Search for European Projects

Over 40 European Projects Found

Searched on 125080 European Projects

 FINISHED 

LIFE FLOODPLAIN AMPHIBIANS (LIFE Auenamphibien)

Start date: Jan 1, 2016, End date: Dec 31, 2023,

Background The ongoing decline of amphibian species is especially severe in Central and Northern Europe, particularly those species listed in Annex II and IV of the Habitats Directive. This is due to habitat destruction and degradation, mainly driven by the intensification of land use over recent decades. In some regions, more than 90% of reproduction po ...
Read Project

 3

 FINISHED 
Background The Eurasian lynx (lynx lynx carpathicus) disappeared from the Rhineland-Palatinate area in the 18th century. Nowadays the closest population of lynx to the Pfälzerwald/Palatinate Forest is a French population in the southern Vosges. Monitoring in the Pfälzerwald has periodically identified individual lynxes. These are expected to originate ...
Read Project

 6

 FINISHED 

Internet of Food and Farm 2020 (IoF2020)

Start date: Jan 1, 2017, End date: Dec 31, 2020,

The IoF2020 project is dedicated to accelerate adoption of IoT for securing sufficient, safe and healthy food and to strengthen competitiveness of farming and food chains in Europe.It will consolidate Europe’s leading position in the global IoT industry by fostering a symbiotic ecosystem of farmers, food industry, technology providers and research institutes.The IoF2020 consortium of 73 partners, ...
Read Project

 72

 FINISHED 
Cooling systems for Computing & Data Centres consume 30% to 40% of energy delivered into the centre spaces, while electricity use in CDCs represents 1.3% of the world total energy consumption. The traditional vapour compression cooling systems for CDCs are neither energy efficient nor environmentally friendly. Several alternative cooling systems, e.g., adsorption/absorption, ejector, and evaporati ...
Read Project

 9

 FINISHED 

1D Nanofibre Electro-Optic Networks (1D-Neon)

Start date: Apr 1, 2016, End date: Mar 31, 2020,

The vision of 1D-NEON proposal is to develop fibre-based smart materials along with an integrated technology platform for the manufacturing in Europe of new products with multi-sectorial applications in consumer electronics, energy, healthcare and fitness, smart buildings, sensors and e-skin for soft robotics.The overall objective of 1D-NEON is to build a modular platform for manufacturing fibre-b ...
Read Project

 14

 FINISHED 
Implementing cryptography on embedded devices is an ongoing challenge: every year new implementation flaws are discovered and new attack paths are being used by real life adversaries. Whilst cryptography can guarantee many security properties, it crucially depends on the ability to keep the used keys secret even in face of determined adversaries. Over the last two decades a new type of adversary h ...
Read Project

 6

 FINISHED 
The assurance of security, privacy, reliability and safety features is key-point to unlock the enormous potential that the connected vehicles systems paradigm i.e., the dynamic Cyberphysical system of highly-equipped infrastructure-connected vehicles with numerous third-party components, can offer towards safer transportation. The emerging systems expose a variety of wireless-communication and har ...
Read Project

 9

 FINISHED 

Scalable Linking and Integration of Big POI data (SLIPO)

Start date: Jan 1, 2017, End date: Dec 31, 2019,

POIs are the content of any application, service, and product even remotely related to our physical surroundings. From navigation applications, to social networks, to tourism, and logistics, we use POIs to search, communicate, decide, and plan our actions. The Big Data assets for POIs and the evolved POI value chain introduced opportunities for growth, but also complexity, intensifying the challen ...
Read Project

 6

 FINISHED 

Legal Actions on Clean Air (LIFE Legal Actions)

Start date: Aug 1, 2016, End date: Nov 30, 2019,

...ing. EU citizens have a right to clean air. The European Commission has begun infringement proceedings against 16 Member States for non-compliance with the Air Quality Directive and has given Germany and the Czech Republic a final warning for exceeding PM10 limit values. Where limit values are breached, individuals directly affected have the right to demand that action is taken and the Aarhu ...
Read Project

 2

 FINISHED 

QROWD - Because Big Data Integration is Humanly Possible (QROWD)

Start date: Dec 1, 2016, End date: Nov 30, 2019,

Big Data integration in European cities is of utmost importance for municipalities and companies to offer effective information services, enable efficient data-driven transportation and mobility, reduce CO2 emissions, assess the efficiency of infrastructure, as well as enhance the quality of life of citizens. At present this integration is substantially limited due to the following factors: 1) Urb ...
Read Project

 8

 FINISHED 
The OPENHYBRID project will overcome the technical and commercial barriers of current hybrid manufacturing systems to deliver a single manufacturing system capable of undertaking a wider range of processes in a seamless automated operation. The new system will offer unrivalled flexibility in terms of materials, including the ability to switch between powder and wire feed-stock within a single part ...
Read Project

 14

 FINISHED 

NeMo : Hyper-Network for electroMobility (NeMo)

Start date: Oct 1, 2016, End date: Sep 30, 2019,

Electromobility is a major factor towards transport decarbonisation. However a number of challenges (limited charging options, lack of interoperability, absence of a unified identification/payment process, energy grid overload, expensive charging tariffs) limit the potential for interoperable and seamless electromobility services to a wider of actors and geographic area, hindering electromobility ...
Read Project

 19

 FINISHED 

ENgineering COMPASS (ENCOMPASS)

Start date: Oct 1, 2016, End date: Sep 30, 2019,

The ENCOMPASS project principally aims to create a fully digital integrated design decision support (IDDS) system to cover the whole manufacturing chain for a laser powder bed fusion (L-PBF) process encompassing all individual processes within in. The ENCOMPASS concept takes a comprehensive view of the L-PBF process chain through synergising and optimising the key stages. The integration at digita ...
Read Project

 11

 FINISHED 
In 2015, 1 321 560 refugees claimed asylum in EU, out of which 292 540 applications were approved (Eurostat). The number of women refugees is increasing rapidly, as of 15 January 2016, just over 55 per cent of those arriving are women and children, as compared to only 27 per cent in June 2015 (UNHCR). At the same time, migrant female unemployment and social exclusion remains one of the main socioe ...
Read Project

 7

 FINISHED 
The main objective of this Project is the development of a methodology and ICT tools which will allow an advanced simulation of intermodal railway logistics platforms models in order to support tasks related to both design and planning phases.Using the combination of demand/economic/capacity models as main inputs, an evaluation of scenarios will be possible by means of the comparison of an underly ...
Read Project

 14

 FINISHED 

Managing Automated Vehicles Enhances Network (MAVEN)

Start date: Sep 1, 2016, End date: Aug 31, 2019,

Highly automated vehicles and cooperative ITS technology will get more and more present in the near future. By combining both, guidance of (groups of) such vehicles can considerably improve especially in urban areas. For management of automated vehicles at signalized intersection and corridors, the MAVEN (Managing Automated Vehicles Enhances Network) project will develop infrastructure-assisted pl ...
Read Project

 9

 FINISHED 

Transforming Transport (TT)

Start date: Jan 1, 2017, End date: Jun 30, 2019,

Big Data will have a profound economic and societal impact in the mobility and logistics sector, which is one of the most-used industries in the world contributing to approximately 15% of GDP. Big Data is expected to lead to 500 billion USD in value worldwide in the form of time and fuel savings, and savings of 380 megatons CO2 in mobility and logistics. With freight transport activities projected ...
Read Project

 48

 FINISHED 
ENABLE-S3 will pave the way for accelerated application of highly automated and autonomous systems in the mobility domains automotive, aerospace, rail and maritime as well as in the health care domain. Virtual testing, verification and coverage-oriented test selection methods will enable validation with reasonable efforts. The resulting validation framework will ensure Europeans Industry competiti ...
Read Project

 76

 FINISHED 
This proposal is in response to the call for International Cooperation in Aeronautics with China, MG-1.10-2015 under Horizon 2020 “Enhanced Additive Manufacturing of Metal Components and Resource Efficient Manufacturing Processes for Aerospace Applications”. The objectives are to develop the manufacturing processes identified in the call: (i) Additive manufacturing (AM); (ii) Near Net Shape Hot I ...
Read Project

 12

 FINISHED 

Optimised Energy Management and Use (OPTEMUS)

Start date: Jun 1, 2015, End date: Feb 28, 2019,

Optimised energy management and use (OPTEMUS) represents an opportunity for overcoming one of the biggest barriers towards large scale adoption of electric and plug-in hybrid cars: range limitation due to limited storage capacity of electric batteries.The OPTEMUS project proposes to tackle this bottleneck by leveraging low energy consumption and energy harvesting through a holistic vehicle-occupan ...
Read Project

 15

 FINISHED 

Industrial optimal design using adjoint CFD (IODA)

Start date: Jan 1, 2015, End date: Dec 31, 2018,

Adjoint-based methods have become the most interesting approach in numerical optimisation using Computational Fluid Dynamics (CFD) due to their low computational cost compared to other approaches. The development of adjoint solvers has seen significant research interest, and a number of EC projects have been funded on adjoint-based optimisation. In particular, partners of this proposal are member ...
Read Project

 10

 FINISHED 

MinWaterCSP - Minimized water consumption in CSP plants (MinWaterCSP)

Start date: Jan 1, 2016, End date: Dec 31, 2018,

MinWaterCSP addresses the challenge of significantly reducing the water consumption of CSP plants while maintaining their overall efficiency. Its objective is to reduce evaporation losses and mirror cleaning water usage for small- and large-scale CSP plants through a holistic combination of next generation technologies in the fields of i) hybrid dry/wet cooling systems ii) wire structure heat tran ...
Read Project

 12

 FINISHED 
The COSMICC consortium gathers key industrial and research partners with world-leading positions in the fields of Silicon photonics, CMOS electronics, Printed Circuit Board-Packaging, Optical transceivers and Data-Centers around a strong vision: mass commercialization of Si-photonics-based transceivers is possible starting in 2019 by enhancing the existing photonic integration platform of one of t ...
Read Project

 11

 FINISHED 
The European footwear sector continues growing steadily, being responsible for the 4% of the worldwide footwear production, employing more than 260.000 people distributed by approximately 25.000 companies, mainly SMEs, adopting a development strategy based on higher quality of products and services, flexibility and short time to market, product differentiation and added value. Consumption will con ...
Read Project

 13

 FINISHED 
NEXTRUST objective is to increase efficiency and sustainability in logistics by developing interconnected trusted collaborative networks along the entire supply chain. These trusted networks, built horizontally and vertically, will fully integrate shippers, LSPs and intermodal operators as equal partners. To reach a high level of sustainability, we will not only bundle freight volumes, but shift t ...
Read Project

 31

 FINISHED 

Coordination of Automated Road Transport Deployment for Europe (CARTRE)

Start date: Oct 1, 2016, End date: Sep 30, 2018,

Automated Road Transport (ART) is seen as one of the key technologies and major technological advancements influencing and shaping our future mobility and quality of life. The ART technology encompasses passenger cars, public transport vehicles, and urban and interurban freight transport and also extends to the road, IT and telecommunication infrastructure needed to guarantee safe and efficient op ...
Read Project

 36

 FINISHED 
...stitutions of informal adult education is required.It is therefore the objective of the project "Something better" to improve the quality of the informational and educational offer at Animal Equality Germany (AEG) through the qualification of staff especially in the areas of 1. information offer and campaigns, 2. volunteer work and 3. management. Furthermore, networking activities should also lead ...
Read Project

 5

 FINISHED 

Mobilità transnazionale per il settore del TErmale e del BEnessere

Start date: Dec 1, 2016, End date: May 31, 2018,

CONTEXT AND BACKGROUND OF THE PROJECT. Italy is the European country with the largest number of spas thanks to its unique geology volcanic phenomena. In fact the spa and wellness tourism in Italy host 4.2% of tourists in hotels or other types of accommodation, that means 15 million people every year. If we analyze the human capital skill in the sector, we understand that the demand for the prof ...
Read Project

 16

 FINISHED 

Vocational Education and Training to Excellence 2016

Start date: Jun 1, 2016, End date: May 31, 2018,

The Förderverein WorldSkills Liechtenstein fosters the dual vocational training system in Liechtenstein. It gets involved in the organisation for the vocational training competitions and announces the merits of the young professionals in public. The follow-up project VET Excellence 2016 aims for an extension of the trainers know-how and vocational education and training of the young talents on int ...
Read Project

 5

 FINISHED 

DEMETER

Start date: Sep 15, 2014, End date: Mar 15, 2018,

Title: Deep Submicron System on Chip (SoC) pilot line demonstration for harsh environment applications in Europe300mm wafers manufacturing and 65nm technology for space developed by STm, are a worldwide leading item. The European Space Community needs high complexity radiation-hardened reprogrammable FPGAs allowing dynamic partial reconfiguration (DPR) and providing state of the art, tamper proof, ...
Read Project

 14

 FINISHED 
...t challenge is to involve children at a meaningful level, but only a few of the coalitions have mechanisms in place that ensure the active participation of children in their work.The NCs of Austria, Germany and Switzerland want to build a strategic Partnership (from September 2016 until February 2018) to exchange best-practices in children´s participation. This partnership will strengthen the tran ...
Read Project

 3

 FINISHED 

Empowering Agribusiness Training in Emilia 2

Start date: Dec 1, 2016, End date: Feb 28, 2018,

...ectives and with a portfolio of validated skills and experiences in a clear, recognizable and readable way.The foreseen destination countries are: Spain, Malta, UK, Ireland, Portugal, Germany, Netherlands and France.
Read Project

 47

 FINISHED 
Auctions, as a competitive and market-based mechanism, are on the verge of becoming a prevailing feature in support policies for renewable energy in Europe. A comprehensive assessment of auctions and their suitability for renewable support in Europe is urgently needed to facilitate their successful design and cost-efficient implementation. Auctions have the potential to significantly improve the p ...
Read Project

 8

 FINISHED 

Zusammenleben mitgestalten - Jugendliche Perspektiven auf Europa

Start date: Nov 1, 2016, End date: Oct 31, 2017,

"Shape coexistance" will be the topic of the Modell Europa Parlament Deutschland 2017 in Berlin. About 150 pupils of year 9 and 10, from all 16 German states will come to Berlin for 6 days in February 2017. Within the frame of the "Structured dialogue" the project is centered around the development and immersion of political participation, focusing on youth empowerment. We will focus on political ...
Read Project

 1

 FINISHED 

SHOES MADE in EU: The European Shoemaker

Start date: Oct 1, 2015, End date: Sep 30, 2017,

...ng tradition in the sector, both at vocational and economic level. To achieve this goal the project will develop the following actions: - Define the new curriculum by sharing the experiences of Germany, Portugal and Poland, enhancing each other - Introduce training contents according to labor market needs and updated with the most innovative technological tools available; - Define a training mod ...
Read Project

 8

 FINISHED 

European Vocational Placements in Tourism, Trade and IT 2016

Start date: Oct 1, 2016, End date: Sep 30, 2017,

...cements (in hotels at different departments). The host’s programme coordinator will mentor the students.This programme extends to four other institutions: 4 four-start hotels in Germany, a coordinating team in Ireland placing the students into hotels (as apprentices) and a luxury hotel in Ireland.Our partners play significant role in organizing several elements of this programme, such as transfe ...
Read Project

 5

 FINISHED 

Datacenter EURECA Project (EURECA)

Start date: Mar 1, 2015, End date: Aug 31, 2017,

The EURECA project tackles the lack of knowledge and awareness of how to identify and procure environmentally sound and greener data centres. The work will encompass solutions for pre-commercial procurement (PCP) and procurement of innovative solutions (PPI). This will be achieved by consolidating recognised and emerging benchmark criteria into an easy-to-use tool that can be deployed by non-expe ...
Read Project

 9

 FINISHED 
Embedded systems are the key innovation driver to improve almost all mechatronic products with cheaper and even new functionalities. Furthermore, they strongly support today's information society as inter-system communication enabler.Consequently boundaries of application domains are alleviated and ad-hoc connections and interoperability play an increasing role. At the same time, multi-core and ma ...
Read Project

 101

 FINISHED 

Innovative ECVET Tour in Europe

Start date: Jun 1, 2016, End date: May 31, 2017,

...he appropriate partners who accepted to test our ECVET-based European standard learning achievements.The current application promotes the mobility of students of hospitality-tourism and health care.Germany:- 2 students of class 13-14 will be sent to Berlin and Dresden to do their hotel internship- 4 students of class 13 will be sent to Osterode to do their nursing internship- 10 students of class ...
Read Project

 6

 FINISHED 

KTS und Europa...ein Mehrwert fürs Leben! (2016)

Start date: Jun 1, 2016, End date: May 31, 2017,

The present project deals with the implementation of internships of persons in initial vocational training in the following countries : Germany , Great Britain, Spain, Portugal, Italy, Malta, Ireland and Turkey.The participants in this project attend the Carinthian Tourism School Warmbad Villach, which offers three types of schools : HFS (3 years), HLT (5 years) and a College (4 semesters ). The ...
Read Project

 14