Search for European Projects

Over 40 European Projects Found

Searched on 125080 European Projects

 FINISHED 
MR-guided Focused Ultrasound Surgery (MRgFUS) combines high intensity focused ultrasound for thermal ablation of diseased tissue with MR imaging to visualise the tumour and surrounding anatomy and to provide MR thermal feedback.However, MRgFUS treatment of the liver and other abdominal organs present tremendous technological challenges, including motion due to breathing and shielding of the target ...
Read Project

 11

 FINISHED 
AFLoNext is a four year EC L2 project with the objective of proving and maturing highly promising flow control technologies for novel aircraft configurations to achieve a quantum leap in improving aircraft’s performance and thus reducing the environmental footprint. The project consortium is composed by forty European partners from fifteen countries. The work has been broken down into seven work p ...
Read Project

 41

 FINISHED 

Integrated Research Programme on Wind Energy (IRPWIND)

Start date: Mar 1, 2014, End date: Feb 28, 2018,

IRPWIND is an integrated research programme that combines strategic research projects and support activities within the field of Wind Energy, with the aim of leveraging the long term European research potential. The concept behind this programme is built on the success of existing initiatives supporting the SET Plan Agenda such as the European Energy Research Alliance Joint Programme on Wind Ener ...
Read Project

 26

 FINISHED 
"Invasive fungal disease (IFD) is a leading cause of morbidity and mortality in the growing number of immunocompromised individuals, including particularly cancer patients, and bone-marrow or organ transplant recipients. The majority of IFD events are still caused by Candida and Aspergillus species, but there is an increasing incidence of resistant or previously uncommon moulds, yeasts and Zygomyc ...
Read Project

 6

 FINISHED 
"More and more industrial sectors (e.g. automotive, wind energy, boatbuilding) are demanding lightweight and high-performance composite materials, which represent a strong driver to develop the carbon fibre (CF) industry. Today, almost 80% of CF available on the market are using PolyAcryloNitrile (PAN) as the starting raw material because of its superior properties compared to pitch based carbon f ...
Read Project

 14

 FINISHED 
"The objective of INAPRO is to mobilise industry, member states and stakeholders to promote a new and innovative technical and technological approach right up to an Aquaponic system which allows a nearly emission free sustainable production and contributes remarkably to global food security for the 21st century. Considering that traditional Aquaponic systems, combining aquaculture and hydroponics, ...
Read Project

 18

 FINISHED 
Europe is preparing for a transition from a fossil- to a bio-based economy and this European Bioeconomy offers, as described in the EC Strategy Paper and Action plan “Innovating for Sustainable Growth: A Bioeconomy for Europe”, a comprehensive answer to key societal challenges, like creating and maintaining jobs, maintaining the competitiveness of the European Process Industries, adaptation to cli ...
Read Project

 12

 FINISHED 
EnReMilk will achieve significant water and energy savings in representative dairy case studies, mozzarella and milk powder production, across the supply chain. The dairy industry is an important food industry sector with sales of €124.3 billion and added value of €17.4 billion p.a. It is a high energy and water consumer, both overall and per unit production: up to 6.47 MWh (5.55 MWhth and 0.92 MW ...
Read Project

 17

 FINISHED 

Synergistic Fouling Control Technologies (SEAFRONT)

Start date: Jan 1, 2014, End date: Dec 31, 2017,

Marine biofouling, the unwanted colonization of marine organisms on surfaces immersed in seawater has a huge economic and environmental impact in terms of maintenance requirements for marine structures, increased vessel fuel consumption, operating costs, greenhouse gas emissions and spread of non-indigenous species. The SEAFRONT project will aim to significantly advance the control of biofouling a ...
Read Project

 19

 FINISHED 
A new EU 7th Framework Programme project, “LEANWIND” (Logistic Efficiencies And Naval architecture for Wind Installations with Novel Developments) seeks to apply lean principles to the offshore wind farm project lifecycle. The primary LEANWIND objective is to provide cost reductions across the offshore wind farm lifecycle and supply chain through the application of lean principles and the developm ...
Read Project

 32

 FINISHED 
WAKE-UP is an investigator-initiated, multicentre, randomised, double-blind, placebo-controlled trial designed to test efficacy and safety of MRI-based intravenous thrombolysis in patients with wake-up stroke. Every year 1.5 million patients suffer a stroke in the EU. Up to 20% of stroke patients wake up with stroke symptoms. Currently these patients are excluded from thrombolysis which is the onl ...
Read Project

 13

 FINISHED 
The ELECTRA Integrated Research Programme on Smart Grids (ELECTRA) brings together the partners of the EERA Joint Programme on Smart Grids (JP SG) to reinforce and accelerate Europe’s medium to long term research cooperation in this area and to drive a closer integration of the research programmes of the participating organisations and of the related national programmes. ELECTRA’s joint research a ...
Read Project

 23

 FINISHED 
The Valor-Plus supports the realisation of sustainable, economically viable closed loop integrated biorefineries through the development of new knowledge, (bio-)technologies and products that enable valorisation of key biorefinery by-products. The project comprises five key areas:• Pre-treatment and fractionation: development of a novel methodology for the controlled and selective breakdown, relea ...
Read Project

 14

 FINISHED 
The overall objectives of the INNWIND.EU project are the high performance innovative design of a beyond-state-of-the-art 10-20MW offshore wind turbine and hardware demonstrators of some of the critical components. These ambitious primary objectives lead to a set of secondary objectives, which are the specific innovations, new concepts, new technologies and proof of concepts at the sub system and t ...
Read Project

 29

 FINISHED 

Advanced Materials for Cardiac Regeneration (AMCARE) (AMCARE)

Start date: Nov 1, 2013, End date: Oct 31, 2017,

The Advanced Materials for Cardiac Regeneration (AMCARE) consortium aims to establish a translational research program to develop truly restorative therapies for acute myocardial infarction repair (MI) by optimising cardiac progenitor cell (CPC) therapy using smart biomaterials and advanced drug delivery, and coupling these therapeutics with minimally-invasive surgical devices. Two distinct biomat ...
Read Project

 10

 FINISHED 

AdVanced Aerodynamic Tools for lArge Rotors (AVATAR)

Start date: Nov 1, 2013, End date: Oct 31, 2017,

The motivation for the AVATAR project lies in the fact that upscaling wind turbine designs towards 10-20 MW requires radical innovations to make this feasible. Many of these innovationshave a strong aerodynamic component and can be considered as unconventional from an aerodynamic point of view. As such the analysis of the resulting rotor designs falls outside the validated range of applicability o ...
Read Project

 14

 FINISHED 
"Cultural Heritage (CH) is an integral element of Europe and vital for the creation of a common European identity and one of the greatest assets for steering Europe’s social, economic development and job creation. However, the current research training activities in CH are fragmented and mostly design to be of a single-discipline, failing to cover the whole lifecycle of Digital Cultural Heritage ( ...
Read Project

 14

 FINISHED 

Molecular Mechanisms of Fungal Pathogen Host Interactions (ImResFun)

Start date: Oct 1, 2013, End date: Sep 30, 2017,

ImResFun shall provide state-of-the-art training in infectious disease research and medical immunology targeting the most common human fungal pathogens, the opportunistic Candida species. The key objectives of ImResFun are: (i) to understand how immune cells and infected organs respond to invasion by Candida spp, (ii) to decipher host-defense mechanisms mediating pathogen elimination, and (iii) to ...
Read Project

 12

 FINISHED 

BIO INSPIRED BONE REGENERATION (BIO-INSPIRE)

Start date: Oct 1, 2013, End date: Sep 30, 2017,

BIO-INSPIRE will develop a new horizon in Orthopaedic Therapy by:1. Development of a technology platform that consists of new bio-active and bio-mimetic materials and their therapeutic applications for bone regenerative purposes.2. Training of the next generation of leading Tissue Engineering scientists in a multi-disciplinary way, leading them towards excellence in individual disciplines in combi ...
Read Project

 7

 FINISHED 

OceaNET

Start date: Sep 1, 2013, End date: Aug 31, 2017,

OceaNET concerns floating offshore wind and wave energy. These two areas are well aligned with the European Energy Strategic Plan and the Horizon 2020 programme.It aims at contributing to develop specific technologies and enabling technologies common to both energy sources. The research activities are structured in a number of research projects, which will provide the opportunity for a set of youn ...
Read Project

 10

 FINISHED 
The aim of demEAUmed project is the involvement of industry representatives, stakeholders, policy-makers and diverse technical and scientific experts in demonstrating and promoting innovative technologies, for an optimal and safe closed water cycle in Euro-Mediterranean tourist facilities, leading to their eventual market uptake. A representative resort placed in Catalonia, Spain, is considered as ...
Read Project

 16

 FINISHED 
Indoor Air Quality and emissions from building materials have been over the last decades a major challenge for scientists, industry and consumers. Traditional construction materials contribute to contaminants such as VOCs, formaldehyde, particulates and fibres. However, new eco-innovative building materials are able to provide a healthier indoor environment both by substituting source of contamina ...
Read Project

 22

 FINISHED 

Zero Emission bUs Systems (ZEEUS)

Start date: Nov 1, 2013, End date: Apr 30, 2017,

Electrification of the public transport is a raising trend in Europe, and electric buses are soon expected to enter markets as one of the most interesting options for matching urban environmental targets. Electrification is driven by both economics and politics. However, although technology is not yet fully matured and ready for wide commercialisation, a large demonstration project will facilitat ...
Read Project

 41

 FINISHED 
There exists a huge variety in the occurrence and characteristics of major incidents. Incident management stakeholders and in particular emergency health service providers have to deal with two basic challenges: The disproportion between the needs and the available human/material resources in the response capacity and the inherent time constraints of an emergency. These critical factors play a sem ...
Read Project

 12

 FINISHED 
"GLADIATOR (Graphene Layers: Production, Characterization and Integration) will enable the scalable production of cheaper, higher quality and larger area graphene sheets. The project will achieve this by optimizing the performance of CVD graphene (using doping), by increasing the throughput and size of CVD batch reactors, and by improving the process by which graphene is transferred for the CVD ca ...
Read Project

 16

 FINISHED 
The POLYMARK consortium represent the SME communities of Polymer Recyclers. The EU polymer recycling sector forms a vital part of the polymer sector and has an estimated annual turnover of €2,500 million generated by over 1,000 SMEs. However, our members have a major problem. Within the EU legislation exists (EC/282/2008) that states that plastic containers that have been used in a non-food applic ...
Read Project

 11

 FINISHED 
FastPass will establish and demonstrate a harmonized, modular approach for Automated Border Control (ABC) gates. FastPass brings together key players of the entire ABC value chain - system and component producers, research institutions, governmental authorities and end-users.The development of a harmonized ABC gate will be accomplished with continuous end-user involvement. The entire innovation pr ...
Read Project

 30

 FINISHED 

PREVENTIVE METHODOLOGY AND TOOLS TO PROTECT UTILITIES (PREEMPTIVE)

Start date: Mar 1, 2014, End date: Feb 28, 2017,

In recent years, we have witnessed an increase in the number and impact of cyber attacks. A successful attack might affect, or even endanger, daily human activities. Multiple countermeasures have been put in place to prevent Advanced Persistent Threat (APT) attacks, but they failed, allowing the latest generation of APT. The goal of PREEMPTIVE is to provide an innovative solution for enhancing exi ...
Read Project

 12

 FINISHED 
The consortium behind the SEMIAH project aims to pursue a major technological, scientific and commercial breakthrough by developing a novel Information and Communication Technology (ICT) infrastructure for the implementation of Demand Response (DR) in households. This infrastructure enables the shifting of energy consumption from high energy-consuming loads to off-peak periods with high generation ...
Read Project

 12

 FINISHED 

Green NUTrients RECovery systems (NUTREC)

Start date: Nov 1, 2013, End date: Feb 28, 2017,

Nutrient recovery from wastewater has been receiving growing interest, driven by stringent nutrient discharge limits from Wastewater Treatment Plants (WWTP) and by the potential for valorization of the recovered nutrients, e.g. for application as fertilizers, which can represent an additional revenue source to WWTP operators. The NUTREC project focuses on the recovery of ammonia (N) and phosphorus ...
Read Project

 9

 FINISHED 
SAFEWATER will develop an affordable global generic solution for the detection and management of drinking water crises resulting from CBRN contamination. SAFEWATER addresses the key drinking water incident management challenges at large, and in particular, the current shortcomings related to the contamination of water networks by CBRN agents - the lack of effective detection capacities, contaminat ...
Read Project

 11

 FINISHED 
BioEcoSIM comprises R&D and demonstration of an integrated approach and business model that has wide EU27 applicability in the agriculture sector. The new European Bio-economy Strategy aims to increase the use of bio-based raw materials. Thus, large quantities of fertilisers will be required. Therefore, this project targets to produce sustainable soil improving products that can be easily handled, ...
Read Project

 16

 FINISHED 
MobilePass will focus on research and development towards technologically advanced mobile equipment at land border crossing points. This will allow border control authorities to check European, visa-holding and frequent third country travellers in a comfortable, fast and secure way. The mobile solution incorporates new technologies needed in mobile scenarios and embeds them in the actual border cr ...
Read Project

 12

 FINISHED 
The objective of the FLOATGEN project is to demonstrate the technical and economic feasibility of two different multi-megawatt integrated floating-wind turbine systems in deep waters, never applied before to Mediterranean Sea conditions, in order to extend deep offshore wind resources and demonstrate decrease of costs for electricity generation down to competitive level. The project will also asse ...
Read Project

 10

 FINISHED 
Traditionally, the European manufacturing industry is characterized by innovative technology, quality processes and robust products which have leveraged Europe's industrialization. However, globalization has exposed Europe's industry to new emerging and industrialized manufacturing markets and the current economic challenges have decelerated the internal boost and investment, respectively. Hence, ...
Read Project

 29

 FINISHED 
Modular interposer architecture providing scalable heat removal, power delivery and communicationCarrICool will deliver a game-changing 3D packaging platform for scale-up of future, many-core, Exascale computing systems. The project will also develop a strategic supplier base in Europe for high-end HPC components and systems integration capabilities in the Exascale era. In CarrICool, advanced More ...
Read Project

 9

 FINISHED 
The principal objective of the HiPerDry project is to create a significant advance over the state of the art in hygroscopic polymer drying technology. A three year development programme which will culminate in the testing and demonstration of a prototype hygroscopic polymer drying system is proposed. The resulting combined microwave and super-heated steam drying (MW-SHSD) system will boast the fol ...
Read Project

 12

 FINISHED 
"Intrinsic (or residual) stresses, resulting from manufacturing or processing steps, mostly define the performance and limit the lifetime of nanostructured materials, thin films, coatings and MEMS devices.The established techniques for micron-scale measurement of residual stress still have strong limitations, e.g. in terms of spatial resolution, lack of depth sensing, their applicability on non-cr ...
Read Project

 16

 FINISHED 

Four Dimensional Cultural Heritage World (4D-CH-World)

Start date: Jan 1, 2013, End date: Dec 31, 2016,

This project4D-CH-World aims to analyze, design, research, develop and validate an innovative system integrating the latest advances in computer vision and learning, as well as, 3D modeling and virtual reality for the rapid and cost-effective 4D maps reconstruction in the wild for personal use, and support the aim of our European Commons and the digital libraries EUROPEANA and UNESCO Memory of the ...
Read Project

 9

 FINISHED 

VISUALIZATION FOR EXTREMELY LARGE-SCALE SCIENTIFIC COMPUTING (VELaSSCo)

Start date: Jan 1, 2014, End date: Dec 31, 2016,

VeLASSCo will provide new visual analysis methods for large-scale simulations serving the petabyte era and preparing the exabyte era by adopting Big Data tools/architectures for the engineering and scientific community, leveraging new ways of in-situ processing for data analytics and hardware accelerated interactive visualization.Regardless of its origin, in the near future the challenge will not ...
Read Project

 7