Search for European Projects

4 European Projects Found

Searched on 125080 European Projects

 FINISHED 

Integrated, Intelligent modular power electronic converter (I2MPECT)

Start date: May 1, 2015, End date: Apr 30, 2018,

Increasingly demanding requirements in the transportation industry for higher efficiency and reduced carbon footprint are leading to an ever increasing interest in electrically operated drives which offer significant benefits over their pneumatic or hydraulic counterparts. More electric aircraft technologies with fully electrical actuation and environmental conditioning systems are moving from top ...
Read Project

 9

 FINISHED 

CONSTRUCTION OF BESPOKE EVALUATION POWER MODULES~(MATPLAN) (MATPLAN)

Start date: Apr 1, 2012, End date: Mar 31, 2014,

"The objective of this proposal is to develop double side cooled packaging solutions for semiconductors eliminating the use of inherently unreliable aluminium wire bonds and replacing with seamless contacting techniques to either side of the active semiconductor thereby providing a very reliable low thermal resistance,low inductance contact . The solutions developed using innovative additive laser ...
Read Project

 2

 FINISHED 

Universal Failsafe IGBT Package for robust power transmission (UniPack)

Start date: Dec 1, 2011, End date: Nov 30, 2013,

Through a mixture of applied research and development, the Uni-Pack project will deliver technologies to reduce the manufacturing costs and improve the performance of plastic packaged IGBT (Insulated gate bipolar transistor) modules, in particular those for use in Voltage Source Converters (VSC) for High Voltage Direct Current (HVDC) power transmission. VSC technology enables efficient access to r ...
Read Project

 8

 FINISHED 
"Power Module Reliability (PEMREL) addresses the clean sky’s call “Sample PEM (Power Electronic Module) construction for testing, characterisation and manufacturability assessment. This proposal aims to compliment other research into the development of an all SiC 10kW inverter, implemented in a double-side cooled, non-hermetic sandwich packaging technology (no bondwires), able to withstand a nomin ...
Read Project

 3