Part development will start with material tests ...
Read Project

 2