Search for European Projects

Over 40 European Projects Found

Searched on 125080 European Projects

 FINISHED 

A Systems medicine approach to chronic inflammatory disease (SYSCID)

Start date: Jan 1, 2017, End date: Mar 31, 2022,

"The SYSCID consortium aims to develop a systems medicine approach for disease prediction in CID. We will focus on three major CID indications with distinct characteristics, yet a large overlap of their molecular risk map: inflammatory bowel disease, systemic lupus erythematodes and rheumatoid arthritis. We have joined 15 partners from major cohorts and initiatives in Europe (e.g.IHEC, ICGC, Twins ...
Read Project

 16

 FINISHED 

GALAXY: Gut-and-liver axis in alcoholic liver fibrosis (GALAXY)

Start date: Jan 1, 2016, End date: Dec 31, 2021,

Alcohol overuse is an important societal challenge with annual healthcare costs of over €22 billion in Europe. Alcohol is the main cause of liver cirrhosis, which is the 5th and 7th most common cause of life years lost in respectively Eastern and Western Europe. Cirrhosis is considered irreversible but its precursor, liver fibrosis, is reversible when detected before disease progression. GALAXY pr ...
Read Project

 12

 FINISHED 
The SeaDataNet pan-European infrastructure has been developed by NODCs and major research institutes from 34 countries. Over 100 marine data centres are connected and provide discovery and access to data resources for all European researchers. Moreover, SeaDataNet is a key infrastructure driving several portals of the European Marine Observation and Data network (EMODnet), initiated by EU DG-MARE ...
Read Project

 57

 FINISHED 
Arctic climate change increases the need of a growing number of stakeholders for trustworthy weather and climate predictions, both within the Arctic and beyond. APPLICATE will address this challenge and develop enhanced predictive capacity by bringing together scientists from academia, research institutions and operational prediction centres, including experts in weather and climate prediction and ...
Read Project

 16

 FINISHED 
Knowledge regarding the complex interplay between agricultural land use and management and soil quality and function is fragmented and incomplete, in particular with regard to underlying principles and regulating mechanisms. The main aim of iSQAPER is to develop an interactive soil quality assessment tool (SQAPP) for agricultural land users that integrates newly derived process understanding and a ...
Read Project

 25

 FINISHED 

European Nuclear Science and Application Research 2 (ENSAR2)

Start date: Mar 1, 2016, End date: Feb 29, 2020,

ENSAR2 is the integrating activity for European nuclear scientists who are performing research in three of the major subfields defined by NuPECC: Nuclear Structure and Dynamics, Nuclear Astrophysics and Nuclear Physics Tools and Applications. It proposes an optimised ensemble of Networking (NAs), Joint Research (JRAs) and Transnational Access Activities (TAs), which will ensure qualitative and qua ...
Read Project

 31

 FINISHED 
... The project is based on an integrative multi-actor approach, from cultivation techniques to molecular studies, aiming the development and validation of a range of tools to improve competitiveness of European berry production, and eventually the attraction and confidence of consumers. The selection of the model species can be considered as strategic since strawberry is the most important berry cro ...
Read Project

 19

 FINISHED 
The goal of GenTree is to provide the European forestry sector with better knowledge, methods and tools for optimising the management and sustainable use of forest genetic resources (FGR) in Europe in the context of climate change and continuously evolving demands for forest products and services. To reach its goal, GenTree will make scientific, technological and implementation breakthroughs in: ( ...
Read Project

 22

 FINISHED 
The Research Infrastructure (RI) ACTRIS – Aerosols, Clouds and Trace Gases - is the pan-European RI that consolidates activities amongst European partners for observations of aerosols, clouds, and trace gases and for understanding of the related atmospheric processes, to provide RI services to wide user groups. ACTRIS is composed of 8 connected elements: distributed National Facilities (observatio ...
Read Project

 28

 FINISHED 
... and Training in the nuclear fields. This will allow consolidating, developing and better exploiting the achievements already reached in the past and to tackle the present challenges in preparing the European workforce in the nuclear fields.The main objectives of the proposal are:1. SURVEY AND COORDINATION OF NETWORKING IN E&T AND VET IN THE NUCLEAR AREAS2. DESIGN AND IMPLEMENTATION OF COORDINATED ...
Read Project

 25

 FINISHED 
...ANUBIUS-RI (International Centre for Advanced Studies on River-Sea Systems) to the legal, financial and technical maturity required for successful implementation and development. DANUBIUS-RI is a pan-European distributed research infrastructure (RI) building on existing expertise to support interdisciplinary research on river-sea (RS) systems, spanning the environmental, social and economic scienc ...
Read Project

 29

 FINISHED 

LAND Management: Assessment, Research, Knowledge base (LANDMARK)

Start date: May 1, 2015, End date: Oct 31, 2019,

LANDMARK is a pan-European multi-actor consortium of leading academic and applied research institutes, chambers of agriculture and policy makers that will develop a coherent framework for soil management aimed at sustainable food production across Europe.The LANDMARK proposal builds on the concept that soils are a finite resource that provides a range of ecosystem services known as “soil functions ...
Read Project

 23

 FINISHED 
... as biobank samples, imaging facilities, molecular screening centres or animal models. Through a user-led approach CORBEL will develop the tools, services and data management required by cutting-edge European research projects: collectively the BMS RIs will establish a sustained foundation of collaborative scientific services for biomedical research in Europe and embed the combined infrastructure ...
Read Project

 39

 FINISHED 
The project 'STI International Cooperation Network for EaP Countries Plus (EaP PLUS)' aims to stimulate cooperation between researchers from the EaP countries and EU MS and enhance the active participation of the Eastern Partnership countries in Horizon 2020 Framework Programme.Building on the results of the predecessor FP7 project 'IncoNet EaP', the project will eliminate remaining obstacles to E ...
Read Project

 18

 FINISHED 
... is attracting industries and fostering innovation based on accelerator and SC magnets cutting-edge developments, C) that strategy and roadmaps are clearly defined and understood to strongly position European industries and SMEs on the market of the construction of new Research Infrastructures worldwide, and D) that potential societal applications are identified and disseminated to the relevant pa ...
Read Project

 12

 FINISHED 

Resource Efficient Food and dRink for the Entire Supply cHain (REFRESH)

Start date: Jul 1, 2015, End date: Jun 30, 2019,

The overall aim of the REFRESH project is to contribute significantly towards the objective of reducing food waste across the EU by 30% by 2025 (which amounts to between 25 to 40 million tonnes of food not being wasted in 2025[1], worth tens of billions of Euros a year) and maximizing the value from unavoidable food waste and packaging materials. To achieve this ambitious goal, we will adopt a sys ...
Read Project

 26

 FINISHED 
The stabilization of molten corium is recognised as essential if a safe and stable state is to be reached following a severe accident. Among the possible options, In-Vessel Melt Retention (IVMR) appears as an attractive solution that would minimize the risks of containment failure (less Hydrogen produced, no corium-concrete interaction), if it can be proved to be feasible.The strategy is already a ...
Read Project

 25

 FINISHED 

Aerosols, Clouds, and Trace gases Research InfraStructure (ACTRIS-2)

Start date: May 1, 2015, End date: Apr 30, 2019,

ACTRIS-2 addresses the scope of integrating state-of-the-art European ground-based stations for long term observations of aerosols, clouds and short lived gases capitalizing work of FP7-ACTRIS. ACTRIS-2 aims to achieve the construction of a user-oriented RI, unique in the EU-RI landscape. ACTRIS-2 provides 4-D integrated high-quality data from near-surface to high altitude (vertical profiles and t ...
Read Project

 32

 FINISHED 
..., neutrinos, and physics beyond the Standard Model. Major developments in detector technology are required to ensure the success of these endeavours. The AIDA-2020 project brings together the leading European infrastructures in detector development and a number of academic institutes, thus assembling the necessary expertise for the ambitious programme of work. In total, 19 countries and CERN are i ...
Read Project

 38

 FINISHED 
The EUNPACK project unpacks EU crisis response mechanisms, with the aim to increase their conflict sensitivity and efficiency. By combining bottom–up perspectives with an institutional approach, EUNPACK will increase our understanding of how EU crisis responses function and are received on the ground in crisis areas. This entails exploring local agencies and perceptions in target countries without ...
Read Project

 12

 FINISHED 
SAPHIR aims to develop vaccine strategies effective against endemic pathogens responsible for high economic losses in livestock in order to strengthen the profitability of food animal systems, improve animal welfare and reduce xenobiotic usage in farming with a One Health perspective. SAPHIR will bring novel vaccine strategies to the market i) at short term, with several promising vaccines brought ...
Read Project

 22

 FINISHED 
Description (EN): The Alpine region must tackle rising energy consumption and, accordingly, CO2 emissions reduction, related mostly to heating needs (mainly from residential and tourism sectors). The potential of renewable energy sources to handle this energy requirement has been discussed in some recent studies. However, the opportunity to utilize Near-Surface Geothermal Energy (NS ...
Read Project

 12

 FINISHED 

CO2 capture from cement production (CEMCAP)

Start date: May 1, 2015, End date: Oct 31, 2018,

The European cement industry has committed itself to contributing to climate protection measures and therefore to curbing its CO2 emissions. CO2 capture technologies, although an essential part of all CO2 reduction scenarios, are not yet ready for large-scale deployment in the cement industry. Hence, the primary objective of CEMCAP isTo prepare the ground for large-scale implementation of CO2 capt ...
Read Project

 15

 FINISHED 
Establishment and development of a new Master on “ENVIRONMENTAL PROTECTION AND ENERGY EFFICIENT BUILDINGS” in 3 RU and 2 AM Universities with affiliation of other 2 RU Universities, according to features and learning outcomes delivering graduates environmental and “green buildings” technological issues’ skills. 1. Curricular reform: to implement an effective curricular development oriented towards ...
Read Project

 20

 FINISHED 
"BBMRI-ERIC: the Biobanking and BioMolecular resources Research Infrastructure - European Research Infrastructure Consortium, aims to establish, operate and develop a Pan-European distributed research infrastructure in order to facilitate the access to biological resources as well as facilities and to support high quality biomolecular and biomedical research. The ADOPT BBMRI-ERIC proposal aims at ...
Read Project

 22

 FINISHED 
This CREMLIN proposal is to foster scientific cooperation between the Russian Federation and the European Union in the development and scientific exploitation of large-scale research infrastructures. It has been triggered by the recent so-called megascience projects initiative launched by and in the Russian Federation which is now very actively seeking European integration. The proposed megascienc ...
Read Project

 19

 FINISHED 
INNO-4-AGRIFOOD will deliver a new generation of innovation support services that will assist European SMEs across the vast Agri-food ecosystem to create value from on-line collaboration for innovation, access a broader range of potential innovation partners beyond their national and sectoral borders and timely mobilise them to seize opportunities to launch concrete innovation projects. INNO-4-AGR ...
Read Project

 7

 FINISHED 
One of the greatest challenges facing regulators in the ever changing landscape of novel nano-materials is how to design and implement a regulatory process which is robust enough to deal with a rapidly diversifying system of manufactured nanomaterials (MNM) over time. Not only does the complexity of the MNM present a problem for regulators, the validity of data decreases with time, so that the wel ...
Read Project

 46

 FINISHED 
GEO-CRADLE brings together key players representing the whole (Balkans, N. Africa and M. East) region and the complete EO value chain with the overarching objective of establishing a multi-regional coordination network that will (i) support the effective integration of existing EO capacities (space/air-borne/in-situ monitoring networks, modelling and data exploitation skills, and past project expe ...
Read Project

 20

 FINISHED 
...against which the goal of ‘no net loss of BD and ES’ can be evaluated. In response to these requirements, ESMERALDA aims to deliver a flexible methodology to provide the building blocks for pan-European and regional assessments. The work will ensure the timely delivery to EU member states in relation to Action 5 of the BD Strategy, supporting the needs of assessments in relation to the requirement ...
Read Project

 25

 FINISHED 

Open Access Infrastructure for Research in Europe 2020 (OpenAIRE2020)

Start date: Jan 1, 2015, End date: Jun 30, 2018,

OpenAIRE2020 represents a pivotal phase in the long-term effort to implement and strengthen the impact of the Open Access (OA) policies of the European Commission (EC), building on the achievements of the OpenAIRE projects. OpenAIRE2020 will expand and leverage its focus from (1) the agents and resources of scholarly communication to workflows and processes, (2) from publications to data, software ...
Read Project

 50

 FINISHED 

Human Brain Project Specific Grant Agreement 1 (HBP SGA1)

Start date: Apr 1, 2016, End date: Mar 31, 2018,

...bilities of the HBP Platforms, in order to use them to address otherwise intractable problems in neuroscience, computing and medicine in the future. In addition, collaborations with other national, European and international initiatives will create synergies, maximizing returns on research investment. SGA1 covers the detailed steps that will be taken to move the HBP closer to achieving its ambitio ...
Read Project

 126

 FINISHED 

CAST (CArbon-14 Source Term) (CAST)

Start date: Oct 1, 2013, End date: Mar 31, 2018,

The CAST project (CArbon-14 Source Term) aims to develop understanding of the generation and release of 14C from radioactive waste materials under conditions relevant to waste packaging and disposal to underground geological disposal facilities. The project will focus on releases from irradiated metals (steels, Zircaloys) and from ion-exchange materials as dissolved and gaseous species. A study t ...
Read Project

 37

 FINISHED 
...ns of thermal energy storage and/or hybridization, e.g. with biomass. However, significant research efforts are needed to achieve this goal. This Integrated Research Programme (IRP) engages all major European research institutes, with relevant and recognized activities on STE and related technologies, in an integrated research structure to successfully accomplish the following general objectives: ...
Read Project

 42

 FINISHED 

Euro-BioImaging Preparatory Phase II - Project (EuBI PPII)

Start date: Jan 1, 2016, End date: Dec 31, 2017,

Euro-BioImaging (EuBI) is the pan-European research infrastructure project for imaging technologies in biological and medical sciences and has been on the ESFRI Roadmap since 2008. In close match with the scope and objectives of the INFRADEV2 call, Preparatory Phase II (PPII) funding will enable EuBI:• to finalize the submission and approval procedure of its ERIC statutes with the EC and bring the ...
Read Project

 21

 FINISHED 
"LUC4C will advance our fundamental knowledge of the climate change - land use change interactions, and develop a framework for the synthesis of complex earth system science into guidelines that are of practical use for policy and societal stakeholders.Policies in support of climate change mitigation through land management, and the societal demand for other services from terrestrial ecosystems ar ...
Read Project

 15

 FINISHED 

Danube Region INCO-NET (DANUBE-INCO.NET)

Start date: Jan 1, 2014, End date: Jun 30, 2017,

Danube-INCO.NET understands itself as strategic high-level coordination and support action. Its background is the macro-regional approach of the European Union, in particular the EU Strategy for the Danube Region (EUSDR) and its Priority Areas for Knowledge Society (PA7) and for Competitiveness (PA8). Based on strong institutionaliszed links with the PA Coordinators and the PA Steering Groups, a c ...
Read Project

 22

 FINISHED 
Despite improved understanding of the links between ecosystem health, provision of ecosystem services and human well-being, further conceptual and empirical work is needed to make the ideas of ecosystem services (ESS) and natural capital (NC) operational. OpenNESS will therefore develop innovative and practical ways of applying them in land, water and urban management: it will identify how, where ...
Read Project

 39

 FINISHED 
By 2050, global agricultural productivity will need to increase with at least 70%. In order to guarantee food production for future generations, agricultural production will need to be based on sustainable land management practises. At present, earth observation based (global) crop monitoring systems focus mostly on short-term agricultural forecasts, thereby neglecting longer term environmental ef ...
Read Project

 22

 FINISHED 

Code for European Severe Accident Management (CESAM)

Start date: Apr 1, 2013, End date: Mar 31, 2017,

...and the development or improvement of adequate severe accident management measures is essential in order to further increase the safety of the nuclear power plants operated in Europe. CESAM (Code for European Severe Accident Management) is a R&D project that aims in particular at the improvement of the European reference code ASTEC towards a usage in severe accident management analysis for nuclear ...
Read Project

 21