Search for European Projects

36 European Projects Found

Searched on 125080 European Projects

 FINISHED 
The ECO-SEE project aims to develop new eco-materials and components for the purpose of creating both healthier and more energy efficient buildings. We will create and symbiotically use natural eco-materials for healthier indoor environments through hygrothermal (heat and moisture) regulation and the removal airborne contaminants through both chemical capture and photocatalysis. Our objectives inc ...
Read Project

 19

 FINISHED 
Background Europe’s agricultural sector is linked with the pollution of surface waters, groundwaters and seas by nutrients and pesticide residues. Decreasing the dispersal of these pollutants is a priority for environmental programmes and regulations in France (i.e. ECOPHYTO 2018) and Europe (the Water Framework Directive and Directive 2008/105/EC on en ...
Read Project

 4

 FINISHED 
The EU wrought aluminium industry is based on the use of primary aluminium. Primary aluminium production is both energy and carbon intensive and EU production is rapidly declining. Secondary aluminium (post-consumer scrap) is either downgraded into low quality cast products, or exported.This scrap could be transformed into a low cost, low carbon feedstock for wrought product and high quality casti ...
Read Project

 13

 FINISHED 
MobilePass will focus on research and development towards technologically advanced mobile equipment at land border crossing points. This will allow border control authorities to check European, visa-holding and frequent third country travellers in a comfortable, fast and secure way. The mobile solution incorporates new technologies needed in mobile scenarios and embeds them in the actual border cr ...
Read Project

 12

 FINISHED 
HoliDes addresses development and qualification of Adaptive Cooperative Human-Machine Sys-tems (AdCoS) where many humans and many machines act together, cooperatively, in a highly adaptive way. They adapt to each other and to the context to guarantee fluent and cooperative task achievement. Such systems with higher levels of automation are urgently needed to enhance safety and to increase the conf ...
Read Project

 32

 FINISHED 

Federation for FIRE (Fed4FIRE)

Start date: Oct 1, 2012, End date: Sep 30, 2016,

A federation of experimentation facilities will significantly accelerate Future Internet research. Fed4FIRE will deliver open and easily accessible facilities to the FIRE experimentation communities, which focus on fixed and wireless infrastructures, services and applications, and combinations thereof. The project will develop a demand-driven common federation framework, based on an open architect ...
Read Project

 43

 FINISHED 
In recent years, traditional processors have not been able to translate the advances of silicon fabrication technology into corresponding performance gains. This has been due to weaknesses inherent in the current sequential programming model, which has not changed significantly since the late 1940's, as well as due to physical constraints, such as practical limits on the energy consumption and the ...
Read Project

 9

 FINISHED 

Critical System Engineering Acceleration (CRYSTAL)

Start date: May 1, 2013, End date: Jul 31, 2016,

CRYSTAL aims at fostering Europe’s leading edge position in embedded systems engineering in particular regarding quality and cost effectiveness of safety-critical embedded systems and architecture platforms.Its overall goal is to enable sustainable paths to speed up the maturation, integration, and cross-sectoral reusability of technological and methodological bricks of the factories for safety-cr ...
Read Project

 70

 FINISHED 
Agricultural residues could represent a good source of biomass to convert into energy in particular wherever it is impractical to convert cropland to energy crop cultivation . According to FAO’s reportage (1997) , large quantities of ligneous biomass can be obtained from pruning operations carried out in Mediterranean fruit plantations. Agricultural residues therefore play an important role in any ...
Read Project

 19

 FINISHED 

IntegratinG Renewables in the EuropEaN Electricity Grid (IGREENGRID)

Start date: Jan 1, 2013, End date: Mar 31, 2016,

IGREENGrid focuses on increasing the hosting capacity for Distributed Renewable Energy Sources (DRES) in power distribution grids without compromising the reliability or jeopardizing the quality of supply. Based on the experience of six world class DRES integration Demo Projects in low & medium voltage grids (led by some of EEGI members; Distribution System operators –DSOs-) and other EU initiativ ...
Read Project

 12

 FINISHED 
"Ageing, sedentary behaviour,and obesity are predictors of osteoarthritis, and the combination of arthritis and obesity causes an undue stress on joints, and when conservative treatments no longer yield a satisfactory response, joint replacement becomes necessary. Despite the standardized procedures, a significant share of total joint replacements fail because the prosthesis becomes loose or becau ...
Read Project

 6

 FINISHED 
The present project is based on existing collaborations in different national and international projects, a common research interest toward fluid dynamics applied to industrial problems and existing, although immature, common training programs between the partners. We all partners agree that the current skills of science graduates in the technologies covered by this project are still insufficient ...
Read Project

 10

 FINISHED 
Insights gained in FI-PPP Phase 1 emphasize the need for novel ICT solutions that allow radical improvements for collaboration in business networks. Primary sectors demanding such solutions are Agri-Food and Transport & Logistics industries: several actors (incl. enterprises, authorities, service providers) need to exchange information & communicate across org. borders to conduct business. Current ...
Read Project

 39

 FINISHED 

My Neighbourhood | My City (My Neighbourhood)

Start date: Jan 1, 2013, End date: Jun 30, 2015,

The My Neighbourhood solution will combine new digital technologies and techniques, such as social gaming principles (gamification), with the Living Lab methodology to help strengthen existing ties and resolve communal issues in the real, day-to-day world of the neighbourhood. The solution will be rooted in an open My Neighbourhood site that 1) combines the data and functionality of existing City ...
Read Project

 16

 FINISHED 
The aim of the project is to develop a user-friendly policy simulation system allowing forecasting and visualizing the socio-economic potential impact of public policies. This will allow policy makers to make experiments with different socio-economic designs, with the participation of citizens and potentially impacted stakeholders, before a public policy is settled. It will also allow the differen ...
Read Project

 10

 FINISHED 

Combined Model-based Analysis and Testing of Embedded Systems (MBAT)

Start date: Nov 1, 2011, End date: Dec 31, 2014,

"One of the most important strategic sectors in which Europe is developing, integrating and delivering high-quality products is the transportation domain. Here, high-class safety-related products as e.g. airplanes, cars and trains have a huge market impact. More and more of the market value of these vehicles is gained by embedded systems inside these products, and the number and importance of thes ...
Read Project

 42

 FINISHED 
Technical limitations constrain the use of wind turbines (WT) in extreme (cold) climates. These arise in Northen (Scandinavia, Scotland) as well as high altitude (Switzerland, south Germany, France, Spain, Italy, Austria) regions in the EU. The main challenge is ice formation on the WT blades which significantly reduces their performance and can ultimately cause shutdown. Power losses related to i ...
Read Project

 9

 FINISHED 

Electricity Demand and Supply Harmonizing for EVs (e-DASH)

Start date: Sep 1, 2011, End date: Nov 30, 2014,

The sustainable integration of the electric vehicles requires an intelligent charging system for the real-time\nexchange of charge related data between FEVs and the grid in order to allow the management of:\n• high-current fast-charging for large numbers of FEVs in a brand-independent way\n• price-adaptive charging/reverse-charging at optimum price for the customer\n• the real-time grid balancing ...
Read Project

 15

 FINISHED 
Government authorities, restoration architects and conservation scientists have always had to face the problem of deterioration of historic building materials, in particular stone, wood and glass; an issue that has become more and more urgent since climate change has worsened natural decay and the impact of atmospheric pollution. In addition in recent years socio-economic requirements have claimed ...
Read Project

 14

 FINISHED 
"Eco-innovations (EI), i.e. “green” technologies, processes, products and services have an increasing impact for the global competitiveness of European industry. To reach a worldwide leading position, it needs to boost the implementation of EI in industry, especially in SMEs. The ERA-Net on EI will support research and dissemination in the field of EI.The success of EI is determined by criteria th ...
Read Project

 27

 FINISHED 

Secured Urban Transportation - European Demonstration (SECUR-ED)

Start date: Apr 1, 2011, End date: Sep 30, 2014,

"SECUR-ED Project federates, with a delegated management and in a balanced manner, major operators and top industrial integrators to enhance the security of urban public transportation in medium and large cities, through live demonstrations.Based on the best practices, in a very diverse societal and legacy environment, SECUR-ED will aggregate a consistent and interoperable mix of technologies and ...
Read Project

 44

 FINISHED 

All Condition Operations and Innovative Cockpit Infrastructure (ALICIA)

Start date: Sep 1, 2009, End date: Aug 31, 2014,

"ALICIA addresses the ACARE objective of increasing time efficiency within the future air transport system. The aim will be to develop a new and scalable cockpit application which can extend operations of aircraft in degraded conditions – “All Conditions Operations”. A key objective will be to deliver an extensible application that can be applied to many aircraft types. This will necessarily enta ...
Read Project

 42

 FINISHED 
Description SOS project becomes Smart Open Services for European Patients (epSOS) to better reflect the focus on patient needs.Patient summaries and ePrescriptionsPatient summaries and electronic prescriptions (ePrescriptions) are two key services that enable high quality medical care. Such health records provide health professionals with ...
Read Project

 45

 FINISHED 
"Climate Change is one of the most important issues facing the world in the 21st century and challenges all four (ecological, economical, social and cultural) dimensions of sustainable development. Europe takes a leading role in the necessary response to these challenges. Severe impacts are unavoidable and European adaptation strategies must be supported by a coherent base of knowledge on its key ...
Read Project

 23

 FINISHED 
"EURAXLES is a 3 year R&D project uniting 23 partners across Europe including 6 axle manufacturers, 4 railway operators/IMs, 2 system integrators, 3 technology suppliers, 5 universities, 2 rail sector associations and 1 consulting firm. The consortium is well-positioned to provide a common R&D approach to axle design, protection, inspection and maintenance which will have an impact on standards, r ...
Read Project

 24

 FINISHED 
Groundwater resources are facing increasing pressure from consumptive uses (irrigation, water supply, industry) and contamination by diffuse loading (e.g. agriculture) and point sources (e.g. industry). This cause major threat and risks to our most valuable water resource and on ecosystems dependent on groundwater. New information is need on how to better protect groundwaters and groundwater depen ...
Read Project

 28

 FINISHED 

Clean European Rail - Diesel (CleanER-D)

Start date: Jun 1, 2009, End date: Jan 31, 2014,

The study of CER, UNIFE, UIC and Euromot of the railway and engine manufacturing industries concluded on a risk of disruptive effect of the NRMM Directive application on the railway diesel vehicle supply market, leading to a possible risk of a partial modal shift from rail to road on regional passenger lines and freight transportation specialized routes, with even foreseeable consequences on the o ...
Read Project

 27

 FINISHED 

Building service testbeds on FIRE (BonFIRE)

Start date: Jun 1, 2010, End date: Dec 31, 2013,

Description BonFIRE will design, build and operate a multi-site Cloud prototype FIRE facility to support research across applications, services and systems at all stages of the R&D lifecycle, targeting the services research community on Future Internet.The BonFIRE vision is to give researchers in these areas access to a facility that support ...
Read Project

 26

 FINISHED 
The SmartAgriFood project addresses the food and agribusiness as a use case for the Future Internet. The intelligence, efficiency, sustainability and performance of the agri-food sector can be radically enhanced by using information & decision support systems that are tightly integrated with advanced internet-based networks & services. Concurrently, the sector provides extremely demanding use case ...
Read Project

 23

 FINISHED 

Multi-source Energy Storage System Integrated in Buildings (MESSIB)

Start date: Mar 1, 2009, End date: Feb 28, 2013,

The overall objective of MESSIB is the development, evaluation and demonstration of an affordable multi-source energy storage system (MESS) integrated in building, based on new materials, technologies and control systems, for significant reduction of its energy consumption and active management of the building energy demand. This new concept will reduce and manage smartly the electrical energy req ...
Read Project

 24

 FINISHED 
The GISELA objective is to guarantee the long-term sustainability of the European – Latin American e-Infrastructure and thus ensure the continuity and enhancement of the Virtual Research Communities (VRC) using it. The project will focus on:•\tImplementing the Latin American Grid Initiative (LGI) sustainability model rooted on National Grid Initiatives (NGI) or Equivalent Domestic Grid Structures ...
Read Project

 31

 FINISHED 

Ultrafast control of quantum systems by strong laser fields (FASTQUAST)

Start date: Sep 1, 2008, End date: Aug 31, 2012,

"The objective of this project is to set up an Initial Training Network on advanced techniques for ultrafast manipulation of atoms and molecules by strong femtosecond laser pulses. The project comprises a diverse range of applications of strong-field coherent control to ultrafast spectroscopy and microscopy; nuclear and electron wavepacket dynamics; alignment of molecules with applications to coll ...
Read Project

 13

 FINISHED 
Future networks became a central topic with a large debate whether moving towards the new networked society will be evolutionary or disruptive. In the future networked society the physical and the digital worlds will merge based on the massive usage of wireless sensor networks. Objects will be able to identify and locate themselves and to communicate through radio interfaces. Self-organized edge n ...
Read Project

 37

 FINISHED 
"The embedded safety-critical systems design and development industry is facing increasing complexity and variety of systems and devices, coupled with increasing regulatory constraints while costs, performances and time to market are constantly challenged.This has led to a profusion of enablers (new processes, methods and tools), which are neither integrated nor interoperable because they have bee ...
Read Project

 54

 FINISHED 

Facility for Antiproton and Ion Research (FAIR)

Start date: Aug 1, 2007, End date: Jan 31, 2012,

"Subject of this EU project is the implementation of the FAIR GmbH for the construction of the new research infrastructure FAIR. The "Facility for Antiproton and Ion Research" is an integrated system of particle accelerators which will provide high energy and high intensity beams of ions from antiprotons to uranium with unprecedented quality for basic research in different fields of phys ...
Read Project

 24

 FINISHED 
Description Building the Future Optical NetworkMain ObjectivesThe BONE-network brings together 49 laboratories and research institutes from al over Europe in a close networking infrastructure, built on the foundations laid down by the FP6 ePhoton/ONe Network and represents the research activities within Europe in the field of Optical Netw ...
Read Project

 53