Search for European Projects

3 European Projects Found

Searched on 125080 European Projects

 FINISHED 
...lants covering all the components needed for power generation as well as CO2 capture and compression.Operability and flexibility of first generation post combustion processes are demonstrated by TNO, EnBW and ENEL pilot plants in order to prepare full scale demo projects such as the ROAD and Porto Tolle projects that will start in 2015. OCTAVIUS will establish detailed guidelines with relevant dat ...
Read Project

 18

 FINISHED 
The importance of aging of infrastructures, networks and industrial plants will continue to increase because of (a) need to continue operation of these infrastructures, networks and plants beyond the design life-time, (b) need to operate under changed conditions and (c) the increased role of existing plants in the optimized (“smart”) supply and utility networks of the future, e.g. as fall-back sup ...
Read Project

 15

 FINISHED 

Innovative CO2 capture (iCap)

Start date: Jan 1, 2010, End date: Dec 31, 2013,

In post-combustion CO2 capture, a main bottleneck causing significant reduction in power plant efficiency and preventing cost effectiveness is the low flue gas CO2 partial pressure, limiting membrane flux, solvent selection and capacity. In pre-combustion CO2 capture, key bottlenecks are number of processing steps, possible low hydrogen pressure, and high hydrogen fraction in the fuel Global deplo ...
Read Project

 14