Search for European Projects

Over 40 European Projects Found

Searched on 125080 European Projects

 FINISHED 

Nature Integrated Management to 2020 (LIFE IP GESTIRE 2020)

Start date: Jan 1, 2016, End date: Dec 31, 2023,

Background In order to ensure the conservation objectives and ecological coherence of the Natura 2000 network, the Lombardy region recognised the need to develop a regional strategy for the period 2015-2020, supported by an integrated, unified, coordinated and participatory management strategy. To this end, in the period 2012-2015 the project GESTIRE (LIF ...
Read Project

 7

 FINISHED 

Engine Mount System for Ultra High Pass Engine (EMS UHPE)

Start date: Mar 15, 2016, End date: Feb 14, 2022,

Our consortium is applying for the Engine Mounts System (EMS) of the Ultra High Propulsive Efficiency. Our 3 objectives are:1. Assist the Engine Manufacturer & the Airframer in the evaluation & selection of the most promising & suitable Engine Mounts System (EMS) configuration. Criteria for evaluation: weight, cost, dynamic performance, certification, impact on engine & aircraft assembly.2. Design ...
Read Project

 5

 FINISHED 

Internet of Food and Farm 2020 (IoF2020)

Start date: Jan 1, 2017, End date: Dec 31, 2020,

The IoF2020 project is dedicated to accelerate adoption of IoT for securing sufficient, safe and healthy food and to strengthen competitiveness of farming and food chains in Europe.It will consolidate Europe’s leading position in the global IoT industry by fostering a symbiotic ecosystem of farmers, food industry, technology providers and research institutes.The IoF2020 consortium of 73 partners, ...
Read Project

 72

 FINISHED 
Investing in energy efficiency and saving is crucial to support energy accessibility and environmental protection, and it is the world’s best interest to share and implement forms of energy efficiency. This implies a stronger and effective transnational policy to promote and disseminate know-how about new technologies both at the market and R&D level. In this respect, development of projects cente ...
Read Project

 8

 FINISHED 
inteGRIDy aims to integrate cutting-edge technologies, solutions and mechanisms in a scalable Cross-Functional Platform connecting energy networks with diverse stakeholders, facilitating optimal and dynamic operation of the Distribution Grid (DG), fostering the stability and coordination of distributed energy resources and enabling collaborative storage schemes within an increasing share of renewa ...
Read Project

 31

 FINISHED 
PROTECT aims to introduce to the market One step antimicrobial finish processes for polymeric materials used in i) specialty textiles for public areas and hospitals, ii) water treatment membranes, and iii) implantable medical devices. Compared to main existing manufacturing routes, the proposed one-step coating technologies are simple, fast, and reproducible. For this, PROTECT uses as a starting p ...
Read Project

 23

 FINISHED 
The benefits of high efficiency concentrated solar power (CSP) and photovoltaic (PV) are well known: environmental protection, economic growth, job creation, energy security. Those technologies can only be applied properly in regions with annual mean radiation values higher than 1750 kWh/m2 per year. CSP has advantages in front of PV: possible 24h continuous electricity production, electricity and ...
Read Project

 11

 FINISHED 
The challenges facing society in urban wastewater management cannot be solved by any one sector alone. ALICE (AcceLerate Innovation in urban wastewater management for Climate changE) will accelerate innovation by bringing together and exchanging knowledge between the key players who can, together, address the future techno-economic, governance and societal challenges arising from climate change. I ...
Read Project

 13

 FINISHED 
Silicon carbide presents a high breakdown field (2-4 MV/cm) and a high energy band gap (2.3–3.2 eV), largely higher than for silicon. Within this frame, the cubic polytype of SiC (3C-SiC) is the only one that can be grown on a host substrate with the huge opportunity to grow only the silicon carbide thickness required for the targeted application. The possible growth on silicon substrate has remai ...
Read Project

 14

 FINISHED 
The global goal of the CYBERLEGs Plus Plus project is to validate the technical and economic viability of the powered robotic ortho-prosthesis developed within the framework of the FP7-ICT-CYBERLEGs project as a means to enhance/restore the mobility of transfemoral amputees and to enable them to perform locomotion tasks such as ground-level walking, walking up and down slopes, climbing/descending ...
Read Project

 7

 FINISHED 

Sharing Cities (SHAR-LLM)

Start date: Jan 1, 2016, End date: Dec 31, 2020,

Sharing Cities has four key objectives. 1) To achieve scale in the European smart cities market by proving that properly designed smart city solutions, based around common needs, can be integrated in complex urban environments. This will be done in a way that exhibits their true potential and allows for the significant scale-up and consequent increase in social, economic and environmental value. ...
Read Project

 36

 FINISHED 
VOLATILE aims in the development of an innovative Volatile Fatty Acids Platform for the bioconversion of municipal solid bio-waste fraction and sludgy biowaste from other industries. The platform will be integrated in anaerobic digestion. The volatile fatty acids will be recovered continuously using sophisticated membrane technology and will be provided as feedstock / carbon source for value added ...
Read Project

 21

 FINISHED 
SUITS takes a sociotechnical approach to capacity building in Local Authorities and transport stakeholder organisations with special emphasis on the transfer of learning to smaller sized cities, making them more effective and resilient to change in the judicious implementation of sustainable transport measures. Key outputs will be a validated capacity building program for transport departments, an ...
Read Project

 21

 FINISHED 
Background The project targets a range of fauna species found in Ticino Park - 15 species listed in Annex I of the Birds Directive and Annex II, IV and V of the Habitats Directive. The park acts as a source of biodiversity for the whole Padana Plain, hosting most of the species of conservation interest related to this geographic area. Currently, it is the ...
Read Project

 3

 FINISHED 
Approximately one third of all food produced globally is wasted every year throughout the whole value chain-from farmers to consumers. To extract the significant amounts of valuable compounds contained in these wastes, AgriMax will combine affordable and flexible processing technologies (ultrasound assisted and solvent extraction, filtration, thermal and enzymatic treatments) for the valorization ...
Read Project

 30

 FINISHED 
The basic idea is to embed the waste from building demolition (fragmented bricks, fragmented plaster or concrete, fragmented glasses, machined wood from windows frame or from wood beams after demolition etc.) in a geopolymer matrix to produce prefabricated panels for different use.The main objective of InnoWEE is in fact the development of an optimized reuse of Construction and Demolition Waste (C ...
Read Project

 10

 FINISHED 
European forests are expected to provide a broad range of ecosystem services (ES). This capacity is however threatened by the uncertainties of climate change, the complex dynamics of evolving global markets and the pressures for increased use of bioenergy. Such challenges cannot be effectively addressed with an uncritical regional or national commitment to traditional forest management models (FMM ...
Read Project

 21

 FINISHED 
NoAW : No Agro-Waste.Innovative approaches to turn agricultural waste into ecological and economic assets.Driven by a “near zero-waste” society requirement, the goal of NoAW project is to generate innovative efficient approaches to convert growing agricultural waste issues into eco-efficient bio-based products opportunities with direct benefits for both environment, economy and EU consumer. To ach ...
Read Project

 32

 FINISHED 

ENabling Onshore CO2 Storage in Europe (ENOS)

Start date: Sep 1, 2016, End date: Aug 31, 2020,

To meet the ambitious EC target of an 80% reduction in greenhouse gas emissions by 2050, CO2 Capture and Storage (CCS) needs to move rapidly towards full scale implementation with geological storage solutions both on and offshore. Onshore storage offers increased flexibility and reduced infrastructure and monitoring costs. Enabling onshore storage will support management of decarbonisation strateg ...
Read Project

 20

 FINISHED 
Rapid expansion of utilisation of solar thermal energy for increasing energy efficiency of buildings have been adopted in short/medium- and long-term Energy Strategies of EU countries in line with regional actions with the European climate energy objectives as defined in the European Union’s “20-20-20” targets and in the European Commission’s Energy Roadmap 2050.The overall objective of this proje ...
Read Project

 9

 FINISHED 

Photovoltaic module life time forecast and evaluation (SOLAR-TRAIN)

Start date: Sep 1, 2016, End date: Aug 31, 2020,

The quality assurance in the photovoltaic industry is yet in its infancy, requiring both underpinning science and trained personnel to reduce costs of energy. An unmet industrial requirement is an accelerated, and operating environment specific, service life time and energy yield assessment. SOLAR-TRAIN will qualify ESRs in the field of PV durability as part of a highly innovative, multi-disciplin ...
Read Project

 8

 FINISHED 
Background Noise pollution is a growing environmental concern. It is a major environmental health problem in Europe, with an estimated 125 million people affected by high noise levels that cause serious health problems and stress. The EU has introduced the concept of low emission zones (LEZs), but this was mainly devised in the context of improving air qu ...
Read Project

 4

 FINISHED 
NewSOL proposal addresses the specific challenge towards high efficiency solar energy harvesting by advance materials solutions and architectures that are in line with those specified in SET-plan. Its main objective is to develop advance materials solutions based on innovative storage media and concepts for Concentrated Solar Power (CSP) up to validation in field of their performance by real time ...
Read Project

 14

 FINISHED 
ACTIVAGE is a European Multi Centric Large Scale Pilot on Smart Living Environments. The main objective is to build the first European IoT ecosystem across 9 Deployment Sites (DS) in seven European countries, reusing and scaling up underlying open and proprietary IoT platforms, technologies and standards, and integrating new interfaces needed to provide interoperability across these heterogeneous ...
Read Project

 50

 FINISHED 
There is an increasing demand for advanced materials with temperature capability in highly corrosive environments for aerospace. Rocket nozzles of solid/hybrid rocket motors must survive harsh thermochemical and mechanical environments produced by high performance solid propellants (2700-3500°C). Thermal protection systems (TPS) for space vehicles flying at Mach 7 must withstand projected service ...
Read Project

 12

 FINISHED 

Marine Ecosystem Restoration in Changing European Seas (MERCES)

Start date: Jun 1, 2016, End date: May 31, 2020,

The project MERCES is focused on the restoration of different degraded marine habitats, with the aim of: 1) assessing the potential of different technologies and approaches; 2) quantifying the returns in terms of ecosystems services and their socio-economic impacts; 3) defining the legal-policy and governance frameworks needed to optimize the effectiveness of the different restoration approaches. ...
Read Project

 28

 FINISHED 
SMART-Plant will scale-up in real environment eco-innovative and energy-efficient solutions to renovate existing wastewater treatment plants and close the circular value chain by applying low-carbon techniques to recover materials that are otherwise lost. 7+2 pilot systems will be optimized fore > 2 years in real environment in 5 municipal water treatment plants, inclunding also 2 post-processing ...
Read Project

 27

 FINISHED 

BRIdges the GAp for Innovations in Disaster resilience (BRIGAID)

Start date: May 1, 2016, End date: Apr 30, 2020,

Recent studies from the IPCC indicate that Europe is particularly prone to increased risks of river and coastal floods, droughts resulting in water restrictions and damages from extreme weather such as heat events and wildfires. Evaluations also show a huge potential to reduce these risks with novel adaptation strategies. Researchers, innovators and incubators develop innovative products and servi ...
Read Project

 24

 FINISHED 
Background The breeding success of bird species with unfavourable conservation status, such as Scopoli’s shearwater (Calonectris diomedea) and Yelkouan shearwater (Puffinus yelkouan), is seriously threatened by the black rat (Rattus rattus), as demonstrated by international scientific literature. This negative trend is occurring in several Mediterranean ...
Read Project

 5

 FINISHED 
Background The widespread presence of stray dogs represents a threat to the grey wolf (Canis lupus) because of the increased possibility of genetic loss for the target species, predation of domestic animals (often attributed to wolves) and transmission of diseases that could weaken wolf populations. Moreover, the negative attitude towards wolves, consider ...
Read Project

 5

 FINISHED 

1D Nanofibre Electro-Optic Networks (1D-Neon)

Start date: Apr 1, 2016, End date: Mar 31, 2020,

The vision of 1D-NEON proposal is to develop fibre-based smart materials along with an integrated technology platform for the manufacturing in Europe of new products with multi-sectorial applications in consumer electronics, energy, healthcare and fitness, smart buildings, sensors and e-skin for soft robotics.The overall objective of 1D-NEON is to build a modular platform for manufacturing fibre-b ...
Read Project

 14

 FINISHED 
The Green INSTRUCT project will develop a prefabricated modular structural building block that is superior to conventional precast reinforced concrete panels by virtue of its reduced weight, improved acoustic and thermal performance and multiple functionalities. The Green INSTRUCT block consists of over 70% of CDW in weight. The Green INSTRUCT project will: (i) achieve sustainability and cost sav ...
Read Project

 15

 FINISHED 

WADI

Start date: Oct 1, 2016, End date: Mar 31, 2020,

The overall objective of WADI project is to contribute to the reduction of losses in water transmission systems and decrease the related energy consumption required for the process. WADI aims to develop an airborne water leak detection surveillance service to provide water utilities with adequate information on leaks in water infrastructure outside urban areas, thus enabling the utility to promptl ...
Read Project

 12

 FINISHED 
RAISELIFE focuses on extending the in-service lifetime of five key materials for concentrated solar power technologies: 1) protective and anti-soiling coatings of primary reflectors, 2) high-reflective surfaces for heliostats, 3) high-temperature secondary reflectors, 4) receiver coatings for solar towers and line-focus collectors, 5) corrosion resistant high-temperature metals and coatings for st ...
Read Project

 13

 FINISHED 

Alien Species Awareness Program (LIFE ASAP)

Start date: Sep 30, 2016, End date: Mar 30, 2020,

Background The EU Invasive Alien Species Regulation highlights the benefits of preventing the spread of invasive alien species (IAS) in terms of biodiversity and cost. Increased public awareness and effective early warning systems and management are essential to this task. In Italy, there is a need for more public awareness of the problem, in particular o ...
Read Project

 7

 FINISHED 
In the vaccine industry, downstream processing is of extreme importance. Prophylactic vaccines aim at protecting healthy people, so any contaminant has to be discarded with the most drastic measures. Such « negative » approach comes at the expense of the recovery of product : yields are poor, thereby inducing a high product cost. Processes are also complex, since they rely on multiple eliminations ...
Read Project

 6

 FINISHED 
The overall goal of the RE4-Project is to promote new technological solutions for the design and development of structural and non-structural pre-fabricated elements with high degree of recycled materials and reused structures from partial or total demolition of buildings. The developed technology will aim at energy efficient new construction and refurbishment, thus minimizing environmental impact ...
Read Project

 14

 FINISHED 
MyToolBox mobilises a multi-actor partnership (academia, farmers, technology SMEs, food industry and policy stakeholders) to develop novel interventions aimed at achieving a 20-90% reduction in crop losses due to fungal and mycotoxin contamination. MyToolBox will not only pursue a field-to-fork approach but will also consider safe use options of contaminated batches, such as the efficient producti ...
Read Project

 23

 FINISHED 
This project addresses the scientific, technological and clinical problem of recovery of hand function after amputation. Despite decades of research and development on artificial limbs and neural interfaces, amputees continue to use technology for powered prostheses developed over 40 years ago, namely myoelectric prostheses controlled via superficial electrodes. These devices do not purposely prov ...
Read Project

 7

 FINISHED 

Robotic subsea exploration technologies (ROBUST)

Start date: Dec 1, 2015, End date: Jan 31, 2020,

There is a need to develop an autonomous, reliable, cost effective technology to map vast terrains, in terms of mineral and raw material contents which will aid in reducing the cost of mineral exploration, currently performed by ROVs and dedicated SSVs and crew. Furthermore there is a need to identify, in an efficient and non-intrusive manner (minimum impact to the environment), the most rich mine ...
Read Project

 10