With large shares of Distributed Energy Resources (DER) and Renewable Energy Sources (RES) that can be expected in the 2010 time frame as a consequence of reaching EU policy targets, at least in certain parts of Electric Power Systems of the EU and its Member States challenges with regard to controllability and optimal integration will have to be met. The INTEGRAL project aims to build and demonst ...