Search for European Projects

35 European Projects Found

Searched on 125080 European Projects

 FINISHED 
A step change in our noise mitigation strategies is required in order to meet the environmental targets set for a number of sectors of activity affecting people through noise exposure. Besides being a hindrance to our daily life and subject to regulations, noise emission is also a competitive issue in today’s global market. To address these issues, new technologies have been emerging recently, bas ...
Read Project

 13

 FINISHED 

GRAphene nonlinear PHotonic Integrated CircuitS (GRAPHICS)

Start date: Sep 1, 2015, End date: Aug 31, 2020,

"GRAPHICS aims at developing novel chip-based photonic devices for all-optical signal processing in graphene/ semiconductor hybrid platforms. The resulting architectures will be the cornerstone of a disruptive optical routing and processing technology on silicon chips for communications as well as Datacom and interconnect applications. These will also pave the way towards the photonic-microelectro ...
Read Project

 1

 FINISHED 

Microorganisms in Warming Arctic Environments (MicroArctic)

Start date: Apr 1, 2016, End date: Mar 31, 2020,

The Arctic plays a key role in the Earth’s climate system and is an area of growing strategic importance for European policy. In this ETN, we will train the next generation of Arctic microbiology and biogeochemistry experts who, through their unique understanding of the Arctic environment and the factors that impact ecosystem and organism response to the warming Arctic, will be able to respond to ...
Read Project

 13

 FINISHED 
TurboNoiseBB aims to deliver reliable prediction methodologies and noise reduction technologies in order to allow European Aerospace industries:• to design low-noise aircraft to meet society’s needs for more environmentally friendly air transport• to win global leadership for European aeronautics with a competitive supply chain.The project is focusing on fan broadband (BB) noise sources and will o ...
Read Project

 15

 FINISHED 

VIbro-acoustics of PERiodic media (VIPER)

Start date: Jan 1, 2016, End date: Dec 31, 2019,

VIPER is a European Joint Doctorate network focused on research in VIbroacoustic of PERiodic media. Structural periodic design is a powerful strategy for lightweight structures achievements while remaining a convenient solution for manufacturing aspects. One of the research targets is the inclusion of vibroacoustic design rules at early stage of products development through the use of periodic med ...
Read Project

 5

 FINISHED 

CAbin NOise from Boundary Layer Excitation (CANOBLE)

Start date: Sep 1, 2016, End date: Aug 31, 2019,

CANOBLE aims to develop and validate innovative engineering methods and tools up to TRL5 to study, in design phase, the noise generated inside the cockpit and cabin by the external turbulent boundary layer.A unique experimental and numerical data base will be created for the benefit of the European noise community and the European aeronautic industry. A full scale mock-up of a cockpit including a ...
Read Project

 3

 FINISHED 

Higher education student and staff mobility project

Start date: Jun 1, 2016, End date: Sep 30, 2017,

This is a higher education student and staff mobility project, please consult the website of the organisation to obtain additional details.
Read Project

 1

 FINISHED 

Engine Module Validators (ENOVAL)

Start date: Oct 1, 2013, End date: Sep 30, 2017,

The ENOVAL project will provide the next step of engine technologies to achieve and surpass the ACARE 2020 goals on the way towards Flightpath 2050. ENOVAL completes the European 7th Framework Programme (FP7) roadmap of Level 2 aero engine projects. ENOVAL will focus on the low pressure system of ultra-high by-pass ratio propulsion systems (12 < BPR < 20) in conjunction with ultra high overall pre ...
Read Project

 37

 FINISHED 

New Technologies for Tunnelling and Underground Works (NETTUN)

Start date: Sep 1, 2012, End date: Feb 28, 2017,

...he 23 partners in the NeTTUN Consortium – Industrial, Research and Development and SME – has been invited to participate because of unique scientific expertise and tunnelling sector experience. Ecole Centrale de Lyon, a French top-level engineering school involved in international research, will be the NeTTUN project coordinator. NFM, the French Tunnel Boring Machine manufacturer, will manage the ...
Read Project

 24

 FINISHED 

NORA - Nitrous Oxide Research Alliance Training Network (NORA)

Start date: Jan 1, 2013, End date: Dec 31, 2016,

The fate of anthropogenic nitrogen is at the core of our environmental predicament. Human activities have more than doubled the annual input of reactive nitrogen to the biosphere compared to prehistoric levels, causing escalating emissions of nitrous oxide (N2O) which contributes to global warming and depletion of stratospheric ozone. Ultimately, anthropogenic nitrogen will return to the atmospher ...
Read Project

 11

 FINISHED 
The SITOGA project will address for the first time the integration of transition metal oxides (TMO) materials in silicon photonics and CMOS electronics. TMOs have unique electro-optical properties that will offer unprecedented and novel capabilities to the silicon platform. SITOGA will focus on two disruptive TMO materials, barium titanate (BaTiO3) and vanadium oxide (VO2), for developing advanced ...
Read Project

 8

 FINISHED 

Higher education student and staff mobility project

Start date: Jun 1, 2015, End date: Sep 30, 2016,

Ecole centrale de Lyon (ECL) directs a broad scope international policy based on three actions: stimulating the international mobility of its students, hosting a large number of foreign students on its campus and developing international research projects. Now, it is compulsory for French engineering students do a 3-month minimum stay abroad in a university or in a company to be granted the Diplôm ...
Read Project

 1

 FINISHED 
"Reaching low levels of cabin and ramp noise is crucial to ensure the satisfaction of aircraft passengers and a safe working environment for the crew and personnel servicing the grounded aircraft. From the passenger and personnel standpoint, good thermal and acoustic comfort is important to minimize both stress symptoms and tiredness. Required to provide satisfactory air quality and temperature, t ...
Read Project

 10

 FINISHED 
"The project will lay the foundations of an all-optical signal processing architecture on-chip. The cost, size, and energy requirements of the present electronic equipment that manages network data flows are rapidly reaching crisis point, accelerated by the exponential growth of the global Internet traffic. A promising solution lies in moving to all-optical technologies, where optical data are han ...
Read Project

 1

 FINISHED 
The main aim of the ENTICE proposal is to provide professional development in the multidisciplinary field of ENgineering Tribochemistry and Interfaces for IC Engines, capable to develop the new generation of clean and energy-efficient engines. It aims to train the next generation of researchers to work in diverse teams, to cross disciplinary and sectoral boundaries and apply advanced communicatio ...
Read Project

 9

 FINISHED 
The TRAINBIODIVERSE ITN will provide professional skills and training for young scientists covering multi-disciplinary aspects of soil biodiversity, ecosystem services, their economic significance and practical implications and implementation.The researchers will gain access to European educational and network facilities and training aimed at ensuring the wellbeing of human populations and the con ...
Read Project

 11

 FINISHED 
The main objective of the proposed project is to establish a European-level vibrant training environment in a rapidly emerging research field at the crossroads of structural engineering and smart technologies. The participants link up their cross-sectoral expertise to support their researchers in pursuing an interdisciplinary career and to provide them with a cohesive training environment. The pro ...
Read Project

 6

 FINISHED 

Higher education student and staff mobility project

Start date: Jun 1, 2014, End date: Sep 30, 2015,

This is a higher education student and staff mobility project, please consult the website of the organisation to obtain additional details.
Read Project

 1

 FINISHED 
The goal of the proposed project is to understand the physico-chemical basis underlying the excellent tribological properties of silicon oxide-doped diamond-like carbon (SiOx-DLC) coatings. SiOx-DLCs are amorphous films supposedly consisting of two interpenetrating, interbonded networks, one being a hydrogenated amorphous carbon network and the other a silica glass network. They exhibit impressive ...
Read Project

 1

 FINISHED 
Crime-fighting is a significant concern of the European Union. The EU is committed to fighting all forms of serious, organised and transnational crime. This commitment has led to the decision in 1999 to create a network of national authorities responsible for crime prevention, and later to the establishment (in 2001) of the European Crime Prevention Network and specifically, in the support of fore ...
Read Project

 7

 FINISHED 
ACOUTRAIN will simplify and improve the acoustic certification process of new rolling stock, in particular relating to the TSI Noise. Today the need of conformity assessment for a new vehicle according to the TSI Noise represents a significant element of both cost and time to market due to the need to carry out expensive and time consuming tests. The goal of the proposed project is to speed up the ...
Read Project

 15

 FINISHED 

Atmospheric dynamics InfraStructure in Europe (ARISE)

Start date: Jan 1, 2012, End date: Dec 31, 2014,

ARISE proposes to design a new infrastructure that integrates different station networks in order to provide a new “3D” image of the atmosphere from the ground to the mesosphere with unprecedented spatio-temporal resolution. Three existing networks are involved: 1) the International infrasound network developed for the verification of the Comprehensive nuclear Test Ban Treaty (CTBT), 2) the Networ ...
Read Project

 12

 FINISHED 

Metagenomics for bioexploration - Tools and application (METAEXPLORE)

Start date: May 1, 2009, End date: Apr 30, 2014,

"This proposal will (further) develop and apply metagenomics tools to access the enzymatic potential borne in the cryptic biota of selected natural habitats, in particular target soil-related and aquatic ones. In the light of the environmental relevance of chitins and lignins (as natural compounds recalcitrant to degradation) and halogenated aliphatic and aromatic compounds (anthropogenic recalcit ...
Read Project

 17

 FINISHED 

ECODESIGN NETWORK (EDEN)

Start date: Jan 10, 2012, End date: Mar 10, 2014,

Le projet EDEN vise à inciter les entreprises du secteur de la transformation des matériaux à collaborer ensemble sur toute la zone transfrontalière et à favoriser les échanges tant au niveau du développement de nouveaux produits que sur l'aspect commercial. Le projet se fixe pour objectif d'inciter les entreprises à produire de manière durable en adoptant la démarche d'éco-conception.
Read Project

 10

 FINISHED 
"In the domain of civilian aeronautics, the increasing noise restrictions around airports are a challenging problem for aircraft and engine manufacturers. Despite significant progresses since the definition of ACARE objectives, jet noise remains the main source of noise for an aircraft at take-off and many works have been dedicated to its understanding and its reduction. First generation of noise ...
Read Project

 13

 FINISHED 

Flutter-Free Turbomachinery Blades (FUTURE)

Start date: Jul 1, 2008, End date: Jun 30, 2013,

"FUTURE brings together European and international well reputed centres-of-excellence in order to reach major scientific & technical objectives in striving towards flutter-free turbomachine blades. By advancing the state-of-the-art in flutter prediction capabilities and design rules, the FUTURE project will lead to benefits in terms of decreased development cost, reduced weight and fuel consumptio ...
Read Project

 26

 FINISHED 

Efficient Cooling Systems for QUieter Surface Transport (ECOQUEST)

Start date: Dec 1, 2009, End date: May 31, 2013,

"An important subsystem in surface transportation vehicles (rail bound, automotive and heavy duty) is the cooling unit. Present European standards for interoperability of rail bound traffic require low noise levels while manufactures need to meet the vehicle performance and energy efficiency requested by the operators. The stringent EU6 emission limits expected to come into effect will increase dr ...
Read Project

 10

 FINISHED 

VALidation and Improvement of Airframe Noise prediction Tools (VALIANT)

Start date: Sep 1, 2009, End date: May 31, 2013,

"Broadband noise generated by the turbulent flow around the airframe is one of the most important components of aircraft generated acoustic nuisances. Its prediction and subsequent reduction is essential for achieving the ACARE 2020 objectives of noise level reductions. However, the complexity and diversity of broadband turbulent noise sources makes that prediction with present numerical tools ext ...
Read Project

 13

 FINISHED 

pHotonics ELectronics functional Integration on CMOS (HELIOS)

Start date: May 1, 2008, End date: Nov 30, 2012,

Photonics on CMOS is a candidate technology for applications where functional integration is needed for improving system performance while reducing size and cost.Functional demonstration of basic building blocks such as a µlaser, a detector, coupling, and link has been realized in previous research projects. As a next step the HELIOS project proposes to integrate photonics components with integrat ...
Read Project

 22

 FINISHED 
"Effective and efficient vibration and acoustic analysis, modelling and design methods are required to produce world-leading products with good noise and vibration performance. Noise and vibration levels must remain within safe limits, there are issues regarding human comfort and a need for robust, optimal, efficient designs. There is also an increasing trend towards virtual design and prototyping ...
Read Project

 13

 FINISHED 
The objective of NextMuSE is to initiate a paradigm shift in the technology of Computational Fluid Dynamics (CFD) and Computational Multi-Mechanics (CMM) simulation software which is used to model physical processes in research and technology development across a range of industries.NextMuSE relies on a mesh-free method, Smoothed Particle Hydrodynamics (SPH), which is fundamentally different from ...
Read Project

 9

 FINISHED 
"Air traffic is predicted to grow by 5% per year in the short and medium term. Technology ad-vances are required to achieve this growth without unacceptable levels of noise. FLOCON addresses this issue by reducing fan noise at source through the development of innovative concepts based on flow control technologies. FLOCON is aimed primarily at reducing fan broadband noise. This is one of the most ...
Read Project

 17

 FINISHED 
"The overall concept of the proposed project is to improve the hydraulic efficiency of small action type turbines, through the development and application of a numerical optimization methodology, that will be validated by the construction and laboratory testing of the prototype models of Pelton, Turgo and Matrix turbines representing both action and reaction types. The methodology to be developed ...
Read Project

 8

 FINISHED 

Wavelength Division Multiplexed Photonic Layer on CMOS (WADIMOS)

Start date: Jan 1, 2008, End date: Jun 30, 2011,

WADIMOS proposes to develop a generic technology for the realization of complex electro-photonic integrated ICs using standard CMOS processing technologies.These ICs will contain a photonic interconnect layer incorporating microsource arrays and ultracompact WDM (wavelength division multiplexing) functionality based on silicon nanophotonic wire circuits, driven directly from by the CMOS electronic ...
Read Project

 8

 FINISHED 

Enabling Grids for E-sciencE III (EGEE-III)

Start date: May 1, 2008, End date: Apr 30, 2010,

A globally distributed computing Grid now plays an essential role for large-scale, data intensive science in many fields of research. The concept has been proven viable through the Enabling Grids for E-sciencE project (EGEE and EGEE-II, 2004-2008) and its related projects. EGEE-II is consolidating the operations and middleware of this Grid for use by a wide range of scientific communities, such as ...
Read Project

 167