Search for European Projects

16 European Projects Found

Searched on 125080 European Projects

 FINISHED 
Scientific understanding of the role and mechanisms of bioactives is fragmented. Research often addresses the theoretical possibility of health improvement effects rather than their real, practical use for everyday diets. Bioactives cannot be considered as discrete chemical compounds and research must focus on bioactive-enriched foods (BEF), if consumer demands for foods delivering appropriate hea ...
Read Project

 28

 FINISHED 

ACTive Implant for Optoacoustic Natural sound enhancement (ACTION)

Start date: Oct 1, 2013, End date: Sep 30, 2016,

The ACTION project builds on the recent discovery that relatively low levels of pulsed infrared laser light are capable of triggering activity in hair cells of the partially hearing (hearing impaired) cochlea and vestibule. So far the excessively large volume of optical fibre systems and external light sources used for animal studies prevented the practical use of this discovery for long term anim ...
Read Project

 7

 FINISHED 
The FIBRA network has as main target to link the research and development activities for fibre crop innovations carried out by universities and institutions in both EU and China. This proposal is set up to promote the communication between experts about the key issues of fibre crop production, processing and application, while attention towards quality and efficiency improvement, and product diver ...
Read Project

 18

 FINISHED 
Metabolomics is an important phenotyping technique for molecular biology and medicine. It assesses the molecular state of an organism or collections of organisms through the comprehensive quantitative and qualitative analysis of all small molecules in cells, tissues, and body fluids. Metabolic processes are at the core of physiology. Consequently, metabolomics is ideally suited as a medical tool t ...
Read Project

 16

 FINISHED 
Carbon Capture and Sequestration has become an important technology to comply with the CO2 reduction targets set by the EC. However CCS has the drawback that the electrical efficiency of the coal fired power plant will drop significantly. To overcome this drawback, one has to increase the base efficiency of the power plant or increase the biomass co-firing share as this is a CO2 neutral energy sou ...
Read Project

 15

 FINISHED 

Metagenomics for bioexploration - Tools and application (METAEXPLORE)

Start date: May 1, 2009, End date: Apr 30, 2014,

"This proposal will (further) develop and apply metagenomics tools to access the enzymatic potential borne in the cryptic biota of selected natural habitats, in particular target soil-related and aquatic ones. In the light of the environmental relevance of chitins and lignins (as natural compounds recalcitrant to degradation) and halogenated aliphatic and aromatic compounds (anthropogenic recalcit ...
Read Project

 17

 FINISHED 

Biocommodity refinery (BIOCORE)

Start date: Mar 1, 2010, End date: Feb 28, 2014,

"BIOCORE will create and demonstrate create a lignocellulosic biorefinery for sustainable processing of agricultural residues (wheat and rice straws), SRC wood (poplar) and hardwood forestry residues, into 2G biofuels, bulk chemicals, polymers, speciality molecules, heat and power. To reach this overall objective, BIOCORE will: 1) Describe how a mixed lignocellulosic feedstock-based biorefinery ca ...
Read Project

 26

 FINISHED 
"The European Sustainable Nuclear Industrial Initiative was launched in November 2010 to anticipate the development a fleet of fast reactors with closed cycle. Three fast neutron technologies have been selected:• the Sodium cooled Fast Reactor with the ASTRID prototype• the Lead cooled Fast Reactor with the ALFRED demonstrator which will be preceded by a pilotplan MYRRHA• the Gas cooled Fast Rea ...
Read Project

 22

 FINISHED 
High volume automotive production (such as body-in-white construction) operations rely heavily on RSW (resistance spot welding), and suffer significant losses of output (and resulting revenue) as a consequence of frequent production line stoppages. These stoppages are predominantly caused by weld quality issues, which in turn arise from poor maintenance of consumable ‘tips’ on RSW guns.SmartDress ...
Read Project

 7

 FINISHED 

Intelligent and Customized Tooling (IC2)

Start date: Oct 1, 2010, End date: Sep 30, 2013,

Intelligent and Customized Tooling (IC2) addresses the need for new technology and organizational models for the tooling industry. By developing a technological foundation and organizational models for intelligent tooling systems customized for user’s needs, the European tooling industry can increase competitiveness trough knowledge intensive tooling and increased customer value. IC2 will be a mul ...
Read Project

 17

 FINISHED 
The NEMO project provides novel efficient enzymes and microbes for 2nd generation bioethanol production. It generates through metabolic engineering and mutagenesis & screening approaches robust yeast strains that have a broad substrate range and can (co-)ferment C6 and C5 sugars to ethanol with high productivity (rate and yield), and that are significantly more stress tolerant, i.e. inhibitor, eth ...
Read Project

 21

 FINISHED 

Severe Accident Research Network of Excellence 2 (SARNET2)

Start date: Apr 1, 2009, End date: Mar 31, 2013,

Most of the actors involved in severe accident research in Europe, plus Canada, Korea and the United States (41 partners), will network in SARNET2 (Severe Accident Research NETwork of Excellence - Phase 2) their capacities of research in order to resolve important pending issues on postulated severe accidents of existing and future Nuclear Power Plants (NPPs). The project has been defined in order ...
Read Project

 45

 FINISHED 
Biomass production costs are low in Brazil compared to other parts of the world, due to proper climate and advanced forest and agricultural technologies. The productivities of elephant grass (Pennisetum spp; 30-45 t/ha/yr bone dry) and eucalypt crops (20-30 t/ha/yr bone dry) in Brazil are amongst the world largest, with good perspectives of growing even further. Thus, Brazil presents great potenti ...
Read Project

 6

 FINISHED 
"The production of fine and industrial chemicals and bioactive compounds based on renewable, naturally occurring raw materials has become an exciting research topic, but so far only few studies concern side products of the forest industry. We will focus on bark and on peat. Bark is a high-volume waste product, currently largely unutilised as a raw material. Northern Europe and Russia have abundant ...
Read Project

 9

 FINISHED 

NUclear Reactor Integrated Simulation Project (NURISP)

Start date: Jan 1, 2009, End date: Jun 30, 2012,

The target of the proposed NURISP Collaborative Project is to make new and significant steps towards a European Reference Simulation Platform for applications relevant to present PWR and BWR and to future reactors. The roadmap of this Simulation Platform will be proposed to be part of the future Strategic Research Agenda of the Sustainable Nuclear Energy Technology Platform (SNE-TP). The first st ...
Read Project

 23

 FINISHED 
Biocomposites manufactured from natural materials such as fibres and bioderived polymers offer a sustainable alternative to traditional ones, but at present they are not available for use in structural applications. NATEX will develop aligned textiles from natural fibres suitable for use as high strength reinforcing fabrics to produce structural composite parts using bio and oil based thermoplasti ...
Read Project

 19